Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹2.8 Cr+₹9.5 L (3.56%)Rejected-Finance NA | NA | NA | 121004 | L2 | Rejected-Finance L2 | |
| 3 | L3₹2.8 Cr+₹11.4 L (4.26%)Rejected-Finance BAROJ ROAD SHAKTI NAGAR COLONY DISTRICT BIJNOR | BIJNOR | BIJNOR | UTTAR PRADESH | L3 | Rejected-Finance L3 | |
| 4 | L4₹2.8 Cr+₹14.6 L (5.48%)Rejected-Finance | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | M/S S R CONSTRUCTION L2 | VIJAY ASSOCIATES L4 | MANOJ CHAUDHARY L3 | mamber singh L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in all type of soil including all lift and lead also including backfilling, watering and ramming of excavated earth into the trenches or into the space between the surface and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30M from the foundation trenches including T&P,labour etc complete. | 697.5 | cum | 30 ₹20,925 Lowest | 60 ₹41,850 | 70 ₹48,825 | 59 ₹41,152.5 |
| 2.00 | Earth work in clearance of internal section of canal in all type of soil, with all lift & lead ,the earth from clearance to be disposed in strengthening of canal banks and daula with its proper compaction, ramming & dressing complete i/c all cost of labour,T&P etc. | 57,425.75 | cum | 30 ₹17,22,772.5 | 25 ₹14,35,643.75 Lowest | 33 ₹18,95,049.75 | 38 ₹21,82,178.5 |
| 3.00 | Scrapping Internal section of canal i.e. Bed & Slope with silt upto 5 cm. i/c all cost of all labour T&P etc complete. | 63,666 | sqm | 30 ₹19,09,980 | 3 ₹1,90,998 | 3.5 ₹2,22,831 | 1.7 ₹1,08,232.2 Lowest |
| 4.00 | Earth work in embankment and daula of canal by power transported earth with a lead beyond 200 m and up to 1.0 km including excavation, loading, unloading, manual compaction in 20 cm layers, ramming and dressing the surface to the required levels and slopes and all lifts complete with all applicable taxes i/c all cost of labour, T&P etc. | 7,612.65 | cum | 30 ₹2,28,379.5 Lowest | 90 ₹6,85,138.5 | 130 ₹9,89,644.5 | 78 ₹5,93,786.7 |
| 5.00 | Bricks on edge soling with straight over brunt bricks on canal service road i/c joints filled with local sand , preparation of base to proper slope, ramming, dressing and i/c supply of bricks and all material, labour, T&P etc. requried for proper compaction of work. | 30,498 | sqm | 440 ₹1,34,19,120 Lowest | 460 ₹1,40,29,080 | 440 ₹1,34,19,120 Lowest | 450 ₹1,37,24,100 |
| 6.00 | Uprooting Jhunds from the canal and its proper disposel i/c all cost of all labour T&P etc complete. | 8,098 | Nos | 5 ₹40,490 Lowest | 12.47 ₹1,00,982.06 | 18 ₹1,45,764 | 6 ₹48,588 |
| 7.00 | Providing/Laying A20M10 (1 Cement : 3 Coarse sand: 6 grated stone aggregate) in foundation or floor including all cost of material, labour, T&P etc complete as required for proper completion of work. | 134.5 | cum | 5,000 ₹6,72,500 | 5,264 ₹7,08,008 | 5,000 ₹6,72,500 | 4,100 ₹5,51,450 Lowest |
| 8.00 | Ordinary Centering and shuttering of R.C.C./C.C. including rent of shuttering material, labour and T&P required for proper completion of daula, columns & walls etc complete. | 3,232 | sqm | 250 ₹8,08,000 Lowest | 393 ₹12,70,176 | 250 ₹8,08,000 Lowest | 350 ₹11,31,200 |
| 9.00 | Providing/Laying A20M20 (1 Cement : 1.5 Coarse sand: 3 grated stone aggregate) in foundation daula or wall including all cost of material, labour, T&P etc complete as required for proper completion of work. | 802.49 | cum | 5,000 ₹40,12,450 Lowest | 6,500 ₹52,16,185 | 6,600 ₹52,96,434 | 5,300 ₹42,53,197 |
| 10.00 | 1st class Brick (M-150) work with 1:4 cement and coarse sand mortar with all cost of material including T&P, labour, etc complete. | 621.01 | cum | 6,000 ₹37,26,060 | 5,543 ₹34,42,258.43 | 5,700 ₹35,39,757 | 5,400 ₹33,53,454 Lowest |
Tender Value
₹3.1 Cr
EMD Value
₹6.3 L
Closing Date
19 Sept 2026, 3:00 pmClosed
SE 1st IWC Meerut
Office of SE 1st IWC Meerut
As per the NIT
2026_UPIDC_1176941_5
10/SE-1/2026-27
Open Tender
Civil Works
Piece-work
150 days
Muzaffarnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹6.3 L
Office of SE 1st IWC Meerut
28 Sept 2026
11 Sept 2026
19 Sept 2026
11 Sept 2026
19 Sept 2026
11 Sept 2026
15 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in all type of soil including all lift and lead also including backfilling, watering and ramming of excavated earth into the trenches or into the space between the surface and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30M from the foundation trenches including T&P,labour etc complete. | 697.5 | cum | - | - |
| 2 | Earth work in clearance of internal section of canal in all type of soil, with all lift & lead ,the earth from clearance to be disposed in strengthening of canal banks and daula with its proper compaction, ramming & dressing complete i/c all cost of labour,T&P etc. | 57,425.75 | cum | - | - |
| 3 | Scrapping Internal section of canal i.e. Bed & Slope with silt upto 5 cm. i/c all cost of all labour T&P etc complete. | 63,666 | sqm | - | - |
| 4 | Earth work in embankment and daula of canal by power transported earth with a lead beyond 200 m and up to 1.0 km including excavation, loading, unloading, manual compaction in 20 cm layers, ramming and dressing the surface to the required levels and slopes and all lifts complete with all applicable taxes i/c all cost of labour, T&P etc. | 7,612.65 | cum | - | - |
| 5 | Bricks on edge soling with straight over brunt bricks on canal service road i/c joints filled with local sand , preparation of base to proper slope, ramming, dressing and i/c supply of bricks and all material, labour, T&P etc. requried for proper compaction of work. | 30,498 | sqm | - | - |
| 6 | Uprooting Jhunds from the canal and its proper disposel i/c all cost of all labour T&P etc complete. | 8,098 | Nos | - | - |
| 7 | Providing/Laying A20M10 (1 Cement : 3 Coarse sand: 6 grated stone aggregate) in foundation or floor including all cost of material, labour, T&P etc complete as required for proper completion of work. | 134.5 | cum | - | - |
| 8 | Ordinary Centering and shuttering of R.C.C./C.C. including rent of shuttering material, labour and T&P required for proper completion of daula, columns & walls etc complete. | 3,232 | sqm | - | - |
| 9 | Providing/Laying A20M20 (1 Cement : 1.5 Coarse sand: 3 grated stone aggregate) in foundation daula or wall including all cost of material, labour, T&P etc complete as required for proper completion of work. | 802.49 | cum | - | - |
| 10 | 1st class Brick (M-150) work with 1:4 cement and coarse sand mortar with all cost of material including T&P, labour, etc complete. | 621.01 | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.69 MB
TDUpload.pdf
Tender Documents • 6.43 MB
BOQ_2228501.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .