Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Qulified |
| 2 | Accepted-Technical | Accepted-Technical Qulified |
| 3 | Accepted-Technical | Accepted-Technical Qulified |
Tender Value
₹35.1 L
EMD Value
₹70,500
Closing Date
9 Dec 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE-V BTPS Obra
Office of SE-V BTPS Obra
Contract for cleaning and other related work, Breaking of big size coal boulders, stone and cleaning of hopper of Wagon Tippler No. 1 and 2 of A CHP of CHD-III BTPS Obra
2025_RVUNL_1082693_1
N-OBR////6000009690/SE-V
Open Tender
Repair and Maintenance Works
Fixed-rate
150 days
CHD-III BTPS Obra
As per PQC
3 documents required · 3 mandatory
₹1,180
Dy CAO CFA and BO BTPS
₹70,500
24 Dec 2025
14 Oct 2025
11 Dec 2025
14 Oct 2025
9 Dec 2025
14 Oct 2025
14 Oct 2025 - 9 Dec 2025
Part-I Cleaning work in each shift of ‘A’CHP, CHD-III, BTPS (01 Job= one shift of 08Hrs)
Part-II Cleaning work of motor reduction gear box, structure, overhead crane, stairs , inner area of wagon tippler no. 1&2
Cleaning of outer area of wagon tippler’s building, floor, drains and dump garbage at one place by collecting from water spray system to Conv No.1 and dispose off these garbage at place as per instruction by concern officer.
Cleaning of motor reduction gear box, stairs etc of belt feeders. 1,2,3,& 4 and coal, coal dust , mud lying on the floor as per require. It is also included the cleaning of coal lying in hopper of wagon tippler 1&2 and its shifting during damage of belt feeder.
Cleaning of motor reduction gear box stairs etc. of Conv-1A/Conv-1B and cleaning of structure, ducting pump motor, counter weight and coal dust lying on floor, and cleaning of coal dust ,collection system pump pits, and drainage system of the T.P.-1
Cleaning of motor reduction gear box , structure, ducting, counter weight pump motor, stairs of Conv-8 and cleaning of coal, dust and mud lying on the floor and also cleaning of outer and inner drains etc.
Cleaning of motor reduction gear box, structure, ducting, counterweight, pump stairs and coal dust and coal lying on the floor of conveyer Conv-6 and also cleaning of dust collection system, pump pits and drains of conveyer-6.
Cleaning of motor reduction gear box, structure and stairs of swing feeders no. 1,2,3,4,5,6 and vibrating feeders of 1,2,3,4 and also including cleaning of hopper of vibrating feeders and swing feeders.
Cleaning of motor reduction gear box, structure, stairs, ducting and coal dust, mud lying on the floor of K-2A & K-2B and included the work of disposal of foreign materials such as iron etc from the magnet of conv 2A&2B as per instruction of site engineer.
Cleaning of motor reduction gear box, structure , stairs counterweight, ducting, dust collection system and cleaning of coal, dust, mud lying on the floor of K-3A & K-3B
Cleaning of motor reduction gear box , structure ducting counter weight stairs pump motor, coal, dust and mud lying on the floor, dust collection system, pump pits cleaning of drains of K-9.
Cleaning of floor, pits, ducting, spares Plate form, motor, crusher D-1, D-2 of Crusher House and also cleaning of mesh of magnetic separators, ducting. It is also included the work of disposal of fall down the coal pieces from magnetic separator at separate, separate places.
Cleaning of air duct of Crusher D-1 & D-2
Shifting of coal to coal yard which are collected near of Conv-2, Conv-3, Conv-7 and TP 3, 4, 6. Disposal of wet coal to outer area and dry coal on Conv-8 of TP-4, Cleaning pit of water valve above Conv-8 coal, pyrite lying on the road fallen from coal yard and shifting to coal yard by manual as per requirement.
Shifting of coal to coal yard which are collected near of Conv-2, Conv-3, Conv-7 and TP 3, 4, 6. Disposal of wet coal to outer area and dry coal on Conv-8 of TP-4, Cleaning pit of water valve above Conv-8 coal, pyrite lying on the road fallen from coal yard and shifting to coal yard by Turk as per requirement.
Cleaning of reduction gear box, plunger plate form, pump motor, structure ducting coal, coal dust, mud lying on the floor, pit drainage system including stairs and platform between Conv-7 & Conv-13.
Cleaning of Wagon Tippler No. 1 & 2, Belt Feeder 1, 2, 3 & 4, Conveyor from 1 to 9 and cleaning of Switch gear room of wagon tippler.
Cleaning the outer area of Dozer Section, Compressor House, and cleaning of its floors drainage system and also included the cleaning work of the area behind conv-3 of Crusher House and the drainage system of Coal yard of ‘A’ CHP.
Shifting the Dust garbage.
Cleaning of all type of Trench, drains, and pits.
To unload the coal from de-railed coal wagons and shifting it as per departmental instruction.
Part-III Breaking of big size coal boulders in the hopper of Wagon tippler No.1 & 2 and also cleaning of hopper. (01 Job= one shift of 08Hrs).
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
NITII.pdf
Tender Documents • 27.83 MB
BOQ_1983031.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .