| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.5 LAdmitted-Finance NO 68 D BLOCK 2ND FLOOR S 1 FRONTIER HOMES ALIPH MAJITH NAGAR KELAMBAKKAM CHENGALPATTU DIST CHENNAI 603 103 | CHENGALPATTU | TAMIL NADU | 603103 | ₹16.5 L | L1 | Admitted-Finance |
| 2 | L2₹17.2 LAdmitted-Finance C3 SIDCO INDUSTRIAL ESTATE METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | ₹17.2 L | L2 | Admitted-Finance |
| 3 | L3₹18.4 LAdmitted-Finance | ₹18.4 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DEIVA CONTRACTOR L3 | Renga Engineering Works India Pvt Ltd L1 | ANBU ENGINEERING INDIA PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|
| 1.00 | Charges for Clearing the jungle growth and collecting the cleared debris of vegetation and disposed to suitable place away from the site as directed by the Engineer at site including all labour charges, hire charges for vehicle, tools and plants, lead, lift, etc., complete. | 112 | m² | 12 ₹1,344 | 9.49 ₹1,062.88 | 10 ₹1,120 |
| 2.00 | Charges for Earth work excavation for foundation and depositing on bank with initial lead of 10m and initial lift of 2 m in all types of soil as directed by the Engineer at site, including cost of all labour charges, tools and plants, transport, lead, lift, etc., complete. | 10.21 | m³ | 170 ₹1,735.70 | 153 ₹1,562.13 | 160 ₹1,633.60 |
| 3.00 | Charges for MR&DMR(Not requiring blasting )Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2 m in medium rock and dense medium rock not requiring blasting as directed by the Engineer at site, including cost of all labour charges, tools and plants, transport, lead, lift, etc., complete. | 12.47 | m³ | 425 ₹5,299.75 | 397 ₹4,950.59 | 415 ₹5,175.05 |
| 4.00 | Charges for Providing PCC 1:4:8 using 40mm HBG metal for foundation as directed by the Engineer at site, including cost of all materials, labour charges, curing, lead, lift, etc., complete. | 1.36 | m³ | 6,850 ₹9,316 | 6,549 ₹8,906.64 | 6,834 ₹9,294.24 |
| 5.00 | Charges for Providing PCC 1:2:4 using 20 mm HBG metal for foundation as directed by the Engineer at site, including shuttering charges, cost of all materials, labour charges, curing, lead, lift, etc., complete. | 17.01 | m³ | 11,700 ₹2.0 L | 11,144 ₹1.9 L | 11,628 ₹2.0 L |
| 6.00 | Charges for Supply, fabrication and placing in position of vertical column posts and inclined struts using I BEAM 200x100x5.7 mm, welded with base plate , ISA 60x60x8 mm to strengthen of stay , the rate includes cost for supply of MS beams, angles, MS base plate and charges for fabrication, aligning, placing in position, erecting the posts, all labour charges, scaffolding charges, welding, bolts and nuts if required, all lead, lift, etc., complete | 8,177.26 | Kg | 190 ₹15.5 L | 168 ₹13.7 L | 175 ₹14.3 L |
| 7.00 | Charges for Painting the structural steel work with two coats of enamel paint of approved quality and color over a coat of primer including cost of all materials, labour charges, scaffolding charges, brushes, lead, lift, etc., complete. | 243.04 | m² | 300 ₹72,912 | 280 ₹68,051.20 | 290 ₹70,481.60 |
Tender Value
Refer Docs
EMD Value
₹16,900
Closing Date
17 Feb 2026, 2:00 pmClosed
CE/MTPS-II
MTPS-II/Mettur Dam
MTPS-II-M-II-CHP-I Division - Providing the stay support for the existing dust screen provided near JT-7 to PCH area including supply, fabrication and erection etc
2026_EB_650564_1
OT19/25-26
Open Tender
Miscellaneous Works
90 days
MTPS-II/Mettur Dam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹16,900
Yes
11 Mar 2026
3 Feb 2026
18 Feb 2026
3 Feb 2026
17 Feb 2026
3 Feb 2026
Charges for Clearing the jungle growth and collecting the cleared debris of vegetation and disposed to suitable place away from the site as directed by the Engineer at site including all labour charges, hire charges for vehicle, tools and plants, lead, lift, etc., complete.
Charges for Earth work excavation for foundation and depositing on bank with initial lead of 10m and initial lift of 2 m in all types of soil as directed by the Engineer at site, including cost of all labour charges, tools and plants, transport, lead, lift, etc., complete.
Charges for MR&DMR(Not requiring blasting )Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2 m in medium rock and dense medium rock not requiring blasting as directed by the Engineer at site, including cost of all labour charges, tools and plants, transport, lead, lift, etc., complete.
Charges for Providing PCC 1:4:8 using 40mm HBG metal for foundation as directed by the Engineer at site, including cost of all materials, labour charges, curing, lead, lift, etc., complete.
Charges for Providing PCC 1:2:4 using 20 mm HBG metal for foundation as directed by the Engineer at site, including shuttering charges, cost of all materials, labour charges, curing, lead, lift, etc., complete.
Charges for Supply, fabrication and placing in position of vertical column posts and inclined struts using I BEAM 200x100x5.7 mm, welded with base plate , ISA 60x60x8 mm to strengthen of stay , the rate includes cost for supply of MS beams, angles, MS base plate and charges for fabrication, aligning, placing in position, erecting the posts, all labour charges, scaffolding charges, welding, bolts and nuts if required, all lead, lift, etc., complete
Charges for Painting the structural steel work with two coats of enamel paint of approved quality and color over a coat of primer including cost of all materials, labour charges, scaffolding charges, brushes, lead, lift, etc., complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_780026.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid