| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.2 LAccepted-AOC VILL HAFLONG BOIDURA P O P S HAFLONG DIST DIMA HASAO ASSAM PIN 788819 | HAFLONG | DIMA HASAO | ASSAM | 788819 | ₹67.2 L | L1 | Accepted-AOC Awarded |
| 2 | L1₹67.2 LRejected-Finance | ₹67.2 L | L1 | Rejected-Finance Refer to Financial minutes. |
| Sl No | Description | Qty | Unit | David Phonglo L1 | AMIN KARIGAPSA L1 |
|---|---|---|---|---|---|
| 1.01 | Clearing and grubbing land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 0.06 | Ha | 49,572.88 ₹2,776.08 | 50,228.08 ₹2,812.77 |
| 1.02 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil, manual means, with dewatering upto the depth of 3m. | 840.4 | cum | 144 ₹1.2 L | 143.51 ₹1.2 L |
| 1.03 | Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Tabel 1300.1, no fragment weighing less than 25kg laid dry complete as per drawing and technical specifications Clause 1301. | 114.6 | cum | 1,763.72 ₹2.0 L | 1,763.72 ₹2.0 L |
| 1.04 | Providing and laying of boulder apron laid in wire crates with 4mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 percent extra for laps and joints laid with stone boulders weighing not less than 25kg each as per drawing & technical Specifications Clause 1301. For Boulder Revetment | 2,353.12 | cum | 2,635.4 ₹62.0 L | 2,635.41 ₹62.0 L |
| 1.05 | Backside filling of boulder Revetment. | 966.68 | cum | 191.82 ₹1.9 L | 191.82 ₹1.9 L |
| 1.06 | Cost of RCC signboard including painting, writing & fixing at Project site. | 1 | no | 10,243 ₹10,243 | 10,594.58 ₹10,594.58 |
Tender Value
₹74.7 L
EMD Value
₹1.5 L
Closing Date
9 Jan 2026, 1:00 pmClosed
Director of Soil Conservation
O/o The DSC, Bhumi sangrakshan bhanvan, RGB Road, Guwahati -05
Protection of Soil Erosion near Idol immersion at Rajabari 2 under RIDF - XXXI
2025_SCD_49475_9
Tender/NIT/Pt-I/2025-26/5606
Open Tender
Civil Works
120 days
Haflong Soil Conservation Division
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,495
₹1.5 L
Yes
O/o The DSC, Assam
13 Mar 2026
19 Dec 2025
9 Jan 2026
26 Dec 2025
9 Jan 2026
30 Dec 2025
29 Dec 2025
Clearing and grubbing land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil, manual means, with dewatering upto the depth of 3m.
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Tabel 1300.1, no fragment weighing less than 25kg laid dry complete as per drawing and technical specifications Clause 1301.
Providing and laying of boulder apron laid in wire crates with 4mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 percent extra for laps and joints laid with stone boulders weighing not less than 25kg each as per drawing & technical Specifications Clause 1301. For Boulder Revetment
Backside filling of boulder Revetment.
Cost of RCC signboard including painting, writing & fixing at Project site.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
HaflongRajabari.pdf
Tender Documents • 1.02 MB
BOQ_78518.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid