Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹26.5 L
EMD Value
₹53,000
Closing Date
27 Nov 2026, 5:30 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Karnataka Forest Department
ACF SDIV KHANAPUR
Advance Pitting Works at Nandagad FS No 405 (50 Ha) in Khanapur range khanapur sub division under CAMPA head
KFD/2026-27/OW/WORK_INDENT41523/CALL-2
KFD/2026-27/OW/WORK_INDENT41523/CALL-2
Open
Other Works
Two Tender Document System(Two Cover)
KFD ACF Territorial Sub Division Office Khanapur
Last five years achieved at least in two financial years a minimum financial turnover of Rs. One time of Indent amount.
Satisfactoriy completed at least 50% of this contract as a Prime contractor of same works not less than 50% of Tender amount ( work done certificate for same work should be submitted which is issued by Deputy Conservator of Forests only).For Reserved Tenders Satisfactoriy completed at least 25% of this contract as a Prime contractor of same works not less than 25% of Tender amount ( work done certificate for same work should be submitted which is issued by Deputy Conservator of Forests only).
Each Tenderer should further demonstrate Availability of owning the following Key and critical equipment for this work.GPS and other Survey instruments And Soil excavator such as Hitachi/Jcb
Line of credit including E-tender Indent No & addressed to undersigned not less then 30% of the Tender amount received from any Nationalized Bank
Contractor should be registered as Forest Contractor in Karnataka Forest Department for the year 2026-27
Income tax returned filed documents for the last three financial year to be enclosed.
Photo Copy of Pan Card
A copy of GST no registered under GST act.
Details of goods carriage vehicle, labor service, list of machineries & materials, equipments owned by the contractor.
For address proof any only copy of Adhar,PAN Card, Voter ID, Telephone bill within two months, Ration Card, Bank Pass book, ID issued any Corporation/TP to be uploaded).
A copy of List of Skilled, semi skilled, un skilled labours including EPF & ESI details to be uploaded) along with copy of Registration in Labour Department, EPF & ESI Registration Certificate
Caste Certificate Compulsory (for reserved category tenders)
Submission of Bid capacity (5 years Turnover) Amount of works contracted by contractors in all departments in the year 2026-27 (indent-wise) and turnover for the last five years
₹670
₹53,000
14 Nov 2026
14 Nov 2026
30 Nov 2026
20 Nov 2026
KARNATAKA FOREST DEPARTMENT
BELAGAVI DIVISION - ADVANCE PITTING WORK ESTIMATES 2026-27
Sl.No Estimate No Head of Account Location Extent Total Amount (Rs.)
1 85 2406-04-103-1-06-Others-140-Minor works(Campa) Chapoli F.S.NO 61-P-I 50.00 Ha 2,560,000.00
2 86 2406-04-103-1-06-Others-140-Minor works(Campa) Chapoli F.S.NO 61-P-II 50.00 Ha 2,560,000.00
3 87 2406-04-103-1-06-Others-140-Minor works(Campa) Jamboti F.S.NO 305 50.00 Ha 2,560,000.00
4 88 2406-04-103-1-06-Others-140-Minor works(Campa) Nandgad F.S.NO 405 50.00 Ha 2,560,000.00
5 89 2406-04-103-1-06-Others-140-Minor works(Campa) Kalamani F.S.NO 37 50.00 Ha 2,560,000.00
6 90 2406-04-103-1-06-Others-140-Minor works(Campa) Kalamani F.S.NO 101 50.00 Ha 2,560,000.00
7 91 2406-04-103-1-06-Others-140-Minor works(Campa) Morab F.S.NO 22 50.00 Ha 2,560,000.00
8 92 2406-04-103-1-06-Others-140-Minor works(Campa) Kinaye F.S.NO 166 50.00 Ha 2,560,000.00
9 93 2406-04-103-1-06-Others-140-Minor works(Campa) Jamboti F.S.NO 97 50.00 Ha 2,560,000.00
10 94 2406-04-103-1-06-Others-140-Minor works(Campa) Kokati F.S.NO 45(156) 50.00 Ha 2,560,000.00
11 95 2406-04-103-1-06-Others-140-Minor works(Campa) Manturga F.S.NO 74 50.00 Ha 2,560,000.00
12 96 2406-04-103-1-06-Others-140-Minor works(Campa) Kanjale F.S.NO 27 50.00 Ha 2,560,000.00
13 97 2406-04-103-1-06-Others-140-Minor works(Campa) Hebbal F.S.NO 48,134 50.00 Ha 2,560,000.00
14 98 2406-04-103-1-06-Others-140-Minor works(Campa) Karalaga F.S.NO 24,209 50.00 Ha 2,560,000.00
19 104 4406-01-101-0-02-Flexi Funds others Capital Exp(KFDF-OP) Sonarwadi F.S.NO 38 50.00 Ha 2,560,000.00
20 105 4406-01-101-0-02-Flexi Funds others Capital Exp(KFDF-OP) Morab F.S.NO 22 50.00 Ha 2,560,000.00
21 106 4406-01-101-0-02-Flexi Funds others Capital Exp(KFDF-OP) Jamboti F.S.NO 97 50.00 Ha 2,560,000.00
22 75 4406-01-101-0-02-Flexi Funds others Capital Exp(KIDF-OP) Bhadarawadi Cross to Kavalewadi 5.00 Km 590,000.00
23 38 2406-01-101-2-30-NBM-139 MW Dharoli Recorded Forest S.Y.No 41,43 10.00 Ha 720,000.00
26 80 2406-01-101-2-30-NBM-139 MW Amboli Recorded Forest S.Y.No 56 40.00 Ha 2,880,000.00
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR ADAVANCE PITTING WORK DURING 2026-27
Estimate No: 85 Pits/Trenches: 13900 0.75*0.75*0.75
Head of Account: 2406-04-103-1-06-Others-140-Minor works(Campa) Seedlings: 15300 10*16 seedlings
Circle: Belagavi Species: Matti, Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Chapoli F.S.NO 61-P-I
Extent (Km/Ha): 50.00 Ha Total Amount: 2560000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 3,600.00 Rmtrs. 1.54 Rmtrs. 5,554.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 13,900.00 PITS 580.08 1000.00 PITS 8,063.00
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 5,864.06 Cum. 263.78 Cum. 1,546,823.00
4 Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 15,300.00 no 61.33 one 938,349.00
6 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 50.00 Ha 116.55 one 5,828.00
7 LS Miscellaneous. Unforeseen & rounding off. 50.00 Ha 0.00 383.00
Total Amount 2,650,000.00
Certificates :-
(1) Certified that the rate adopted in this estimate are as per the Common SSR for the Year 2026-27
(2) Certified that the above estimate of work in not included in any previous estimate sanctioned.
(3) Certified that the above estimate of works has been included in the Sanctioned APO of the Year 2026-27
The above estimate is technically scrutinised & all the operations provided in the above estimate are Counter signed for.
Assistant Conservator of Forests SHREEKANT PATIL
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 2560000.00 (Twenty Five Lakh Sixty Thousand Rupees Only)
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growtŁi to a widtŁi of 2 m. in tle areas with sparse under groMh. 72 Rm« . 1,542.76 Gm 111.08
2 29 (b) Aligning in the planting area and marking for pjt (without staking) (Aligning of pit in Stagerred design} 278 Pits 580.08 1000 161.26
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 117.28 Cum. 263.78 1 30,936.45
s Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10P• Casuality Replacement 306 Seedl. 61.33 1 18,765.76
6 LS / RQ SMC works 1 ha 2,900.00 1 2,900.00
7 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 116.55 l T16.SS
Miscellaneous. Unforeseen & rounding off. 8.90
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR ADAVANCE PITTING WORK DURING 2026-27
Estimate No: 86 Pits/Trenches: 13900 0.75*0.75*0.75
Head of Account: 2406-04-103-1-06-Others-140-Minor works(Campa) Seedlings: 15300 10*16 seedlings
Circle: Belagavi Species: Matti, Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Chapoli F.S.NO 61-P-II
Extent (Km/Ha): 50.00 Ha Total Amount: 2560000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 3,600.00 Rmtrs. 1.54 Rmtrs. 5,554.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 13,900.00 PITS 580.08 1000.00 PITS 8,063.00
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 5,864.06 Cum. 263.78 Cum. 1,546,823.00
4 Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 15,300.00 no 61.33 one 938,349.00
6 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 50.00 Ha 116.55 one 5,828.00
7 LS Miscellaneous. Unforeseen & rounding off. 50.00 Ha 0.00 383.00
Total Amount 2,650,000.00
Certificates :-
(1) Certified that the rate adopted in this estimate are as per the Common SSR for the Year 2026-27
(2) Certified that the above estimate of work in not included in any previous estimate sanctioned.
(3) Certified that the above estimate of works has been included in the Sanctioned APO of the Year 2026-27
The above estimate is technically scrutinised & all the operations provided in the above estimate are Counter signed for.
Assistant Conservator of Forests SHREEKANT PATIL
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 2560000.00 (Twenty Five Lakh Sixty Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR ADAVANCE PITTING WORK DURING 2026-27
Estimate No: 87 Pits/Trenches: Pits/Trenches: 13900 0.75*0.75*0.75
Head of Account: 2406-04-103-1-06-Others-140-Minor works(Campa) Seedlings: Seedlings: 15300 10*16 seedlings
Circle: Belagavi Species: Matti, Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Jamboti F.S.NO 305
Extent (Km/Ha): 50.00 Ha Total Amount: 2560000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 3,600.00 Rmtrs. 1.54 Rmtrs. 5,554.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 13,900.00 PITS 580.08 1000.00 PITS 8,063.00
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 5,864.06 Cum. 263.78 Cum. 1,546,823.00
4 Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 15,300.00 no 61.33 one 938,349.00
6 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 50.00 Ha 116.55 one 5,828.00
7 LS Miscellaneous. Unforeseen & rounding off. 50.00 Ha 0.00 383.00
Total Amount 2,650,000.00
Total Amount 2,560,000.00
Certificates :-
(1) Certified that the rate adopted in this estimate are as per the Common SSR for the Year 2026-27
(2) Certified that the above estimate of work in not included in any previous estimate sanctioned.
(3) Certified that the above estimate of works has been included in the Sanctioned APO of the Year 2026-27
The above estimate is technically scrutinised & all the operations provided in the above estimate are Counter signed for.
Assistant Conservator of Forests SHREEKANT PATIL
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 2560000.00 (Twenty Five Lakh Sixty Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR ADAVANCE PITTING WORK DURING 2026-27
Estimate No: 88 Pits/Trenches: 13900 0.75*0.75*0.75
Head of Account: 2406-04-103-1-06-Others-140-Minor works(Campa) Seedlings: 15300 10*16 seedlings
Circle: Belagavi Species: Matti, Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Nandgad F.S.NO 405
Extent (Km/Ha): 50.00 Ha Total Amount: 2560000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 3,600.00 Rmtrs. 1.54 Rmtrs. 5,554.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 13,900.00 PITS 580.08 1000.00 PITS 8,063.00
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 5,864.06 Cum. 263.78 Cum. 1,546,823.00
4 Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 15,300.00 no 61.33 one 938,349.00
6 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 50.00 Ha 116.55 one 5,828.00
7 LS Miscellaneous. Unforeseen & rounding off. 50.00 Ha 0.00 383.00
Total Amount 2,650,000.00
Certificates :-
(1) Certified that the rate adopted in this estimate are as per the Common SSR for the Year 2026-27
(2) Certified that the above estimate of work in not included in any previous estimate sanctioned.
(3) Certified that the above estimate of works has been included in the Sanctioned APO of the Year 2026-27
The above estimate is technically scrutinised & all the operations provided in the above estimate are Counter signed for.
Assistant Conservator of Forests SHREEKANT PATIL
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 2560000.00 (Twenty Five Lakh Sixty Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR ADAVANCE PITTING WORK DURING 2026-27
Estimate No: 89 Pits/Trenches: 13900 0.75*0.75*0.75
Head of Account: 2406-04-103-1-06-Others-140-Minor works(Campa) Seedlings: 15300 10*16 seedlings
Circle: Belagavi Species: Matti, Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Kalamani F.S.NO 37
Extent (Km/Ha): 50.00 Ha Total Amount: 2560000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 3,600.00 Rmtrs. 1.54 Rmtrs. 5,554.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 13,900.00 PITS 580.08 1000.00 PITS 8,063.00
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 5,864.06 Cum. 263.78 Cum. 1,546,823.00
4 Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 15,300.00 no 61.33 one 938,349.00
6 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 50.00 Ha 116.55 one 5,828.00
7 LS Miscellaneous. Unforeseen & rounding off. 50.00 Ha 0.00 383.00
Total Amount 2,650,000.00
Certificates :-
(1) Certified that the rate adopted in this estimate are as per the Common SSR for the Year 2026-27
(2) Certified that the above estimate of work in not included in any previous estimate sanctioned.
(3) Certified that the above estimate of works has been included in the Sanctioned APO of the Year 2026-27
The above estimate is technically scrutinised & all the operations provided in the above estimate are Counter signed for.
Assistant Conservator of Forests SHREEKANT PATIL
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 2560000.00 (Twenty Five Lakh Sixty Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR ADAVANCE PITTING WORK DURING 2026-27
Estimate No: 90 Pits/Trenches: 13900 0.75*0.75*0.75
Head of Account: 2406-04-103-1-06-Others-140-Minor works(Campa) Seedlings: 15300 10*16 seedlings
Circle: Belagavi Species: Matti, Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Kalamani F.S.NO 101
Extent (Km/Ha): 50.00 Ha Total Amount: 2560000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 3,600.00 Rmtrs. 1.54 Rmtrs. 5,554.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 13,900.00 PITS 580.08 1000.00 PITS 8,063.00
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 5,864.06 Cum. 263.78 Cum. 1,546,823.00
4 Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 15,300.00 no 61.33 one 938,349.00
6 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 50.00 Ha 116.55 one 5,828.00
7 LS Miscellaneous. Unforeseen & rounding off. 50.00 Ha 0.00 383.00
Total Amount 2,650,000.00
Certificates :-
(1) Certified that the rate adopted in this estimate are as per the Common SSR for the Year 2026-27
(2) Certified that the above estimate of work in not included in any previous estimate sanctioned.
(3) Certified that the above estimate of works has been included in the Sanctioned APO of the Year 2026-27
The above estimate is technically scrutinised & all the operations provided in the above estimate are Counter signed for.
Assistant Conservator of Forests SHREEKANT PATIL
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 2560000.00 (Twenty Five Lakh Sixty Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR ADAVANCE PITTING WORK DURING 2026-27
Estimate No: 91 Pits/Trenches: 13900 0.75*0.75*0.75
Head of Account: 2406-04-103-1-06-Others-140-Minor works(Campa) Seedlings: 15300 10*16 seedlings
Circle: Belagavi Species: Matti, Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Morab F.S.NO 22
Extent (Km/Ha): 50.00 Ha Total Amount: 2560000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 3,600.00 Rmtrs. 1.54 Rmtrs. 5,554.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 13,900.00 PITS 580.08 1000.00 PITS 8,063.00
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 5,864.06 Cum. 263.78 Cum. 1,546,823.00
4 Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 15,300.00 no 61.33 one 938,349.00
6 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 50.00 Ha 116.55 one 5,828.00
7 LS Miscellaneous. Unforeseen & rounding off. 50.00 Ha 0.00 383.00
Total Amount 2,650,000.00
Certificates :-
(1) Certified that the rate adopted in this estimate are as per the Common SSR for the Year 2026-27
(2) Certified that the above estimate of work in not included in any previous estimate sanctioned.
(3) Certified that the above estimate of works has been included in the Sanctioned APO of the Year 2026-27
The above estimate is technically scrutinised & all the operations provided in the above estimate are Counter signed for.
Assistant Conservator of Forests SHREEKANT PATIL
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 2560000.00 (Twenty Five Lakh Sixty Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR ADAVANCE PITTING WORK DURING 2026-27
Estimate No: 92 Pits/Trenches: 13900 0.75*0.75*0.75
Head of Account: 2406-04-103-1-06-Others-140-Minor works(Campa) Seedlings: 15300 10*16 seedlings
Circle: Belagavi Species: Matti, Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Kinaye F.S.NO 166
Extent (Km/Ha): 50.00 Ha Total Amount: 2560000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 3,600.00 Rmtrs. 1.54 Rmtrs. 5,554.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 13,900.00 PITS 580.08 1000.00 PITS 8,063.00
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 5,864.06 Cum. 263.78 Cum. 1,546,823.00
4 Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 15,300.00 no 61.33 one 938,349.00
6 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 50.00 Ha 116.55 one 5,828.00
7 LS Miscellaneous. Unforeseen & rounding off. 50.00 Ha 0.00 383.00
Total Amount 2,650,000.00
Certificates :-
(1) Certified that the rate adopted in this estimate are as per the Common SSR for the Year 2026-27
(2) Certified that the above estimate of work in not included in any previous estimate sanctioned.
(3) Certified that the above estimate of works has been included in the Sanctioned APO of the Year 2026-27
The above estimate is technically scrutinised & all the operations provided in the above estimate are Counter signed for.
Assistant Conservator of Forests SHREEKANT PATIL
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 2560000.00 (Twenty Five Lakh Sixty Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR ADAVANCE PITTING WORK DURING 2026-27
Estimate No: 93 Pits/Trenches: 13900 0.75*0.75*0.75
Head of Account: 2406-04-103-1-06-Others-140-Minor works(Campa) Seedlings: 15300 10*16 seedlings
Circle: Belagavi Species: Matti, Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Jamboti F.S.NO 97
Extent (Km/Ha): 50.00 Ha Total Amount: 2560000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 3,600.00 Rmtrs. 1.54 Rmtrs. 5,554.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 13,900.00 PITS 580.08 1000.00 PITS 8,063.00
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 5,864.06 Cum. 263.78 Cum. 1,546,823.00
4 Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 15,300.00 no 61.33 one 938,349.00
6 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 50.00 Ha 116.55 one 5,828.00
7 LS Miscellaneous. Unforeseen & rounding off. 50.00 Ha 0.00 383.00
Total Amount 2,650,000.00
Certificates :-
(1) Certified that the rate adopted in this estimate are as per the Common SSR for the Year 2026-27
(2) Certified that the above estimate of work in not included in any previous estimate sanctioned.
(3) Certified that the above estimate of works has been included in the Sanctioned APO of the Year 2026-27
The above estimate is technically scrutinised & all the operations provided in the above estimate are Counter signed for.
Assistant Conservator of Forests SHREEKANT PATIL
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 2560000.00 (Twenty Five Lakh Sixty Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR ADAVANCE PITTING WORK DURING 2026-27
Estimate No: 94 Pits/Trenches: 13900 0.75*0.75*0.75
Head of Account: 2406-04-103-1-06-Others-140-Minor works(Campa) Seedlings: 15300 10*16 seedlings
Circle: Belagavi Species: Matti, Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Kokati F.S.NO 45(156)
Extent (Km/Ha): 50.00 Ha Total Amount: 2560000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 3,600.00 Rmtrs. 1.54 Rmtrs. 5,554.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 13,900.00 PITS 580.08 1000.00 PITS 8,063.00
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 5,864.06 Cum. 263.78 Cum. 1,546,823.00
4 Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 15,300.00 no 61.33 one 938,349.00
6 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 50.00 Ha 116.55 one 5,828.00
7 LS Miscellaneous. Unforeseen & rounding off. 50.00 Ha 0.00 383.00
Total Amount 2,650,000.00
Certificates :-
(1) Certified that the rate adopted in this estimate are as per the Common SSR for the Year 2026-27
(2) Certified that the above estimate of work in not included in any previous estimate sanctioned.
(3) Certified that the above estimate of works has been included in the Sanctioned APO of the Year 2026-27
The above estimate is technically scrutinised & all the operations provided in the above estimate are Counter signed for.
Assistant Conservator of Forests SHREEKANT PATIL
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 2560000.00 (Twenty Five Lakh Sixty Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR ADAVANCE PITTING WORK DURING 2026-27
Estimate No: 95 Pits/Trenches: 13900 0.75*0.75*0.75
Head of Account: 2406-04-103-1-06-Others-140-Minor works(Campa) Seedlings: 15300 10*16 seedlings
Circle: Belagavi Species: Matti, Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Manturga F.S.NO 74
Extent (Km/Ha): 50.00 Ha Total Amount: 2560000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 3,600.00 Rmtrs. 1.54 Rmtrs. 5,554.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 13,900.00 PITS 580.08 1000.00 PITS 8,063.00
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 5,864.06 Cum. 263.78 Cum. 1,546,823.00
4 Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 15,300.00 no 61.33 one 938,349.00
6 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 50.00 Ha 116.55 one 5,828.00
7 LS Miscellaneous. Unforeseen & rounding off. 50.00 Ha 0.00 383.00
Total Amount 2,650,000.00
Certificates :-
(1) Certified that the rate adopted in this estimate are as per the Common SSR for the Year 2026-27
(2) Certified that the above estimate of work in not included in any previous estimate sanctioned.
(3) Certified that the above estimate of works has been included in the Sanctioned APO of the Year 2026-27
The above estimate is technically scrutinised & all the operations provided in the above estimate are Counter signed for.
Assistant Conservator of Forests SHREEKANT PATIL
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 2560000.00 (Twenty Five Lakh Sixty Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR ADAVANCE PITTING WORK DURING 2026-27
Estimate No: 96 Pits/Trenches: 13900 0.75*0.75*0.75
Head of Account: 2406-04-103-1-06-Others-140-Minor works(Campa) Seedlings: 15300 10*16 seedlings
Circle: Belagavi Species: Matti, Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Kanjale F.S.NO 27
Extent (Km/Ha): 50.00 Ha Total Amount: 2560000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 3,600.00 Rmtrs. 1.54 Rmtrs. 5,554.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 13,900.00 PITS 580.08 1000.00 PITS 8,063.00
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 5,864.06 Cum. 263.78 Cum. 1,546,823.00
4 Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 15,300.00 no 61.33 one 938,349.00
6 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 50.00 Ha 116.55 one 5,828.00
7 LS Miscellaneous. Unforeseen & rounding off. 50.00 Ha 0.00 383.00
Total Amount 2,650,000.00
Certificates :-
(1) Certified that the rate adopted in this estimate are as per the Common SSR for the Year 2026-27
(2) Certified that the above estimate of work in not included in any previous estimate sanctioned.
(3) Certified that the above estimate of works has been included in the Sanctioned APO of the Year 2026-27
The above estimate is technically scrutinised & all the operations provided in the above estimate are Counter signed for.
Assistant Conservator of Forests SHREEKANT PATIL
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 2560000.00 (Twenty Five Lakh Sixty Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR ADAVANCE PITTING WORK DURING 2026-27
Estimate No: 97 Pits/Trenches: 13900 0.75*0.75*0.75
Head of Account: 2406-04-103-1-06-Others-140-Minor works(Campa) Seedlings: 15300 10*16 seedlings
Circle: Belagavi Species: Matti, Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Hebbal F.S.NO 48,134
Extent (Km/Ha): 50.00 Ha Total Amount: 2560000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 3,600.00 Rmtrs. 1.54 Rmtrs. 5,554.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 13,900.00 PITS 580.08 1000.00 PITS 8,063.00
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 5,864.06 Cum. 263.78 Cum. 1,546,823.00
4 Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 15,300.00 no 61.33 one 938,349.00
6 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 50.00 Ha 116.55 one 5,828.00
7 LS Miscellaneous. Unforeseen & rounding off. 50.00 Ha 0.00 383.00
Total Amount 2,650,000.00
Certificates :-
(1) Certified that the rate adopted in this estimate are as per the Common SSR for the Year 2026-27
(2) Certified that the above estimate of work in not included in any previous estimate sanctioned.
(3) Certified that the above estimate of works has been included in the Sanctioned APO of the Year 2026-27
The above estimate is technically scrutinised & all the operations provided in the above estimate are Counter signed for.
Assistant Conservator of Forests SHREEKANT PATIL
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 2560000.00 (Twenty Five Lakh Sixty Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR ADAVANCE PITTING WORK DURING 2026-27
Estimate No: 98 Pits/Trenches: 13900 0.75*0.75*0.75
Head of Account: 2406-04-103-1-06-Others-140-Minor works(Campa) Seedlings: 15300 10*16 seedlings
Circle: Belagavi Species: Matti, Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Karalaga F.S.NO 24,209
Extent (Km/Ha): 50.00 Ha Total Amount: 2560000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 3,600.00 Rmtrs. 1.54 Rmtrs. 5,554.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 13,900.00 PITS 580.08 1000.00 PITS 8,063.00
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 5,864.06 Cum. 263.78 Cum. 1,546,823.00
4 Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 15,300.00 no 61.33 one 938,349.00
6 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 50.00 Ha 116.55 one 5,828.00
7 LS Miscellaneous. Unforeseen & rounding off. 50.00 Ha 0.00 383.00
Total Amount 2,650,000.00
Certificates :-
(1) Certified that the rate adopted in this estimate are as per the Common SSR for the Year 2026-27
(2) Certified that the above estimate of work in not included in any previous estimate sanctioned.
(3) Certified that the above estimate of works has been included in the Sanctioned APO of the Year 2026-27
The above estimate is technically scrutinised & all the operations provided in the above estimate are Counter signed for.
Assistant Conservator of Forests SHREEKANT PATIL
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 2560000.00 (Twenty Five Lakh Sixty Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR ADAVANCE PITTING WORK DURING 2026-27
Estimate No: 99 Pits/Trenches: 13900 0.75*0.75*0.75
Head of Account: 4406-01-101-0-03-139 (DDF) Seedlings: 15300 10*16 seedlings
Circle: Belagavi Species: Matti, Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Kirawali (K-Chapoli) F.S.NO 27
Extent (Km/Ha): 50.00 Ha Total Amount: 2560000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 3,600.00 Rmtrs. 1.54 Rmtrs. 5,554.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 13,900.00 PITS 580.08 1000.00 PITS 8,063.00
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 5,864.06 Cum. 263.78 Cum. 1,546,823.00
4 Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 15,300.00 no 61.33 one 938,349.00
6 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 50.00 Ha 116.55 one 5,828.00
7 LS Miscellaneous. Unforeseen & rounding off. 50.00 Ha 0.00 383.00
Total Amount 2,650,000.00
Sanctioned for Rs. 2560000.00 (Twenty Five Lakh Sixty Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR ADAVANCE PITTING WORK DURING 2026-27
Estimate No: 100 Pits/Trenches: 13900 0.75*0.75*0.75
Head of Account: 4406-01-101-0-03-139 (DDF) Seedlings: 15300 10*16 seedlings
Circle: Belagavi Species: Matti, Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Bailur F.S.NO 381
Extent (Km/Ha): 50.00 Ha Total Amount: 2560000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 3,600.00 Rmtrs. 1.54 Rmtrs. 5,554.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 13,900.00 PITS 580.08 1000.00 PITS 8,063.00
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 5,864.06 Cum. 263.78 Cum. 1,546,823.00
4 Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 15,300.00 no 61.33 one 938,349.00
6 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 50.00 Ha 116.55 one 5,828.00
7 LS Miscellaneous. Unforeseen & rounding off. 50.00 Ha 0.00 383.00
Total Amount 2,650,000.00
Sanctioned for Rs. 2560000.00 (Twenty Five Lakh Sixty Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR ADAVANCE PITTING WORK DURING 2026-27
Estimate No: 101 Pits/Trenches: 13900 0.75*0.75*0.75
Head of Account: 4406-01-101-0-03-139 (DDF) Seedlings: 15300 10*16 seedlings
Circle: Belagavi Species: Matti, Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Chapoli F.S.NO 61
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 3,600.00 Rmtrs. 1.54 Rmtrs. 5,554.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 13,900.00 PITS 580.08 1000.00 PITS 8,063.00
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 5,864.06 Cum. 263.78 Cum. 1,546,823.00
4 Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 15,300.00 no 61.33 one 938,349.00
6 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 50.00 Ha 116.55 one 5,828.00
7 LS Miscellaneous. Unforeseen & rounding off. 50.00 Ha 0.00 383.00
Total Amount 2,650,000.00
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 2560000.00 (Twenty Five Lakh Sixty Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR ADAVANCE PITTING WORK DURING 2026-27
Estimate No: 102 Pits/Trenches: 13900 0.75*0.75*0.75
Head of Account: 4406-01-101-0-03-139 (DDF) Seedlings: 15300 10*16 seedlings
Circle: Belagavi Species: Matti, Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Kalagiri F.S.NO 381
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 3,600.00 Rmtrs. 1.54 Rmtrs. 5,554.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 13,900.00 PITS 580.08 1000.00 PITS 8,063.00
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 5,864.06 Cum. 263.78 Cum. 1,546,823.00
4 Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 15,300.00 no 61.33 one 938,349.00
6 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 50.00 Ha 116.55 one 5,828.00
7 LS Miscellaneous. Unforeseen & rounding off. 50.00 Ha 0.00 383.00
Total Amount 2,650,000.00
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 2560000.00 (Twenty Five Lakh Sixty Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR ADAVANCE PITTING WORK DURING 2026-27
Estimate No: 104 Pits/Trenches: 13900 0.75*0.75*0.75
Head of Account: 4406-01-101-0-02-Flexi Funds others Capital Exp(KFDF-OP) Seedlings: 15300 10*16 seedlings
Circle: Belagavi Species: Matti, Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Sonarwadi F.S.NO 38
Extent (Km/Ha): 50.00 Ha Total Amount: 2560000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 3,600.00 Rmtrs. 1.54 Rmtrs. 5,554.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 13,900.00 PITS 580.08 1000.00 PITS 8,063.00
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 5,864.06 Cum. 263.78 Cum. 1,546,823.00
4 Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 15,300.00 no 61.33 one 938,349.00
6 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 50.00 Ha 116.55 one 5,828.00
7 LS Miscellaneous. Unforeseen & rounding off. 50.00 Ha 0.00 383.00
Total Amount 2,650,000.00
Sanctioned for Rs. 2560000.00 (Twenty Five Lakh Sixty Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR ADAVANCE PITTING WORK DURING 2026-27
Estimate No: 105 Pits/Trenches: 13900 0.75*0.75*0.75
Head of Account: 4406-01-101-0-02-Flexi Funds others Capital Exp(KFDF-OP) Seedlings: 15300 10*16 seedlings
Circle: Belagavi Species: Matti, Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Morab F.S.NO 22
Extent (Km/Ha): 50.00 Ha Total Amount: 2560000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 3,600.00 Rmtrs. 1.54 Rmtrs. 5,554.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 13,900.00 PITS 580.08 1000.00 PITS 8,063.00
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 5,864.06 Cum. 263.78 Cum. 1,546,823.00
4 Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 15,300.00 no 61.33 one 938,349.00
6 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 50.00 Ha 116.55 one 5,828.00
7 LS Miscellaneous. Unforeseen & rounding off. 50.00 Ha 0.00 383.00
Total Amount 2,650,000.00
Sanctioned for Rs. 2560000.00 (Twenty Five Lakh Sixty Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR ADAVANCE PITTING WORK DURING 2026-27
Estimate No: 106 Pits/Trenches: 13900 0.75*0.75*0.75
Head of Account: 4406-01-101-0-02-Flexi Funds others Capital Exp(KFDF-OP) Seedlings: 15300 10*16 seedlings
Circle: Belagavi Species: Matti, Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Jamboti F.S.NO 97
Extent (Km/Ha): 50.00 Ha Total Amount: 2560000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 3,600.00 Rmtrs. 1.54 Rmtrs. 5,554.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 13,900.00 PITS 580.08 1000.00 PITS 8,063.00
3 29 (c) (i) Excavation of pits of size 0.75 Mtr.x0.75 Mm.x0.75 Mtr. with verticąlly cut edges to make an uniform cube and heaplng tfie excavated soil (1/3rd top Soil on the upper side & 2/3rd on the lower side) In Ordinary Soil (or 278 pits) 5,864.06 Cum. 263.78 Cum. 1,546,823.00
4 Sub Fstimate Cost of t0"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 15,300.00 no 61.33 one 938,349.00
6 LS / RQ Procurement of seeds for sowing on tfie mounds of the CPT during next rains. 50.00 Ha 116.55 one 5,828.00
7 LS Miscellaneous. Unforeseen & rounding off. 50.00 Ha 0.00 383.00
Total Amount 2,650,000.00
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 2560000.00 (Twenty Five Lakh Sixty Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
ESTIMATE FOR MAINTENANCE OF ONE YEAR OLD PLANTATION (RSP/GUA) DURING 2026-27
Estimate No: 75 Pits/Trenches: 1500 Pits 1.00m X 1.00m X 1.00m
Head of Account: 4406-01-101-0-02-Flexi Funds others Capital Exp(KIDF-OP) Seedlings: 1500 14 X 20
Circle: Belagavi Species: Ala, Arali, Sampige, Nerale, Kadubadam, Raintree Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Bhadarawadi Cross to Kavalewadi
Extent (Km/Ha): 5.00 Km Total Amount: 590000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 16(f) Watering to the polythene-bagged seedlings twice a day. 1.4.2026-15.6.2026-76 Days 76 150.00 day 127.24 1000.00 day 1,451.00 9.67024
2 16(g) Weeding in polythene bags. 2 150.00 each time 256.95 1000.00 each time 77.00 0.5139
3 16(h) Shifting and grading the polythene-bhagged seedlings. 2 150.00 each time 1,178.79 1000.00 each time 354.00 2.35758
4 40(a) Re-opening of pits of size 1mx1mx1mx for replacement of casualities-30 pits. 63.28 Cum 88.13 Cum 5,577.00
5 41(b) Refilling of pits, cutting of edge of the pit on the lower side and refilling 75% of the pit with the excavated soil duty breaking the clods and formation of saucer shaped mound on the lower side of the pit size 1mx1m x1m for replacement of casualities. 150.00 Pits 14.90 Pits 2,235.00
6 23(f) Loading of polythene / HDPE bagged seedlings into vehicle at the nursery site and unloading at the site nearest to the planting site. Seedlings raised in 14" x 20" size bags 150.00 PBs 13,568.87 1000.00 PBs 2,035.00 13.56887
7 24(f) iii) Transportation: Transportation: Transportation of polythene/HDPE bagged seedlings in vehicle from nursery site to planting site. Distance from 21 to 30 Km. 150.00 PBs 12,472.34 1000.00 PBs 1,871.00 12.47234
8 26(d) Watering polythene / HDPE bagged seedlings at planting site by dipping in water (including carrying of water) only in dry conditions of weather.-14" x 20" and above size bagged seedlings. 150.00 each 1,320.14 1000.00 each 198.00 1.32014
9 27(1) Conveyance of tall seedlings raised in HDPE Bags of size 14 x20 from the dumping point site to planting site near each pit on head load, fixing the supporting stake firmly in the pit, planting the tall tall seedlings in the pit tying the seedling to the supporting stake at 3 points (excluding cost of supporting stake) (14 x20 Planting) 150.00 Plants 73.24 Plants 10,986.00
10 RQ12 Procurment, Transportation & fixing of 10 feet length & 10- 15cm girth marihala Bamboo/wooden/Eucalyptus stakes, Each of the Bamboo/wooden sticks is to be dipped in hot liquid coal tar to a minimum length of 5 feet 150.00 each 51.87 each 7,781.00
11 41(d) Cutting and collection of P. J. branches loading the same into the lorry and unloading at the planting site (8-10 branches per plant). 150.00 for each Tall seedling 44.07 for each Tall seedling 6,611.00
12 41(e) Conveyance of P. J. branches to individual pit, tying P. J. branches around the supporting stake properly covering the tall plant with P. J. thorny branches to a height of more than 2m. and tying the P. J. branches with G. I. wire at 3 places (10 P. J. branches to be used for tying the tall seedling). 150.00 Each tall seedling 51.51 Each tall seedling 7,727.00
13 32 (j) First Weeding around the plants (pit) to radius of 60 cm 1,500.00 Plants 1,833.43 1000.00 Plants 2,750.00 1.83343
14 41(h) Scraping of grass and other growth around the tall plant to a radius of 60 cm (Pits) 1,500.00 plants 4,547.58 1000.00 plants 6,821.00 4.54758
15 41(i) Hoeing and soil working with pickaxe around the plant to a depth of 15cm. & to a radius of 60 cm so as to loosen the soil around the plants (pits only). 1,500.00 plants 7,334.34 1000.00 plants 11,002.00 7.33434
16 41(j) (ii) Watering to the seedlings along roadside and in the city limits at 50 liters/plants 3 times. April & May) (Nos are Flex) 3 1,500.00 plants 56.23 plants 253,035.00 168.69 253035
17 Wage Protection of plantation as per the standard norms (One Watcher for 3 km as a unit).1.4.2026 to 31.3.2027-365 days 365 1.00 days 620.66 days 226,541.00 226540.9
18 Wage Protection of the plantation as per the standard norms.(for 3 KM. as unit during the year) and pro-rate for different extent for the actual period) 69 1.00 Nos 620.66 Nos 42,826.00 42825.54
19 LS/RQ Procurement and application of plant protection and growth promotion compounds/material and various other expenses including rounding off. 122.00 122.00 122.00 122.00
Total Amount 590,000.00
Certificates :-
(1) Certified that the rate adopted in this estimate are as per the Common SSR for the Year 2026-27
(2) Certified that the above estimate of work in not included in any previous estimate sanctioned.
(3) Certified that the above estimate of works has been included in the Sanctioned APO of the Year 2026-27
The above estimate is technically scrutinised & all the operations provided in the above estimate are Counter signed for.
Assistant Conservator of Forests SHREEKANT PATIL
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 590000.00 (Five Lakh Ninety Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
Estimate for Raising of Mansoon Bamboo Plantation (For Boundary/Block Plantation on Famers field) During 2026-27
Estimate No: 38 No of pits/Trenches: 4000 Size: 0.60m X 0.60m X 0.60m
Head of Account: 2406-01-101-2-30-NBM-139 MW No of seedlings: 4400 Size: 8 X 12
Circle: Belagavi Species: Bamboo
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Dharoli Recorded Forest S.Y.No 41,43
Extent (Km/Ha): 10.00 Ha Total Amount: 720000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity Unit Rate Rate per Amount
1 100(b) Survey and Demarcation of Planting Areas: Survey and demarcation of plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas width:- Sparse under growth. 0.72 Km 1,542.78 Km 1,111.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 4,000.00 per 580.08 1000 per 2,320.00 0.58008
3 29(c)(i) Excavation of pits with vertically cut edges to make an uniform cube and heaping the excavated soil (1/3rd top soil on the upper side and 2/3rd on the lower side) Ordinary soil of size 0.60x0.60x0.60 = 0.216 cum per pit (400 Pits/Ha) 864.00 cum. 263.78 cum. 227,906.00
4 subel Procurement or Cost of Raising 8 x12 PB seedlings Including 10% casuality replacement 4,400.00 26.63 117,172.00
5 29(d) Refilling of pits, cutting of edge of the pit on the lower side and refilling 75% or 100% of the pit as the case may be with the excavated soil, duly breaking the clods and arranging the remaining soil on the lower slope. 648.00 cum. 32.89 cum. 21,313.00
6 23(d) Loading of polythene bagged seedlings into the vehicle at the nursery site and unloading at the site nearest to the planting site including 10% casuality replacement. Seedlings raised in 8"x12" size bags. 4,000.00 Seedl. 2,933.86 1000 Seedl. 11,735.00 2.93386
7 24(d)(iii) Transportation of polythene bagged seedlings in hired truck from the nursery site to planting site. Seedlings raised in 8"x12" size bags. Distance from 21 to 30 km. 4,000.00 Seedl. 4,157.47 1000 Seedl. 16,630.00 4.15747
8 25(d) Conveyance of polythene bagged seedlings on head load from the dumping site to planting location near each pit. 8"x12" size bagged seedlings. (Distance upto 3 km). 4,000.00 Seedl. 5,867.72 1000 Seedl. 23,471.00 5.86772
9 26(c) Watering polythene bagged seedlings at planting site by dipping in water, including carrying of water. 8"x12" size bagged seedlings 4,000.00 Seedl. 1,246.91 1000 Seedl. 4,988.00 1.24691
10 27(d) Planting of P.B. Seedlings after tearing with blade and removing the polythene bags in pits including scooping the soil to required depth, pressing the soil gently around the seedlings after planting. 8"x12" size bagged seedlings. 4,000.00 Seedl. 5,502.78 1000 Seedl. 22,011.00 5.50278
11 RQ Purchase of DAP (50 gm per plant) 200.00 kg 35.98 kg 7,196.00
12 38 (c) Application of chemical fertilizer around the plants about 15 cm. away in a furrow duly covering with soil (excluding the cost of fertilizer) in two equal split doses. 2 4,000.00 plants 586.52 1000 plants 4,692.00 1.17304
13 28 (e) First weeding around the plants (pits) to a readius 60 cm 4,000.00 plants 1,833.43 1000 plants 7,334.00 1.83343
14 29(1)(iii) Scraping of grass and other weed growth around the plant (Pits) (Scraping item is allowed only in grass-infested areas) 60 cm. radius around the plant. 4,000.00 plants 4,547.58 1000 plants 18,190.00 4.54758
15 29(m) Hoeing and soil working with pickaxe around the plant to a depth of 15cm. and to a radius of 50 cm. so as to loosen the soil around the plants (pits only). 4,000.00 plants 7,334.34 1000 plants 29,337.00 7.33434
16 82 FIRE PROTECTION WORK IN PLANTATION: NEW FIRE LINES: Cutting of all existing weed growth to a width of 3 m. heaping, burning and re-burning in younger plantations. 3.30 km/ha. 3,080.34 km/ha. 10,165.00
17 14(f) Watering the polythene-bagged seedlings twice a day. 1.4.2026-31.5.2026-61 days 61 4,400.00 day 55.24 1000 day 14,826.00 3.36964
18 14(g) Weeding in the polythene-bagged seedlings. 2 4,400.00 each time 168.82 1000 each time 1,486.00 0.33764
19 14(h) Shifting and grading the polythene-bagged seedlings. 4,400.00 each time 471.65 1000 each time 2,075.00 0.47165
20 RQ15 Purchase of Barbed wire (INncluding GST-18% 12 X14 Guage good quality of G.I. Barbed wire zinc coating thickness of minimum 90 GSM 360.00 KG 155.76 KG 56,074.00
21 86(a) Preparation of fence posts, duly fashioned conical at the top, debarked and tar coated complete; 2 m length and 38 cm Girth (Wooden post material should be obtained from dead timber material already available in forest areas or by singling out of forked poles of appropriate size and not by cutting live tree). 440.00 post 43.24 post 19,026.00
22 86(b) Transport of fence posts up to 10 km distance including loading and unloading charges using hired vehicle. 440.00 post 21.78 post 9,583.00
23 86(e) Fixing the fence posts after digging pits of 30 cm x 30 cm x 40 cm depth and consolidation, ensuring firm fixture. 440.00 post 73.24 post 32,226.00
24 RQ24 Cost of "U" Nails 10.00 KG 119.00 KG 1,190.00
25 86 Unrolling and fixing barbed wire with 'U' nails in four rows, ensuring proper fixture. (excludes cost of wire and 'U' nails). 360.00 KG 58.96 KG 21,226.00
26 RQ11 Docmentation in the form of Bookslets, Succesess stories, Photographs, Adit Reports, Misc rounding off 36,717.00 36,717.00 36717 36,717.00
Total Amount 720,000.00
Certificates :-
(1) Certified that the rate adopted in this estimate are as per the Common SSR for the Year 2026-27
(2) Certified that the above estimate of work in not included in any previous estimate sanctioned.
(3) Certified that the above estimate of works has been included in the Sanctioned APO of the Year 2026-27
The above estimate is technically scrutinised & all the operations provided in the above estimate are Counter signed for.
Assistant Conservator of Forests SHREEKANT PATIL
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 720000.00 (Seven Lakh Twenty Thousand Rupees Only)
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
Estimate for Raising of Mansoon Plantation during 2026-27
Estimate No: 36 Pits/Trenches: 8000-Pits
Head of Account: 4406-01-101-0-03-139-(DDF) Seedlings: 8800/8 X 12
Circle: Belagavi Species: Matti. Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Manikawadi F.S.NO 19,20,21,22,23,36
Extent (Km/Ha): 20.00 Ha Total Amount: 1612000
Sl No. SSR No. Particulars of Works Times/ days Quantity/Unit Rate Rate per Amount
1 100(a) Survey and Demarcation of Planting Areas Survey and demarcation of plantation boundary lines... 1440.00 Km 3,904.09 1000.00 Km 5,622.00 3.90409
2 29(b) Aligning in the planting area along to the contours and marking for pit 8000.00 pits 580.08 1000.00 pits 4,641.00 0.58008
3 29(c)(1) Excavation of pits of size 0.60mtr x0.60xmtrx0.60 mtr... 1728.00 cum. 307.85 cum. 531,965.00
4 29(d) Refilling of pits, cutting of edge of the pit on the lower side and refilling 75% or 100%... 1296.00 Cum. 32.89 Cum. 42,625.00
5 23(e) Loading of polythene bagged seedlings into the vehicle at the nursery site... 8800.00 Seedl. 2,933.86 1000.00 Seedl. 25,818.00 2.93386
6 24(e)(iii) Transportation of polythene bagged seedlings in hired truck... 2 8800.00 Seedl. 4,157.47 1000.00 Seedl. 36,586.00 4.15747 4.15747 36585.736
7 (e) Conveyance of polythene bagged seedlings on head load from the dumping site... 8800.00 Seedl. 5,867.72 1000.00 Seedl. 46,942.00 5.86772 5334.31818181818
8 (d) Watering polythene bagged seedlings at planting site by dipping in water... 8000.00 Seedl. 1,246.91 1000.00 Seedl. 10,973.00 1.24691
9 27(d) Planting of P.B. Seedlings after tearing with blade and removing the polythene bags... 8800.00 Seedl. 5,502.78 1000.00 Seedl. 48,424.00 5.50278
10 RQ Purchase of NPK/DAP (25+25 50 gms per plant) 2 times 400.00 kg 35.98 kg 14,392.00
11 (e) Application of chemical fertilizer around the plants about 15 cm. away... 2 8000.00 plants 586.52 1000.00 plants 9,384.00 1.17304 9384.32 18768.64
12 29 (e) (i) First weeding around the plants (pits) to a radius of 60 cm. 8000.00 Plants 1,833.43 1000.00 Plants 14,667.00 1.83343
13 29 (i) (iii) Scraping of grass and other weed growth around the plants to a radius of 60 cm 8000.00 Plants 4,547.58 1000.00 Plants 36,381.00 4.54758
14 29 (m) Hoeing & soil working with pickaxe around the plant to a depth of 15cm... 8000.00 Plants 7,334.34 1000.00 Plants 58,675.00 7.33434
15 wage Protection of plantation as per the standard norms from 01-07-2026 to 31-03-2027 274 20.00 days 620.66 25.00 days 136,049.00
16 82 Fire Protection work in plantations: New Fire Lines... 6.60 km/ha. 3,080.34 km/ha 20,330.00
17 LS/RQ Providing & fixing plantation board 20.00 no 162.44 no 3,249.00
18 SUBES Cost of seedlings transplanted into 8"x12" (4x6) 8800.00 Nos 4.20 Nos. 36,960.00
19 RQ17 Purchase of HDPE Woven sack bags including 18% GST 8800.00 Nos 5.58 Nos 49,104.00
20 14(a) Procurement of 0.9225 cum. Farm Yard Manure/Compost... 8800.00 seedlings 3,565.99 1000.00 seedlings 31,381.00 3.56599
21 14(b) Mixing the ingredients, filling the polythene bags... 8800.00 seedlings 2,355.21 1000.00 seedlings 20,726.00 2.35521
22 14(e) Transplanting of 4" x 6" or 5" x 8" size bagged seedlings... 8800.00 383.25 1000.00 3,373.00 0.38325
23 14(f) Watering the polythene-bagged seedlings twice a day. 1.12.2025-31.3.2026-121 days 121 8800.00 day 53.75 1000.00 day 57,233.00 6.50375
24 14(g) Weeding in the polythene-bagged seedlings. 2 8800.00 each time 164.26 1000.00 each time 2,891.00 0.32852
25 14(h) Shifting and grading the polythene-bagged seedlings. 8800.00 each time 459.77 1000.00 each time 4,046.00 0.45977
26 LS2 Procurement of plant protection and growth promotion materials... 8800.00 1,929.48 1000.00 16,979.00 1.92948
27 14(f) Watering the polythene-bagged seedlings twice a day. 1.4.2026-31.5.2026-61 days 61 8800.00 day 55.24 10000.00 day 2,965.00 3.36964
28 14(g) Weeding in the polythene-bagged seedlings. 2 8800.00 each time 168.82 1000.00 each time 2,971.00 0.33764
29 14(h) Shifting and grading the polythene-bagged seedlings. 8800.00 each time 471.65 1000.00 each time 4,151.00 0.47165
30 RQ17 Cost of seedlings transplanted into 8 x12 (4x6) 800.00 Nos 4.20 Nos 3,360.00
31 RQ17 Cost of HDPE Bags including 18% GST 800.00 Per 5.58 Per 4,464.00
32 14(a) Procurement of 0.9225 cum. Farm Yard Manure/Compost... 800.00 seedlings 3,565.99 1000.00 seedlings 2,853.00 3.56599
33 14(b) Mixing the ingredients, filling the polythene bags... 800.00 seedlings 2,355.21 1000.00 seedlings 1,884.00 2.35521
34 14(e) Transplanting of 4" x 6" or 5" x 8" size bagged seedlings... 800.00 per 383.25 1000.00 per 307.00 0.38325
35 14(f) Watering the polythene-bagged seedlings twice a day. 1.11.2026-31.3.2027-151 days 151 800.00 day 53.75 1000.00 day 6,493.00 8.11625
36 14(g) Weeding in the polythene-bagged seedlings. 4 800.00 each time 164.26 1000.00 each time 526.00 0.65704
37 14(h) Shifting and grading the polythene-bagged seedlings. 2 800.00 each time 459.77 1000.00 each time 736.00 0.91954
38 LS2 Procurement of plant protection and growth promotion materials... 800.00 1,929.48 1000.00 1,544.00 1.92948
39 RQ15 Purchase of Barbed wire (including GST 18% 12 X14 Guage... 720.00 KG 155.76 KG 112,147.00
40 86(a) Preparation of fence posts, duly fashioned conical at the top... 880.00 post 43.24 post 38,051.00
41 86(b) Transport of fence posts up to 10 km distance including loading... 880.00 post 21.78 post 19,166.00
42 86(e) Fixing the fence posts after digging pits of 30 cm x 30 cm... 880.00 post 73.24 post 64,451.00
44 86 Unrolling and fixing barbed wire with "U" nails... 720.00 58.96 42,451.00
45 LS Miscellaneous & rounding off smc Works 31684.00 33,741.00 33741.00 31,684.00
Total Amount 1,612,000.00
Certificates :-
(1) Certified that the works are included in the sanctioned Annual Programme of Operations for 2026-27.
(2) Certified that the rates adopted are as per the sanctioned Schedule of Rates for 2026-27.
(3) Certified that these works are not included in any previously sanctioned estimate.
Assistant Conservator of Forests SHREEKANT PATIL
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 1,612,000.00
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
Estimate for Raising of Mansoon Plantation during 2026-27
Estimate No: 35 Pits/Trenches: 10000-Pits
Head of Account: 4406-01-101-0-03-139-(DDF) Seedlings: 11000/8 X 12
Circle: Belagavi Species: Matti. Kindal, Honne, Tare, Nandi, Bamboo Etc
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Angadi F.S.NO 15
Extent (Km/Ha): 25.00 Ha Total Amount: 2015000
Sl No. SSR No. Particulars of Works Times/ days Quantity/Unit Rate Rate per Amount
1 100(a) Survey and Demarcation of Planting Areas Survey and demarcation of plantation boundary lines... 1800.00 Km 3,904.09 1000.00 Km 7,027.00
2 29(b) Aligning in the planting area along to the contours and marking for pit 10000.00 pits 580.08 1000.00 pits 5,801.00
3 29(c)(1) Excavation of pits of size 0.60mtr x0.60xmtrx0.60 mtr... 2160.00 cum. 307.85 cum. 664,956.00
4 29(d) Refilling of pits, cutting of edge of the pit on the lower side and refilling 75% or 100%... 1620.00 Cum. 32.89 Cum. 53,282.00
5 23(e) Loading of polythene bagged seedlings into the vehicle at the nursery site... 11000.00 Seedl. 2,933.86 1000.00 Seedl. 32,272.00
6 24(e)(iii) Transportation of polythene bagged seedlings in hired truck... 11000.00 Seedl. 4,157.47 1000.00 Seedl. 45,732.00
7 25(e) Conveyance of polythene bagged seedlings on head load from the dumping site... 11000.00 Seedl. 5,867.72 1000.00 Seedl. 64,545.00 5.86772
8 26(d) Watering polythene bagged seedlings at planting site by dipping in water... 11000.00 Seedl. 1,246.91 1000.00 Seedl. 13,716.00
9 27(d) Planting of P.B. Seedlings after tearing with blade and removing the polythene bags... 11000.00 Seedl. 5,502.78 1000.00 Seedl. 60,531.00
10 RQ Purchase of NPK/DAP (25+25 50 gms per plant) 2 times 500.00 kg 35.98 kg 17,990.00
11 38 (e) Application of chemical fertilizer around the plants about 15 cm. away... 2 10000.00 plants 586.52 1000.00 plants 11,730.00 1.17304
12 29 (e) (i) First weeding around the plants (pits) to a radius of 60 cm. 10000.00 Plants 1,833.43 1000.00 Plants 18,334.00
13 29 (i) (iii) Scraping of grass and other weed growth around the plants to a radius of 60 cm 10000.00 Plants 4,547.58 1000.00 Plants 45,476.00
14 29 (m) Hoeing & soil working with pickaxe around the plant to a depth of 15cm... 10000.00 Plants 7,334.34 1000.00 Plants 73,343.00
15 wage Protection of plantation as per the standard norms from 01-07-2026 to 31-03-2027 274 25.00 days 620.66 25.00 days 170,061.00 170060.84
16 82 Fire Protection work in plantations: New Fire Lines... 8.25 km/ha. 3,080.34 km/ha 25,413.00
17 LS/RQ Providing & fixing plantation board 25.00 no 162.44 no 4,061.00
18 SUBES Cost of seedlings transplanted into 8"x12" (4x6) 11000.00 Nos. 4.20 Nos. 46,200.00
19 RQ17 Purchase of HDPE Woven sack bags including 18% GST 11000.00 Nos 5.58 Nos 61,380.00
20 14(a) Procurement of 0.9225 cum. Farm Yard Manure/Compost... 11000.00 seedlings 3,565.99 1000.00 seedlings 39,226.00
21 14(b) Mixing the ingredients, filling the polythene bags... 11000.00 seedlings 2,355.21 1000.00 seedlings 25,907.00
22 14(e) Transplanting of 4" x 6" or 5" x 8" size bagged seedlings... 11000.00 383.25 1000.00 4,216.00
23 14(f) Watering the polythene-bagged seedlings twice a day. 1.12.2025-31.3.2026-121 days 121 11000.00 day 53.75 1000.00 day 71,541.00 6.50375 71541.25
24 14(g) Weeding in the polythene-bagged seedlings. 2 11000.00 each time 164.26 1000.00 each time 3,614.00
25 14(h) Shifting and grading the polythene-bagged seedlings. 11000.00 each time 459.77 1000.00 each time 5,057.00
26 LS2 Procurement of plant protection and growth promotion materials... 11000.00 1,929.48 1000.00 21,224.00
27 14(f) Watering the polythene-bagged seedlings twice a day. 1.4.2026-31.5.2026-61 days 61 11000.00 day 55.24 10000.00 day 3,707.00 3.36964
28 14(g) Weeding in the polythene-bagged seedlings. 2 11000.00 each time 168.82 1000.00 each time 3,714.00
29 14(h) Shifting and grading the polythene-bagged seedlings. 11000.00 each time 471.65 1000.00 each time 5,188.00
30 RQ17 Cost of seedlings transplanted into 8 x12 (4x6) 1000.00 Nos 4.20 Nos 4,200.00
31 RQ17 Cost of HDPE Bags including 18% GST 1000.00 Per 5.58 Per 5,580.00
32 14(a) Procurement of 0.9225 cum. Farm Yard Manure/Compost... 1000.00 seedlings 3,565.99 1000.00 seedlings 3,566.00
33 14(b) Mixing the ingredients, filling the polythene bags... 1000.00 seedlings 2,355.21 1000.00 seedlings 2,355.00
34 14(e) Transplanting of 4" x 6" or 5" x 8" size bagged seedlings... 1000.00 per 383.25 1000.00 per 383.00
35 14(1) Watering the polythene-bagged seedlings twice a day. 1.11.2026-31.3.2027-151 days 151 1000.00 day 53.75 1000.00 day 8,116.00
36 14(g) Weeding in the polythene-bagged seedlings. 4 1000.00 each time 164.26 1000.00 each time 657.00
37 14(h) Shifting and grading the polythene-bagged seedlings. 2 1000.00 each time 459.77 1000.00 each time 920.00
38 LS2 Procurement of plant protection and growth promotion materials... 1000.00 1,929.48 1000.00 1,929.00
39 RQ15 Purchase of Barbed wire (including GST 18% 12 X14 Guage... 900.00 KG 155.76 KG 140,184.00
40 86(a) Preparation of fence posts, duly fashioned conical at the top... 1100.00 post 43.24 post 47,564.00
41 86(b) Transport of fence posts up to 10 km distance including loading... 1100.00 post 21.78 post 23,958.00
42 86(e) Fixing the fence posts after digging pits of 30 cm x 30 cm... 1100.00 post 73.24 post 80,564.00
44 86 Unrolling and fixing barbed wire with "U" nails... 900.00 58.96 53,064.00
45 LS Miscellaneous & rounding off smc Works 33741.00 33,741.00 33741.00 33,741.00
Total Amount 2,015,000.00
Certificates :-
(1) Certified that the works are included in the sanctioned Annual Programme of Operations for 2026-27.
(2) Certified that the rates adopted are as per the sanctioned Schedule of Rates for 2026-27.
(3) Certified that these works are not included in any previously sanctioned estimate.
Assistant Conservator of Forests SHREEKANT PATIL
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 2,015,000.00
KARNATAKA FOREST DEPARTMENT
Belagavi Division, Belagavi
Estimate for Raising of Mansoon Bamboo Plantation (For Boundary/Block Plantation on Famers field) During 2026-27
Estimate No: 80 No of pits/Trenches: 16000 Size: 0.60m X 0.60m X 0.60m
Head of Account: 2406-01-101-2-30-NBM-139 MW No of seedlings: 17600 Size: 8 X 12
Circle: Belagavi Species: Bamboo
Division: Belagavi
Subdivision: Khanapur
Range: Khanapur
Taluk: Khanapur
Constituency: Khanapur
Location: Amboli Recorded Forest S.Y.No 56
Extent (Km/Ha): 40.00 Ha Total Amount: 2880000.00
Sl No. SSR No. Particulars of Works Times/ days Quantity/Unit Rate Rate per Amount
1 100(b) Survey and Demarcation of Planting Areas: Survey and demarcation of plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas width:- Sparse under growth. 2.88 Km 1,542.78 Km 4,443.00
2 29(b) Aligning in the planting area along to the contours and marking for pit (without staking) 16000 per 580.08 1000 per 9,281.00
3 29(c)(i) Excavation of pits with vertically cut edges to make an uniform cube and heaping the excavated soil (1/3rd top soil on the upper side and 2/3rd on the lower side) Ordinary soil of size 0.60x0.60x0.60=0.216 cum per pit (400 Pits/Ha) 3456 cum. 263.78 cum. 911,624.00
4 subel Procurement or Cost of Raising 8 x12 PB seedlings Including 10% casuality replacement 17600 26.63 468,688.00
5 29(d) Refilling of pits, cutting of edge of the pit on the lower side and refilling 75% or 100% of the pit as the case may be with the excavated soil, duly breaking the clods and arranging the remaining soil on the lower slope. 2592 cum. 32.89 cum. 85,251.00
6 23(d) Loading of polythene bagged seedlings into the vehicle at the nursery site and unloading at the site nearest to the planting site including 10% casuality replacement. Seedlings raised in 8"x12" size bags. 17600 Seedl. 2,933.86 1000 Seedl. 51,636.00
7 24(d)(iii) Transportation of polythene bagged seedlings in hired truck from the nursery site to planting site. Seedlings raised in 8"x12" size bags. Distance from 21 to 30 km. 17600 Seedl. 4,157.47 1000 Seedl. 73,171.00
8 25(d) Conveyance of polythene bagged seedlings on head load from the dumping site to planting location near each pit. 8"x12" size bagged seedlings. (Distance upto 3 km). 17600 Seedl. 5,867.72 1000 Seedl. 103,272.00
9 26(c) Watering polythene bagged seedlings at planting site by dipping in water, including carrying of water. 8"x12" size bagged seedlings 17600 Seedl. 1,246.91 1000 Seedl. 21,946.00
10 27(d) Planting of P.B. Seedlings after tearing with blade and removing the polythene bags in pits including scooping the soil to required depth, pressing the soil gently around the seedlings after planting. 8"x12" size bagged seedlings. 17600 Seedl. 5,502.78 1000 Seedl. 96,849.00
11 RQ Purchase of DAP (50 gm per plant) 800 kg 35.98 kg 28,784.00
12 38 (c) Application of chemical fertilizer around the plants about 15 cm. away in a furrow duly covering with soil (excluding the cost of fertilizer) in two equal split doses. 2 16000 plants 586.52 1000 plants 18,769.00
13 28(e) First weeding around the plants (pits) to a readius 60 cm 16000 plants 1,833.43 1000 plants 29,335.00
14 29(i)(iii) Scraping of grass and other weed growth around the plant (Pits) (Scraping item is allowed only in grass-infested areas) 60 cm. radius around the plant. 16000 plants 4,547.58 1000 plants 72,761.00
15 29(m) Hoeing and soil working with pickaxe around the plant to a depth of 15cm. and to a radius of 50 cm. so as to loosen the soil around the plants (pits only). 16000 7,334.34 1000 117,349.00
16 82 FIRE PROTECTION WORK IN PLANTATION: NEW FIRE LINES: Cutting of all existing weed growth to a width of 3 m. heaping, burning and re-burning in younger plantations. 13.2 km/ha. 3,080.34 1000 km/ha. 40,660.00
17 14(f) Watering the polythene-bagged seedlings twice a day. 1.4.2026-31.5.2026-61 days 61 4400 day 55.24 1000 day 14,826.00
18 14(g) Weeding in the polythene-bagged seedlings. 2 17600 each time 168.82 1000 each time 5,942.00
19 14(h) Shifting and grading the polythene-bagged seedlings. 17600 each time 471.65 1000 each time 8,301.00
20 RQ15 Purchase of Barbed wire (INncluding GST-18% 12 X14 Guage good quality of G.I. Barbed wire zinc coating thickness of minimum 90 GSM 1440 KG 155.76 KG 224,294.00
21 86(a) Preparation of fence posts, duly fashioned conical at the top, debarked and tar coated complete; 2 m length and 38 cm Girth (Wooden post material should be obtained from dead timber material already available in forest areas or by singling out of forked poles of appropriate size and not by cutting live tree). 1760 post 43.24 post 76,102.00
22 86(b) Transport of fence posts up to 10 km distance including loading and unloading charges using hired vehicle. 1760 post 21.78 post 38,333.00
23 86(e) Fixing the fence posts after digging pits of 30 cm x 30 cm x 40 cm depth and consolidation, ensuring firm fixture. 1760 post 73.24 post 128,902.00
24 RQ24 Cost of "U" Nails 40 KG 119.00 KG 4,760.00
25 86 Unrolling and fixing barbed wire with 'U' nails in four rows, ensuring proper fixture. (excludes cost of wire and 'U' nails). 1440 KG 58.96 KG 84,902.00
26 RQ11 Docmentation in the form of Bookslets, Succesess stories, Photographs, Adit Reports, Misc rounding off 309 309.00 309 309.00
27 WAGES1 Protection of the plantation as per the standard norms.( for 25 Ha. as unit during the year) and pro-rate for different extent for the actual period) 257 1 days 620.66 days 159,510.00 159509.62
Total Amount 2,880,000.00
Certificates :-
(1) Certified that the rate adopted in this estimate are as per the Common SSR for the Year 2026-27
(2) Certified that the above estimate of work in not included in any previous estimate sanctioned.
(3) Certified that the above estimate of works has been included in the Sanctioned APO of the Year 2026-27
The above estimate is technically scrutinised & all the operations provided in the above estimate are Counter signed for.
Assistant Conservator of Forests SHREEKANT PATIL
Khanapur Sub-Division, Khanapur Range Forest Officer
Sanctioned for Rs. 2880000.00 (Twenty Eight Lakh Eighty Thousand Rupees Only)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Call-2 Standard Bid document notification.docx
Tender Document • 0.11 MB
CALL-2 TENDER NOTIFICATION.docx
Instructions to Tenderers • 0.05 MB
Khanapur_range_tender_estimates final.xlsx
Instructions to Tenderers • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .