Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance PLOT NO 13 II ND CROSS STREET RAMESH NAGAR VALASARAVAKKAM CHENNAI 600 087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance NO 172 VAZHAPANTAL ROAD STREET MAMBAKKAM ARCOT TALUK VELLORE DIST 632 318 | MAMBAKKAM | ARCOT TALUK | TAMIL NADU | 632318 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | PUDUKKOTTAI | TAMIL NADU | 621308 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹19,100
Closing Date
15 Jun 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/GCC-I/CHENNAI
A-10, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai-32
as per NIT
2021_EB_201890_1
OT-006/21-22 of SE/GCC-I/CNI
Open Tender
Civil Works
Works
120 days
Ennore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹19,100
Yes
16 Jun 2021
2 Jun 2021
16 Jun 2021
2 Jun 2021
15 Jun 2021
2 Jun 2021
90 days
Amount
Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site.
Providing and laying Sand filling including cost of labour, transport, consolidation, lead and lift etc., complete as per standerd specification and as directed by the department at site.
Providing and laying P:C:C 1:4:8 using 40mm HBG metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site
RCC 1:1.5:3 using 12-20 mm HBG metal for raft foundation including cost of all materials labour, lead, lift, etc., complete but excluding cost of steel reinforcement.
R.C.C. 1:1.5:3 using 12-20mm metal with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Providing steel reinforcement for all RCC works including cost of all materilas steel, binding wire, labour, lead, lift, cutting, bending, typing and binding and placing in position etc., complete as directed by the department engineer at site.
Providing and laying P:C:C 1:2:4 using 20mm HBG metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site
Providing and laying P.C.C 1:2:4 using 20mm HBG stone for Plinth with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Plastering in CM 1:3 12 mm thick including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site .
Providing grout holes for equipment structure at required position including cost of all materials, curing,labour, lead and lift etc., complete as per standard specification and as directed by the department engineer at site.
Labour charges for assembling of template in correct position and aligenment for various equipment plinth and grouting the foundation bolts including cost of all materials transport, labour, lead, lift etc., complete as per standard specification and as directed by the dept. Engineer at site. (The template will be make own arrangement by the contractor)
Filling with stone dust including cost of all labour, transport, materials, leads, lift,etc., complete and as directed by the department engineer at site.
Filling with 20 mm B.G metal including cost of all labour, materials, transport, leads, lift,etc., complete and as directed by the department engineer at site.
Fabrication and supplying of foundation bolt and nut or specified length (1m) threading for a length of 75 cm and 15 cm thread at top and 10 cm "L" at bottom (Total length of bolt 1m) hot dip galvinising of bolt including supply of 2 nos of GI nuts and washers and fixing in the position as directed by the engineer at site including assembling of template etc., cost of template, all materials, labour, lead, lift etc completed as directed by the department engineer at site.
Colour washing two coats using cement paint over one coat of white washing including cost of all materials, labour, lead lift etc., complete as per standard specification and as directed by the department engineer at site.
Supplying, fabrication of MS angle including cost of MS angle, flats as per drawing and specification and galvanising, placing in position including cost of all materials, galvanizing charges, transportation, labour, lead etc., complete as directed by the department engineer at site.
Supplying and laying of 200 mm dia (8 inches dia) good quality PVC pipe for cabe ducts jointed with extra joints including laying pipe from yard to trench etc., as per standard specification including cost of all materials, lead & lift etc.., complete as directed by the department engineer at site.
Labour charges for spreading and levelling the excavated earth including cost of labour, lead and lift etc., complete as directed by the department engineer at site.
Labour charges for dismantling of Reinforced Cement Concrete by drilling holes and breaking with compressor drilling machine in restricted area and disposing the debris away from the SS permises including all materials, labour, lead and lift etc., complete as directed by the department engineer at site.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
Dillibabu
VM ENTERPRISES
S S AND CO
PERUMAL.S.K
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .