| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹192.3 CrAccepted-AOC KALIKA GUNJ COLONY SIRSIA GIRIDIH JHARKHAND | GIRIDIH | JHARKHAND | 815301 | ₹192.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹194.4 Cr+₹2.1 Cr (1.12%)Rejected-Finance | ₹194.4 Cr+₹2.1 Cr (1.12%) | L2 | Rejected-Finance L2 |
| 3 | L3₹250.8 Cr+₹58.5 Cr (30.4%)Rejected-Finance | ₹250.8 Cr+₹58.5 Cr (30.4%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical NON RESPOSNIVE |
| 5 | Rejected-Technical 303 ISCON MALL NEAR BIG BAZAR 150 FT RING ROAD RAJKOT 360001 GUJRAT | RAJKOT | GUJARAT | 360001 | - | - | Rejected-Technical NON RESPONSIVE |
| Sl No | Description | Qty | Unit | M/S PRASAD CONSTRUCTION & CO L2 | NIRANJAN RAI L1 | BPC INFRAPROJECTS PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of E/I. | 37,187.6 | CUM | 250 ₹92,96,900 | 314.52 ₹1,16,96,243.95 | 159.58 ₹59,34,397.21 Lowest |
| 2.00 | Extra for earth work in hard soil as per specification and direction of E/I. (vide classfication of soil item - B) | 24,263.66 | CUM | 50 ₹12,13,183 | 50.51 ₹12,25,557.47 | 16.3 ₹3,95,497.66 Lowest |
| 3.00 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | 24,351.23 | CUM | 110 ₹26,78,635.3 | 281.52 ₹68,55,358.27 | 58.1 ₹14,14,806.46 Lowest |
| 4.00 | Filling in foundation trenches and plinth in layers. Not exceeding 150 mm thick well watered, rammed fully compacted and fine dressed with earth obtained after cutting within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 12,017.55 | CUM | 170 ₹20,42,983.5 | 354.21 ₹42,56,736.39 | 135.47 ₹16,28,017.5 Lowest |
| 5.00 | Providing coarse clean sand in filling in foundation trenches or plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts includng cost of all materials, Labour, rotalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume). | 6,619.76 | CUM | 750 ₹49,64,820 | 950.21 ₹62,90,162.15 | 619.63 ₹41,01,801.89 Lowest |
| 6.00 | Providing designation 75 A brick work in C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/l. | 1,413.61 | CUM | 5,100 ₹72,09,411 Lowest | 7,540 ₹1,06,58,619.4 | 5,717.83 ₹80,82,781.67 |
| 7.00 | Providing designation 75B brick work in CM (1:6) in Foundation with approved quality of clean coarse & of F.M. 2.5 including providing 10mm thick mortar joints cost of screening, racking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. | 862.04 | CUM | 5,100 ₹43,96,404 Lowest | 6,110 ₹52,67,064.4 | 5,371.39 ₹46,30,353.04 |
| 8.00 | Providing designation 75A brick work in CM (1:6) in superstructure with approved quality of clean coarse & of F.M. 2.5 including providing 10mm thick mortar joints cost of screening, racking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. | 862.44 | CUM | 5,350 ₹46,14,040.63 Lowest | 6,585.21 ₹56,79,332.05 | 5,858.48 ₹50,52,572.85 |
| 9.00 | Providing 125mm thick reinforced designation 75A brickwork in C.M. (1:4) in Superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including the cost of screening, cost of materials, racking out joints to 15mm depth, carriage, taxes and royalty (but excluding the cost of reinforcement) all complete as sper building specification and direction of E/I. | 1,315.2 | SQM | 700 ₹9,20,640 Lowest | 810 ₹10,65,312 | 749.95 ₹9,86,334.24 |
| 10.00 | Extra brick work for each consecutive floor above first floor including watering and scaffolding all compleat as per direction of E/I | 6,015.95 | CUM | 200 ₹12,03,190 | 180.51 ₹10,85,939.13 | 140.66 ₹8,46,203.53 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.4 Cr
Closing Date
22 Dec 2025, 5:00 pmClosed
Nodal Officer
e-Procurement Cell, Jharkhand State Building Construction Corporation Ltd., Ranchi.
Construction of Rajkiye Engineering College, Giridih
2025_JSBCC_106824_1
JSBCCL/45/2025-26
Open Tender
Civil Works - Buildings
Item Rate
720 days
Giridih
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹2.4 Cr
JSBCCL
18 May 2026
24 Nov 2025
23 Dec 2025
24 Nov 2025
22 Dec 2025
24 Nov 2025
1 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of E/I. | 37,187.6 | CUM | - | - |
| - | Extra for earth work in hard soil as per specification and direction of E/I. (vide classfication of soil item - B) | 24,263.66 | CUM | - | - |
| - | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). | 24,351.23 | CUM | - | - |
| - | Filling in foundation trenches and plinth in layers. Not exceeding 150 mm thick well watered, rammed fully compacted and fine dressed with earth obtained after cutting within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 12,017.55 | CUM | - | - |
| - | Providing coarse clean sand in filling in foundation trenches or plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts includng cost of all materials, Labour, rotalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume). | 6,619.76 | CUM | - | - |
| - | Providing designation 75 A brick work in C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/l. | 1,413.61 | CUM | - | - |
| - | Providing designation 75B brick work in CM (1:6) in Foundation with approved quality of clean coarse & of F.M. 2.5 including providing 10mm thick mortar joints cost of screening, racking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. | 862.04 | CUM | - | - |
| - | Providing designation 75A brick work in CM (1:6) in superstructure with approved quality of clean coarse & of F.M. 2.5 including providing 10mm thick mortar joints cost of screening, racking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. | 862.44 | CUM | - | - |
| - | Providing 125mm thick reinforced designation 75A brickwork in C.M. (1:4) in Superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including the cost of screening, cost of materials, racking out joints to 15mm depth, carriage, taxes and royalty (but excluding the cost of reinforcement) all complete as sper building specification and direction of E/I. | 1,315.2 | SQM | - | - |
| - | Extra brick work for each consecutive floor above first floor including watering and scaffolding all compleat as per direction of E/I | 6,015.95 | CUM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
45SBD.pdf
Tender Documents • 9.42 MB
BOQ_144334.xls
BOQ • 0.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .