| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance R O VILL CHEOG TEH THEOG DISTT SHIMLA | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹4.7 L (3.65%)Admitted-Finance | ₹1.3 Cr+₹4.7 L (3.65%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹6.3 L (4.95%)Admitted-Finance | ₹1.3 Cr+₹6.3 L (4.95%) | L3 | Admitted-Finance |
| 4 | L4₹1.4 Cr+₹12.0 L (9.39%)Admitted-Finance VILLAGE KUNDLA P O SHAMTI TEHSIL DISTT SOLAN HP | SOLAN | HIMACHAL PRADESH | 171102 | ₹1.4 Cr+₹12.0 L (9.39%) | L4 | Admitted-Finance |
| 5 | L5₹1.4 Cr+₹14.4 L (11.2%)Admitted-Finance | ₹1.4 Cr+₹14.4 L (11.2%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Sunil Khachi L10 | Mohinder Verma L5 | Vinay Thakur L4 | RAJESH SHARMA L8 | akash L2 | KAMAKSHA POWER PROJECTS AND CONSTRUCTION PRIVATE LIMITED L3 | PAWAN KUMAR SHANDIL L7 | MANTU KUMAR GUPTA L6 | suresh jagta L1 | Dinesh Chauhan L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing jungle including uprooting of rank vegetation, grass,brush wood, trees and saplings of girth upto 30 cm. measured at a height of 1 meter above ground and removal of rubbish up-to all lead and lifts. | 1,000 | Per Cubic Metre | 32 ₹32,000 | 3 ₹3,000 Lowest | 5 ₹5,000 | 4 ₹4,000 | 9 ₹9,000 | 30 ₹30,000 | 10 ₹10,000 | 10 ₹10,000 | 5 ₹5,000 | 20 ₹20,000 |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (not exceeding 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth upto all leads and lifts as directed by Engineer-incharge and disposing of all excavated earth at dumping site ( To be arranged by the Contractor) as per satisfacation of Engineer -in- Charge through all modes of transportation including head load , animal load or mechnical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechnical means and labour( If required). All useful material such as stone , shingles aggregate and slates Shall be properly Stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation as per direction of the Engineer -in -charge . The recovery for stones, weather useful or not, for the minimum quatom of 105.12 cubic meter @ Rupee 300/- Only (Rupees. Three hundred) per cubic meter Shall be effected on pro rata basis in all circumstances. Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 500 | Per Cubic Metre | 304 ₹1,52,000 | 200 ₹1,00,000 | 150 ₹75,000 | 250 ₹1,25,000 | 250 ₹1,25,000 | 210 ₹1,05,000 | 250 ₹1,25,000 | 400 ₹2,00,000 | 99 ₹49,500 Lowest | 350 ₹1,75,000 |
| 3.00 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed by Engineer-incharge and disposing of all excavated earth at dumping site ( To be arranged by the Contractor) as per satisfacation of Engineer -in- Charge through all modes of transportation including head load , animal load or mechnical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechnical means and labour( If required). All useful material such as stone , shingles aggregate and slates Shall be properly Stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation as per direction of the Engineer -in -charge . Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 1,500 | Per Cubic Metre | 306 ₹4,59,000 | 250 ₹3,75,000 | 450 ₹6,75,000 | 350 ₹5,25,000 | 225 ₹3,37,500 | 215 ₹3,22,500 | 300 ₹4,50,000 | 250 ₹3,75,000 | 129 ₹1,93,500 Lowest | 220 ₹3,30,000 |
| 4.00 | Filling Earth behind retaining wall including watering, ramming, consolidating and dressing complete Filter with granular material as per drawings & technical specification clause 1204.3.8 with in all leads, lifts of materials and other incidentals as per approved drawing, design and as directed by the Engineer-in-Charge. | 637.5 | Per Cubic Metre | 1,260 ₹8,03,250 | 100 ₹63,750 | 400 ₹2,55,000 | 100 ₹63,750 | 570 ₹3,63,375 | 202 ₹1,28,775 | 120 ₹76,500 | 90 ₹57,375 Lowest | 109 ₹69,487.5 | 500 ₹3,18,750 |
| 5.00 | Providing form work with steel plates 3.15mm. (Three point fifteen milimetre) thick welded with angle iron in frame 30X30mmx5mm.(Thirty into thirty into five millimeter) so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden/ steel battens and ballies and removal of the same for in situ-reinforced concrete and plain concrete work and as per HP. PWD. specifications of 1990 volume-I including carriage of materials, labour, tool and plant through all modes of transportation within all leads and lifts and as per direction of Engineer-in- Charge.The rate including of octory, royalty, malkana,toll tax, sal tax or other taxes imposed by goverment. In Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, Kerbs and steps etc. | 3,022.8 | Per Cubic Metre | 304 ₹9,18,931.2 | 200 ₹6,04,560 | 450 ₹13,60,260 | 75 ₹2,26,710 Lowest | 240 ₹7,25,472 | 190 ₹5,74,332 | 300 ₹9,06,840 | 250 ₹7,55,700 | 199 ₹6,01,537.2 | 280 ₹8,46,384 |
| 6.00 | Providing and laying mechanically mixed and vibrated cement concrete 1:4:8 (one cement isto four sand isto eight graded crushed stone aggregate 40mm (forty millimeter) nominal size) and curing complete, in or under water, including pumping or bailing out water/dewatering, removal of slush which may arise at the time of laying under water complete excluding the cost of form work in All works upto plinth level as per HPPWD specifications or as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts. The rate inclusive of Malkhana, Royality, Octroi, GST, toll tax or any taxes imposed by the Government. | 144 | Per Cubic Metre | 4,300 ₹6,19,200 | 4,000 ₹5,76,000 | 2,800 ₹4,03,200 | 3,900 ₹5,61,600 | 4,200 ₹6,04,800 | 3,800 ₹5,47,200 | 4,000 ₹5,76,000 | 2,000 ₹2,88,000 Lowest | 2,799 ₹4,03,056 | 3,800 ₹5,47,200 |
| 7.00 | Providing and laying plain cement concrete 1:3:6 (one cement; three sand : six graded crushed stone aggregate 20mm(twenty millimeters) nominal size mixed and vibrated mechanically and curing complete in or under water including pumping or bailing out water / dewatering removal of slush which may arise at the time of laying under water complete excluding the cost of form work in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, plain window sills, fillets, sunken floor etc, upto floor five level as per HP.PWD. Specifications, approved drawings, designs and entire satisfaction and directions of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government.. | 2,388 | Per Cubic Metre | 5,200 ₹1,24,17,600 | 5,000 ₹1,19,40,000 | 4,444 ₹1,06,12,272 | 5,150 ₹1,22,98,200 | 4,370 ₹1,04,35,560 Lowest | 4,650 ₹1,11,04,200 | 4,750 ₹1,13,43,000 | 5,000 ₹1,19,40,000 | 4,599 ₹1,09,82,412 | 5,200 ₹1,24,17,600 |
| 8.00 | Boulder filling behind retaining walls including ramming watering consolidation etc. with land burmost complete as per HP.PWD specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour equipment and material to various location through all modes of transportation in all leads and lifts, including all iincidential charges. | 450 | Per Cubic Metre | 1,170 ₹5,26,500 | 900 ₹4,05,000 | 800 ₹3,60,000 | 1,100 ₹4,95,000 | 620 ₹2,79,000 | 700 ₹3,15,000 | 1,100 ₹4,95,000 | 1,000 ₹4,50,000 | 837 ₹3,76,650 | 500 ₹2,25,000 Lowest |
| 9.00 | Providing weep holes in brick masonry/stone masonry /plan reinforced concrete abutment,wing wall,return wall with 100mm dia PVC pipe extending through the full with of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614,709,1204.3.7, including carriage of materials, labour, tool and plant through all modes of transportation within all leads and lifts and as per direction of Engineer-in- Charge.The rate including of octory, royalty, malkana,toll tax, sal tax or other taxes imposed by goverment. | 1,700 | Each | 270 ₹4,59,000 | 100 ₹1,70,000 | 150 ₹2,55,000 | 185 ₹3,14,500 | 227 ₹3,85,900 | 180 ₹3,06,000 | 270 ₹4,59,000 | 130 ₹2,21,000 | 69.27 ₹1,17,765.8 Lowest | 150 ₹2,55,000 |
Tender Value
₹1.8 Cr
EMD Value
₹2.2 L
Closing Date
2 Mar 2023, 6:00 pmClosed
EE HPSAMB Shimla
EE HPSAMB Shimla
C/o Modern Fruit and Vegetable Market Yard Tharmati, Distt. Shimla, H.P. SH C/o Protection wall.
2023_HPAMB_69540_1
HMB-EC-11/92-Vol-XI
Open Tender
Civil Works
Item Rate
150 days
Tharmati
Please refer Tender documents.
9 documents required · 9 mandatory
₹5,900
EE HPSAMB
₹2.2 L
17 Mar 2023
23 Feb 2023
4 Mar 2023
23 Feb 2023
2 Mar 2023
23 Feb 2023
Amount
Clearing jungle including uprooting of rank vegetation, grass,brush wood, trees and saplings of girth upto 30 cm. measured at a height of 1 meter above ground and removal of rubbish up-to all lead and lifts.
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (not exceeding 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth upto all leads and lifts as directed by Engineer-incharge and disposing of all excavated earth at dumping site ( To be arranged by the Contractor) as per satisfacation of Engineer -in- Charge through all modes of transportation including head load , animal load or mechnical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechnical means and labour( If required). All useful material such as stone , shingles aggregate and slates Shall be properly Stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation as per direction of the Engineer -in -charge . The recovery for stones, weather useful or not, for the minimum quatom of 105.12 cubic meter @ Rupee 300/- Only (Rupees. Three hundred) per cubic meter Shall be effected on pro rata basis in all circumstances. Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges.
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed by Engineer-incharge and disposing of all excavated earth at dumping site ( To be arranged by the Contractor) as per satisfacation of Engineer -in- Charge through all modes of transportation including head load , animal load or mechnical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechnical means and labour( If required). All useful material such as stone , shingles aggregate and slates Shall be properly Stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation as per direction of the Engineer -in -charge . Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges.
Filling Earth behind retaining wall including watering, ramming, consolidating and dressing complete Filter with granular material as per drawings & technical specification clause 1204.3.8 with in all leads, lifts of materials and other incidentals as per approved drawing, design and as directed by the Engineer-in-Charge.
Providing form work with steel plates 3.15mm. (Three point fifteen milimetre) thick welded with angle iron in frame 30X30mmx5mm.(Thirty into thirty into five millimeter) so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden/ steel battens and ballies and removal of the same for in situ-reinforced concrete and plain concrete work and as per HP. PWD. specifications of 1990 volume-I including carriage of materials, labour, tool and plant through all modes of transportation within all leads and lifts and as per direction of Engineer-in- Charge.The rate including of octory, royalty, malkana,toll tax, sal tax or other taxes imposed by goverment. In Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, Kerbs and steps etc.
Providing and laying mechanically mixed and vibrated cement concrete 1:4:8 (one cement isto four sand isto eight graded crushed stone aggregate 40mm (forty millimeter) nominal size) and curing complete, in or under water, including pumping or bailing out water/dewatering, removal of slush which may arise at the time of laying under water complete excluding the cost of form work in All works upto plinth level as per HPPWD specifications or as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts. The rate inclusive of Malkhana, Royality, Octroi, GST, toll tax or any taxes imposed by the Government.
Providing and laying plain cement concrete 1:3:6 (one cement; three sand : six graded crushed stone aggregate 20mm(twenty millimeters) nominal size mixed and vibrated mechanically and curing complete in or under water including pumping or bailing out water / dewatering removal of slush which may arise at the time of laying under water complete excluding the cost of form work in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, plain window sills, fillets, sunken floor etc, upto floor five level as per HP.PWD. Specifications, approved drawings, designs and entire satisfaction and directions of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government..
Boulder filling behind retaining walls including ramming watering consolidation etc. with land burmost complete as per HP.PWD specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour equipment and material to various location through all modes of transportation in all leads and lifts, including all iincidential charges.
Providing weep holes in brick masonry/stone masonry /plan reinforced concrete abutment,wing wall,return wall with 100mm dia PVC pipe extending through the full with of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614,709,1204.3.7, including carriage of materials, labour, tool and plant through all modes of transportation within all leads and lifts and as per direction of Engineer-in- Charge.The rate including of octory, royalty, malkana,toll tax, sal tax or other taxes imposed by goverment.
akash
KAMAKSHA POWER PROJECTS AND CONSTRUCTION PRIVATE LIMITED
Vinay Thakur
Mohinder Verma
MANTU KUMAR GUPTA
PAWAN KUMAR SHANDIL
RAJESH SHARMA
Dinesh Chauhan
Sunil Khachi
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
SBD_1_Tharmati_Shimla.pdf
Tender Documents • 3.27 MB
BOQ_104904.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .