Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.8 L+₹7,911.70 (4.48%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.0 L+₹23,774.74 (13.5%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.0 L
EMD Value
₹5,940
Closing Date
11 Aug 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
Community Washroom near Masjid ShareefGaniMuhallahMawer.
2026_RDPR_319584_3
NIT NO 86 OF 2026-27 CDF MAWER
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹5,940
Yes
17 Aug 2026
6 Aug 2026
11 Aug 2026
6 Aug 2026
11 Aug 2026
6 Aug 2026
6 Aug 2026 - 6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechenical means in trenches for foundation (Not exceeding 1.5m in width), depth upto 1.5m incl. disposal of excavated earth upto 1m from cutting edge. (All Kinds of Soil) | - | Cum | - | - |
| 2 | Providing & laying of dry solling hand packing, in foundation & Trecnhes incl all carraiges | 1 | Cum | - | - |
| 3 | P/L in position cement conc. of grade 1:4:8 (1 cement : 4 fine sand : 8 stone agg 40 mm N/s) excl. cost of centering & shuttering in all work upto plinth level | 1 | Cum | 1 | ₹1 |
| 4 | P/L in position cement conc. of grade 1:3:6 (1 cement : 3 fine sand : 6 stone agg 20 mm N/s) excl. cost of centering & shuttering in all work upto plinth level. | - | Cum | - | - |
| 5 | P/L of D.P.C. 40mm thick with Cement Concrete 1:2:4 (20 mm N/S ) | - | Cum | 1 | - |
| 6 | Brick work with common burnt clay F.P.S. (non-modular) bricks of class designation 75 in foundation & plinth in cement mortar 1:6 (1 Cement : 6 coarse sand) | - | Cum | - | - |
| 7 | Extra for B/w above Plinth Level upto Floor V Level | - | Cum | - | - |
| 8 | Centering and Shuttering I/c Strutting, Propping etc & removal of formwork for roof. | - | Cum | - | - |
| 9 | a | 1 | SQM | - | - |
| 10 | b | - | SQM | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_1059088.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .