Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.9 LAccepted-AOC | ₹14.9 L | 1 | Accepted-AOC Below |
| 2 | 2₹15.0 L+₹14,193 (0.96%)Rejected-AOC IDUVAI TIRUPUR | TIRUPPUR | TAMIL NADU | 638051 | ₹15.0 L+₹14,193 (0.96%) | 2 | Rejected-AOC Above |
| 3 | 3₹15.1 L+₹23,275 (1.57%)Rejected-AOC | ₹15.1 L+₹23,275 (1.57%) | 3 | Rejected-AOC Above |
| Sl No | Description | Qty | Unit | SIVALINGAM | Ramachandran | Sankaran Babu |
|---|---|---|---|---|---|---|
| 1.01 | Removeing Flat & Pan Tiles or Manglore Tile over Flat Tiles without roof timbers and stocking at site for remeasurement and reuse the rate including cost and conveyance of all materials and labour charges etc., complete complying with standard specifications. | 91 | m2 | 4,095 ₹4,095 | 3,731 ₹3,731 Lowest | 3,731 ₹3,731 Lowest |
| 1.02 | Removeing the Corrugated Iron Sheet Roofing over Pan Tiles without roof timbers and stocking at site for remeasurement and reuse the rate including cost and conveyance of all materials and labour charges etc., complete complying with standard specifications. | 91 | m2 | 4,095 ₹4,095 | 4,004 ₹4,004 Lowest | 4,004 ₹4,004 Lowest |
| 1.03 | Removeing the Door and Windows including frame and carefully stocking at site for remeasurement and reuse the rate including cost and conveyance of all materials and labour charges etc., complete complying with standard specifications. | 18 | m3 | 4,230 ₹4,230 | 4,140 ₹4,140 | 4,050 ₹4,050 Lowest |
| 1.04 | Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9" X 43/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 100CFT | 3 | m2 | 30,735 ₹30,735 | 30,726 ₹30,726 | 30,600 ₹30,600 Lowest |
| 1.05 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 23 | m2 | 9,200 ₹9,200 | 9,085 ₹9,085 | 8,970 ₹8,970 Lowest |
| 1.06 | Supply and fixing of PUF roof panels made up of minimum 0.5mm thick PPGI corrugated Sheet at the top and a plain sheet at the bottom with a layer of rigid CFC free polyurethane foam (PUF) of density 40kg + 2 Kg/cum as insulation in between .The polyurethane foam shall confirm to latest IS 12436. The minimum thickness of PU foam layer shall be 29mm for having 30mm (min) thick PUF panel. The PPGI Sheets shall be of minimum 240 MPA Steel Grade & shall have a Zinc coating of minimum 120 GSM as per IS 277/1992, 5-7 microns of epoxy primer on both sides of the sheet & polyester top coat of 18-20 microns on one side / outer side. The PPGI Sheets / PUF Panels shall have a protective guard film of minimum 20-25 microns to avoid scratches to finished panel during transportation. Providing ridges or hips ,encasing the ends of Panel with plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers etc complete excluding the cost of trusses, purlins and inclusive of cutting to size and shape wherever required. | 91 | Kg | 1,91,555 ₹1,91,555 | 1,91,464 ₹1,91,464 | 1,89,280 ₹1,89,280 Lowest |
| 1.07 | Supplying and fixing of M.S. " L "ANGLES of approved design fortruss using necessary mild steel flats for inner and outermembers which should be fixed to "truss" inclusive of priming coat of best approved quality red oxide primer etc., complete complying with standard specifications. | 1,000 | m2 | 1,35,000 ₹1,35,000 | 1,31,000 ₹1,31,000 | 1,30,000 ₹1,30,000 Lowest |
| 1.08 | Painting the new walls two coats over one coat of priming with best Emulsion paint of approved colour and quality including preparation of surface and finishing neatly etc., complete complying with standard specification and as directed by the department officers etc., complete complying with standard specifications. | 522 | m2 | 1,74,870 ₹1,74,870 | 1,72,260 ₹1,72,260 | 1,67,040 ₹1,67,040 Lowest |
| 1.09 | Finishing the top of flooring with granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete | 91 | m3 | 21,385 ₹21,385 | 20,930 ₹20,930 | 20,020 ₹20,020 Lowest |
| 1.10 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 39 | m3 | 3,12,975 ₹3,12,975 | 3,12,897 ₹3,12,897 | 3,12,390 ₹3,12,390 Lowest |
Tender Value
₹18,000
EMD Value
₹18,000
Closing Date
23 Oct 2025, 3:00 pmClosed
The Executive Officer
Bikkatty ,bikkatty post, the nilgiris
REPARING DAMAGED DOORS,WINDOWS,FLOORING ,WALL PLASTERING AND PAINTING THA BUILDING AT GOVT.HIGHER SECONDARY SCHOOL YEDAKKADU
2025_DTP_616101_1
86/2025
Open Tender
Civil Works - Buildings
Works
90 days
Kilkundah Town Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,000
6 Nov 2025
22 Oct 2025
23 Oct 2025
22 Oct 2025
23 Oct 2025
22 Oct 2025
22 Oct 2025 - 22 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_736160.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
BOQ_736160.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .