Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹12,132
Closing Date
22 Jul 2026, 11:00 am4d left
Office of the Sr. Superintending Engineer, Western
Office of the Sr. Superintending Engineer, Western Electrical Circle , PWD, Purta Bhavan, 1st floor, Burdwan-713103
Annual Comprehensive Maintenance of Window ,Split, Cassete an Tower types of air conditioning system Installed at different sites of Suri Electrical Sub division , section -II under Birbhum Electrical Division ,PWD (For the period of One year
2026_WBPWD_5016805_1
WBPWD/SSEWEC /BRED /NIQ-22 /2026-27
Open Tender
ELECTRICAL WORKS ORG
Item Rate
365 days
Suri
Please refer Tender documents.
5 documents required · 5 mandatory
₹12,132
Office of the Sr. Superintending Engineer, Western
15 Jul 2026
15 Jul 2026
24 Jul 2026
15 Jul 2026
22 Jul 2026
18 Jul 2026
15 Jul 2026 - 17 Jul 2026
17 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for Annual Comprehensive maintenance of 1 to 2.2 Ton capacity window /split type AC machine with necessary accessories& materials (Window type - 2 nos , Split type -118 nos. (120 Nos.AC machines X 12 Month = 1440 nos ) | 1,440 | Units | - | - |
| 1.01 | Annual Comprehensive maintenance of 3/4/5 Ton capacity Tower/cassette type AC machine with necessary accessories & materials . (18 Nos. AC machine X 12 Month = 216 nos ) | 216 | Units | - | - |
| 2TERMS & CONDITIONS :- 1.Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of Comprehensive preventive and corrective maintenance is: To prevent fire hazards arising from RAC installations To ensure safety of occupants and the general public To minimize breakdowns and associated downtime and to ensure performance at desired efficiency. Any incident due to poor maintenance, especially fire hazards, shall be viewed seriously and the contractor shall be held fully responsible. | |||||
| 2.01 | A. Scope of Work:
The scope includes routine, preventive, corrective and Breakdown maintenance of the all Window, Split,
Concealed Split, cassette, ductable, Tower & Package type AC machines, starting from Power supply point
(Timer/Starter) to complete AC unit, within the premises, including but not limited to Supply, repair, and
replacement of all spare parts and components. | - | - | - | - |
| 2.02 | A.1. General Requirements.
1.1 Spare Parts & Components and activities Covered
The contract includes repair/replacement of:
Compressor
Blower motor / fan motor
Condenser & evaporator coils
P.C.B. and Power Supply Card, wherever applicable.
Copper tubing and piping
Capacitors (mandatory P2/S2 type, IEC 60252-1 compliant)
Relays, thermostats, contactors
Remotes
Air filters
Electrical wiring and controls related to A.C. machines
Sheet metal body parts
Nitrile Rubber Insulation of different sizes
Minor Duct repair including G.I. Sheet, Thermal and Acoustic Insulation, mason covering for
outside ducts etc.
Refrigerant gas
Drain Pump
All replaced materials must be:
New and OEM approved quality
Approved by Engineer-in-Charge (EIC) prior to installation | - | - | - | - |
| 2.03 | The agency shall:
1.2 Materials & Consumables
Provide all consumables required for maintenance, including:
Cotton waste, insulation tape, Ferrules and lugs, Lubricants &grease, cleaning agents, Soaps
etc.
Fasteners, nuts& bolts, Drain pipe fittings, Copper pipe insulation, Contact cleaner spray
Belts for AHU / ductable blowers, Refrigerant
All Logbooks and/ or Register as mentioned in this document | - | - | - | - |
| 2.04 | 1.3 Tools & Instruments
Provide and maintain calibrated tools and instruments, including:
Digital multimeter, Digital Clamp-on ammeter
Insulation resistance tester, Thermal Imaging Scanner
Pressure gauges, Infrared thermometer and Digital Psychrometers
Decibel Meter or SPL (Sound Pressure Level) Meter
Air velocity meter / anemometer
Coil cleaning chemical sprayer
Fin comb for condenser/evaporator fins
Vacuum cleaner / blower for cleaning indoor and outdoor units
High-pressure Water jet pump for condenser coil cleaning
Vacuum pump and Refrigerant charging hose set
Nitrogen cylinder with regulator for pressure testing
Brazing set with gas cylinder
Drain line flushing pump
Complete set of screwdrivers, Line Tester, Pliers & Stripper, spanners, Allen keys, adjustable
wrenches, Hackshaw & Hammer, Electric Drill machine.
Insulated ladder
Chain pulley block (for heavy equipment where required)etc | - | - | - | - |
| 2.05 | 1.4 Uniform and Safety Gear (Applicable only when dedicated manpower is included in BOQ)
Ensure all staff use proper uniforms. Provide at least two sets of uniforms and safety gear (helmet,
Umbrella, raincoat, gumboots, etc.) to each staff member. The color end embossing should be as per
direction of EIC.
1.5 Attendance & Monitoring (Applicable only when dedicated manpower is included in BOQ)
Provide biometric attendance system for agency deployed staff if dedicated manpower is
considered in BOQ.
Maintain and monitor attendance records
Maintain Registers and logbooks
1.6 Security
Ensure watch and ward of all installations | - | - | - | - |
| 2.06 | A.2 Preventive Maintenance
The agency shall carry out the following preventive maintenance activities with minimum frequency indicated
against each activity:
A.2.1 Monthly Activities
Checking of Grill Temperature and Room Temperature
Measuring Supply Voltage and current drawn by the machine
Checking of Blower and Swing Motor, wherever applicable.
Checking of Thermostat for proper functioning
Cleaning of filters, coils, blowers
Checking refrigerant levels/ pressures and leakage of gas
Checking of all power and signal terminations
Checking wiring between indoor and outdoor units
Cleaning of cooling and condensing coils
Checking condition of Capacitor
Checking of Sound Level
Performance testing
Checking of any unwanted leakage current at the Indoor and outdoor units
Checking the set point of Air-condition machines and if any abnormal temperature setting is
noticed, that should be reset and specifically be noted in the log book. | - | - | - | - |
| 2.07 | A.2.2Half yearly Activities
Tightening electrical connections
A.2.3Annual Activities
Thorough overhauling
Painting of sheet metal/ support/ wooden frame of RAC/SRC at site
A service report shall be submitted after each above activities, duly signed by the maintenance personnel and
countersigned by the Agency/ Supervisor of the agency. Each and every activity and measurement value must
also be entered in Log book in detail mentioning machine number, location, date & time. | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.49 MB
BOQ_5086624.xls
BOQ • 0.36 MB
new2911.pdf
Tender Documents • 0.51 MB
Download all tender documents and submit your bid