Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.8 LAccepted-AOC | ₹31.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹34.3 LRejected-Finance | ₹34.3 L | L2 | Rejected-Finance L2 |
| 3 | L3₹35.2 LRejected-Finance | ₹35.2 L | L3 | Rejected-Finance L3 |
| 4 | L4₹37.6 LRejected-Finance | ₹37.6 L | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | MITTAL BROTHERS L1 | sbg buildcon pvt ltd L2 | M/S KUNJ BEHARI LAL CONTRACTOR L3 | M/S RAJPAL SINGH CONTRACTOR L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material as per direction of Engineer-in-charge. | 36.84 | cum | 500 ₹18,420 | 440 ₹16,209.60 | 453.2 ₹16,695.82 | 259 ₹9,541.56 |
| 2.00 | Earth work in foundation in all types of soil including all lift and all lead including back filling, watering and ramming of excavated earth into the trenches or into the space between the surface and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as direction by the engineer-in-charge. | 531.17 | cum | 50 ₹26,558.50 | 62 ₹32,932.54 | 62.99 ₹33,459.89 | 32.4 ₹17,209.91 |
| 3.00 | Providing and laying C.C. (A-20M10)(1:3:6) including all cost of materials, labour and T&P etc complete. | 38.52 | cum | 4,800 ₹1.8 L | 4,500 ₹1.7 L | 4,603.02 ₹1.8 L | 4,997.95 ₹1.9 L |
| 4.00 | Providing & laying 1st class (M-150) Brick work pitching in 1:4 with cement mortar including all cost of materials, labour and T&P etc complete. | 86.62 | cum | 5,000 ₹4.3 L | 4,715 ₹4.1 L | 4,874.2 ₹4.2 L | 5,181.03 ₹4.5 L |
| 5.00 | Providing and laying C.C. (A-20M20)(1:1.5:3) including all cost of materials, labour and T&P etc complete. | 196.92 | cum | 5,200 ₹10.2 L | 6,191 ₹12.2 L | 6,139.3 ₹12.1 L | 6,595.98 ₹13.0 L |
| 6.00 | Centering and shuttering work including cost of all labour and T&P etc complete. | 634.52 | sqm | 600 ₹3.8 L | 490 ₹3.1 L | 503.07 ₹3.2 L | 534.75 ₹3.4 L |
| 7.00 | Providing & dumping 20-40 Kgs. Boulder in Aprons of floor of head regulator within 30M lead including all cost of material, labour and T&P etc complete. | 147.69 | cum | 1,800 ₹2.7 L | 2,575 ₹3.8 L | 2,823.3 ₹4.2 L | 2,968.84 ₹4.4 L |
| 8.00 | Providing flush pointing in 1:2 with cement mortar including cost of all material labour and T&P etc complete. | 124 | sqm | 125 ₹15,500 | 90 ₹11,160 | 92.26 ₹11,440.02 | 95.65 ₹11,860.60 |
| 9.00 | Providing and laying R.C.C. (A-20M25)(1:1:2) including all cost of materials, labour and T&P etc complete. | 106.93 | cum | 6,200 ₹6.6 L | 6,700 ₹7.2 L | 7,053.23 ₹7.5 L | 7,738.56 ₹8.3 L |
| 10.00 | Supplying and laying TMT Steel bar reinforcement (Fe-550D) including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the required work. | 2.62 | MT | 65,000 ₹1.7 L | 62,000 ₹1.6 L | 62,205.39 ₹1.6 L | 67,545 ₹1.8 L |
Tender Value
₹40.9 L
EMD Value
₹82,000
Closing Date
12 Sept 2025, 3:00 pmClosed
SE 1ST IWC MEERUT
SE OFFICE 1ST IWC MEERUT
As per the NIT
2025_UPIDC_1071640_3
04/SE-1/2025-26
Open Tender
Civil Works
60 days
MEERUT
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹82,000
SE OFFICE 1ST IWC MEERUT
25 Dec 2025
6 Sept 2025
12 Sept 2025
6 Sept 2025
12 Sept 2025
6 Sept 2025
10 Sept 2025
Amount
Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material as per direction of Engineer-in-charge.
Earth work in foundation in all types of soil including all lift and all lead including back filling, watering and ramming of excavated earth into the trenches or into the space between the surface and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as direction by the engineer-in-charge.
Providing and laying C.C. (A-20M10)(1:3:6) including all cost of materials, labour and T&P etc complete.
Providing & laying 1st class (M-150) Brick work pitching in 1:4 with cement mortar including all cost of materials, labour and T&P etc complete.
Providing and laying C.C. (A-20M20)(1:1.5:3) including all cost of materials, labour and T&P etc complete.
Centering and shuttering work including cost of all labour and T&P etc complete.
Providing & dumping 20-40 Kgs. Boulder in Aprons of floor of head regulator within 30M lead including all cost of material, labour and T&P etc complete.
Providing flush pointing in 1:2 with cement mortar including cost of all material labour and T&P etc complete.
Providing and laying R.C.C. (A-20M25)(1:1:2) including all cost of materials, labour and T&P etc complete.
Supplying and laying TMT Steel bar reinforcement (Fe-550D) including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the required work.
sbg buildcon pvt ltd (BID ID -5526435)
M/S KUNJ BEHARI LAL CONTRACTOR (BID ID -5528382)
M/S RAJPAL SINGH CONTRACTOR (BID ID -5529061)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid