Loading…
Loading…
Tender Value
₹5.3 L
EMD Value
₹10,508
Closing Date
10 Aug 2026, 4:00 pm
Executive engineer TWID Jammu
Jammu
Construction of 01 No Pump Room including D-Tank at SM Farm Chinore in Jammu District.Tube Well No. 3rd
2026_IFC_317761_1
Fresh e-NIT NO. 11 of 07/2026
Open Tender
Civil Works
Percentage
70 days
Jammu
Please refer tender documents
2 documents required · 2 mandatory
₹500
Executive Engineer TWID Jammu
₹10,508
24 Jul 2026
24 Jul 2026
11 Aug 2026
24 Jul 2026
10 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kinds of soil | 40.15 | cum | 436 | ₹17,505.4 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 4.58 | cum | 4,419.85 | ₹20,242.91 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 15.08 | cum | 4,943.4 | ₹74,546.47 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 20.66 | cum | 6,183.75 | ₹1,27,756.28 |
| 5 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 10.97 | cum | 1,323.65 | ₹14,520.44 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.98 | cum | 8,953.95 | ₹44,590.67 |
| 7 | Structural steel work in built up sections, trusses and framed work, including cutting , hosting , fixing in position and applying a priming coat of approved steel primer all complete | 21.7 | Kg | 92.85 | ₹2,014.84 |
| 8 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc including priming coat with approved steel primer all complete. | 9.94 | Kg | 161.25 | ₹1,602.82 |
| 9 | Providing and fixing 1 mm M.S sheet with frame of 40x40x60mm angle iron and 3mm MS gusset plates at the junctions and corners, all necessary fitting complete, including applying a priming coat of approved steel primer | 1.08 | Sqm | 4,189.6 | ₹4,524.77 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.. | 494 | Kg | 79.25 | ₹39,149.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_1042977.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].