Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.5 LAccepted-AOC | L1 | Accepted-AOC As per less than the assessment amount in L1 | |
| 2 | L2₹16.6 L+₹1.0 L (6.63%)Rejected-Finance GANGAPURAM | L2 | Rejected-Finance As per less than the assessment amount in L2 | |
| 3 | L3₹16.8 L+₹1.3 L (8.33%)Rejected-Finance | L3 | Rejected-Finance As per less than the assessment amount in L3 | |
| 4 | L4₹18.9 L+₹3.4 L (21.7%)Rejected-Finance TAMIL NADU TN | KRISHNAGIRI | TAMIL NADU | 635001 | L4 | Rejected-Finance As per less than the assessment amount in L4 |
| Sl No | Description | Qty | Unit | KANNAN NACHIMUTHU L2 | M/S SUMATHI AGENCIES L4 | Sri Nalli Builders L1 | SRI SEEDEVI AMMAN CO L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Towards Geophysical Survey Charges including cost and conveyance and all labour charges etc., complete | 3 | No | 3,500 ₹10,500 Lowest | 4,000 ₹12,000 | 4,500 ₹13,500 | 3,612 ₹10,836 |
| 2.00 | Supply and erection of 200 mm dia PVC causing pipe including cost and conveyance materials all labour charges etc., complete | 54 | M | 700 ₹37,800 | 750 ₹40,500 | 560 ₹30,240 Lowest | 660 ₹35,640 |
| 3.00 | Drilling 150 mm Deep Borewell with including cost and conveyance materials all labour charges etc., complete Upto 150m beloe GL | 450 | M | 280 ₹1,26,000 Lowest | 300 ₹1,35,000 | 400 ₹1,80,000 | 287.4 ₹1,29,330 |
| 4.00 | 151 to 180M | 90 | M | 300 ₹27,000 Lowest | 350 ₹31,500 | 400 ₹36,000 | 310 ₹27,900 |
| 5.00 | 181 to 210M | 90 | M | 380 ₹34,200 | 400 ₹36,000 | 400 ₹36,000 | 361 ₹32,490 Lowest |
| 6.00 | 211 to 240M | 90 | M | 430 ₹38,700 Lowest | 450 ₹40,500 | 500 ₹45,000 | 430 ₹38,700 Lowest |
| 7.00 | 241 to 270M | 90 | M | 450 ₹40,500 Lowest | 550 ₹49,500 | 550 ₹49,500 | 516 ₹46,440 |
| 8.00 | 271 to 300M | 90 | M | 450 ₹40,500 Lowest | 700 ₹63,000 | 600 ₹54,000 | 620 ₹55,800 |
| 9.00 | Earth work excavating and depositing on bank with initial lead of 10 metre and initial lift of 2 metre in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders as per standard specification | 851 | M3 | 160 ₹1,36,160 Lowest | 200 ₹1,70,200 | 200 ₹1,70,200 | 177 ₹1,50,627 |
| 10.00 | Plain Cement concrete 1:4:8 mix using 40mm HBG metal for foundation and flooring including cost of all materials to site and all labour charges for mixing, laying and curing etc., complete as per standard specification | 3 | M3 | 4,800 ₹14,400 | 5,400 ₹16,200 | 4,000 ₹12,000 Lowest | 4,688.88 ₹14,066.64 |
Tender Value
₹24 L
EMD Value
₹24,000
Closing Date
13 Aug 2026, 3:00 pmClosed
Executive Officer
Pallapalayam TP Office, 54 Main Street, Pallapalayam, Erode - 638116
Drilling of New Borewell, HDPE Tank and Extension of Pipe Line at Ward No.1 Thamgamedu, Ward No.14 Melvarsalgkadu and Ward No.15 Goundmpalayam in Pallapalayam Town Panchayat-Erode District
2026_DTP_692412_1
187/2026
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
Works
90 days
Pallapalayam TP
-
2 documents required · 2 mandatory
₹0
₹24,000
Yes
Pallapalayam TP office
16 Sept 2026
8 Aug 2026
13 Aug 2026
8 Aug 2026
13 Aug 2026
8 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Towards Geophysical Survey Charges including cost and conveyance and all labour charges etc., complete | 3 | No | - | - |
| 2 | Supply and erection of 200 mm dia PVC causing pipe including cost and conveyance materials all labour charges etc., complete | 54 | M | - | - |
| 3 | Drilling 150 mm Deep Borewell with including cost and conveyance materials all labour charges etc., complete Upto 150m beloe GL | 450 | M | - | - |
| 4 | 151 to 180M | 90 | M | - | - |
| 5 | 181 to 210M | 90 | M | - | - |
| 6 | 211 to 240M | 90 | M | - | - |
| 7 | 241 to 270M | 90 | M | - | - |
| 8 | 271 to 300M | 90 | M | - | - |
| 9 | Earth work excavating and depositing on bank with initial lead of 10 metre and initial lift of 2 metre in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders as per standard specification | 851 | M3 | - | - |
| 10 | Plain Cement concrete 1:4:8 mix using 40mm HBG metal for foundation and flooring including cost of all materials to site and all labour charges for mixing, laying and curing etc., complete as per standard specification | 3 | M3 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_832531.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .