Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹4.3 L+₹15,928 (3.87%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Shree Avinashiyappar Agencies L1 | SHREE BAIRAVAR FIRMS L2 |
|---|---|---|---|---|---|
| 1.00Removing the Mono Block Pump set for attending to the repairs and prefixing in the pump room | |||||
| 2.00 | 1HP | 1 | No | 10 ₹10 Lowest | 10 ₹10 Lowest |
| 3.00 | Openwell Mono Block 10 HP | 1 | No | 3,950 ₹3,950 Lowest | 3,950 ₹3,950 Lowest |
| 4.00Charges for the conveyance of the pumpset from the pump room to workshop and back to the site. | |||||
| 5.00 | 1HP | 1 | No | 10 ₹10 Lowest | 10 ₹10 Lowest |
| 6.00 | Openwell Mono Block 10 HP | 1 | No | 1,400 ₹1,400 Lowest | 1,400 ₹1,400 Lowest |
| 7.00 | Charges for Rewinding the motor with PVC insulated Copper wire and insulation materials and labour charges complete after deducting in cost of old copper wire. | - | - | - | - |
| 8.00 | 1HP | 1 | No | 10 ₹10 Lowest | 10 ₹10 Lowest |
| 9.00 | Openwell Mono Block 10 HP | 1 | No | 7,800 ₹7,800 Lowest | 7,800 ₹7,800 Lowest |
| 10.00 | Charges for the damaged bearing removing new bearing fixing including cost of materials and labour ( 1 bearing) | - | - | - | - |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
22 Sept 2026, 3:00 pmClosed
Commissioner
Avinashi Municipality
Rewinding and Repairs to Submersible Openwell Monoblock motors and Openwell motors at 13 to 18 Wards in Avinashi Municipality
2026_MAWS_702157_6
592/2026/E1
Open Tender
Materials
Item Rate
Avinashi Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
Yes
14 Oct 2026
8 Sept 2026
22 Sept 2026
8 Sept 2026
22 Sept 2026
8 Sept 2026
8 Sept 2026 - 22 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing the Mono Block Pump set for attending to the repairs and prefixing in the pump room | - | - | - | - |
| - | 1HP | 1 | No | 1.25 | ₹1.25 |
| - | Openwell Mono Block 10 HP | 1 | No | 2.25 | ₹2.25 |
| - | Charges for the conveyance of the pumpset from the pump room to workshop and back to the site. | - | - | - | - |
| - | 1HP | 1 | No | 4.25 | ₹4.25 |
| - | Openwell Mono Block 10 HP | 1 | No | 5.25 | ₹5.25 |
| - | Charges for Rewinding the motor with PVC insulated Copper wire and insulation materials and labour charges complete after deducting in cost of old copper wire. | - | - | 6.25 | - |
| - | 1HP | 1 | No | 6.25 | ₹6.25 |
| - | Openwell Mono Block 10 HP | 1 | No | 6.25 | ₹6.25 |
| - | Charges for the damaged bearing removing new bearing fixing including cost of materials and labour ( 1 bearing) | - | - | 6.25 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.24 MB
BOQ_844141.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .