Loading…
Loading…
Tender Value
₹9.1 L
EMD Value
₹27,443
Closing Date
29 Jul 2026, 12:00 pm4d left
DFO Basohli
DFO Basohli
please refer BOQ and tender doc
2026_FD_315230_4
07 of 2026-27
Open Tender
Civil Works
Percentage
30 days
Mahanpur
please refer BOQ and tender doc
2 documents required · 2 mandatory
₹600
Yes
0406 Forest Revenue
₹27,443
Yes
24 Jul 2026
24 Jul 2026
29 Jul 2026
24 Jul 2026
29 Jul 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Trench Plantation : 2026-27 | |||||
| 1.01 | Planting of poly raised saplings in staggered trenches of size 90cm x 45cm x 45cm with one plant in each trenche. The work includes cost of digging of trenches, sorting out grasses and pabbles out of dugout soil, transportation of saplings from nursery to the plantation site including loading and unloading of plants , site clearance, excavation of soil, planting of saplings/seedlings in the trenchs, refilling with clean surface soil after planting with provision for water harvesting structure and its ramming properly. | - | Nos | - | - |
| 2Patch Sowing :- 2026-27 | |||||
| 2.01 | Patch Sowing of required spp. in patches of size 45cm x 45cm x 15cm. The worck includes cost of excavation of soil for preparaton of patches of desired size, sorting out grasses and pabbles out of dugout soil, procurement of seeds, carriage of seeds upto site of work, sowing of 4-5 seeds in each patch. | - | Nos | - | - |
| 3Grass Slips :- 2026-27 | |||||
| 3.01 | Planting of Grass slip of required spp. in patches. The work includes cost of excavation of soil for preparation of patches, extraction of grass slips from nurseries, carriage of grass slips from nurseries upto site of work and its planting. | - | Nos | 1 | - |
| 4BUC-PB Pit Planting Planting (Ist Year) during 2027-28 | |||||
| 4.01 | BUC-PB Pit Planting of poly raised saplings in staggered pits of size 45cm x 45cm x 45cm with one plant in each pit. The work includes cost of digging of pits, sorting out grasses and pabbles out of dugout soil, transportation of saplings from nursery to the plantation site including loading and unloading of plants , site clearance, excavation of soil and planting of saplings/seedlings in the trench, refilling with clean surface soil after planting with provision for water harvesting structure. | - | Nos | 1 | - |
| 5BUC-PB Pit Planting (2nd Year) during 2028-29 | |||||
| 5.01 | BUC-PB Pit Planting of poly raised saplings in staggered pits of size 45cm x 45cm x 45cm with one plant in each pit. The work includes cost of digging of pits, sorting out grasses and pabbles out of dugout soil, transportation of saplings from nursery to the plantation site including loading and unloading of plants , site clearance, excavation of soil and planting of saplings/seedlings in the trench, refilling with clean surface soil after planting with provision for water harvesting structure. | - | Nos | 1 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_1041730.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].