Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC 53 VAISHAILI ENCLAVE SECTOR 9 INDIRA NAGAR LUCKNOW | LUCKNOW | ₹2.0 Cr | L1 | Accepted-AOC Being the lowest bidder |
| 2 | L2₹2.0 Cr+₹4.4 L (2.24%)Rejected-AOC D S 185 186 SECTOR D LDA COLONY KANPUR ROAD LUCKNOW LUCKNOW UTTAR PRADESH 226012 | LUCKNOW | UTTAR PRADESH | 226012 | ₹2.0 Cr+₹4.4 L (2.24%) | L2 | Rejected-AOC Not being the lowest bidder |
| 3 | L3₹2.4 Cr+₹38.1 L (19.2%)Rejected-AOC E76 LGF KALKAJI BHAIRAV MANDIR NEW DELHI DELHI 110020 | SOUTH EAST DELHI | DELHI | 110020 | ₹2.4 Cr+₹38.1 L (19.2%) | L3 | Rejected-AOC Not being the lowest bidder |
| 4 | L4₹2.5 Cr+₹48.5 L (24.5%)Rejected-AOC E 2 216 GROUND FLOOR SHIV RAM PARK NEAR LUCKY GARDEN NANGLOI NEW DELHI 110041 | WEST DELHI | DELHI | 110041 | ₹2.5 Cr+₹48.5 L (24.5%) | L4 | Rejected-AOC Not being the lowest bidder |
| 5 | L5₹3.0 Cr+₹1.0 Cr (50.7%)Rejected-AOC 4TH FLOOR VOLTAS HOUSE A BLOCK DR BABASAHEB AMBEDKAR ROAD CHINCHPOKLI MUMBAI MAHARASHTRA 400033 | MUMBAI | MAHARASHTRA | 400033 | ₹3.0 Cr+₹1.0 Cr (50.7%) | L5 | Rejected-AOC Not being the lowest bidder |
Tender Value
₹2.6 Cr
EMD Value
₹5.1 L
Closing Date
20 Feb 2018, 6:00 pmClosed
Sr. Manager (Engg.-E)-II
Airports Authority of India, CCSI Airport, Lucknow
Operation and Maintenance of Central Air conditioning System of T-2 Building ,T-1 Building, Window/Split/ Tower/ Cassette / Ductable type Air- Conditioners/Package AC , Water Coolers and Water purifiers at different locations, Water Treatment Plant
2018_AAI_7372_1
AAI/LKO/SM(E-E)-II/ eNIT-11/2017-18
Open Tender
Electrical Works
Item Rate
730 days
Lucknow
As per eNIT
17 documents required · 17 mandatory
₹1,120
Yes
Revenue Collection (Lucknow Airport) A/C
₹5.1 L
Yes
20 Jan 2020
10 Feb 2018
26 Feb 2018
10 Feb 2018
20 Feb 2018
10 Feb 2018
10 Feb 2018 - 19 Feb 2018
Amount
Day to day Operation & routine Maintenance of electrical and mechanical installations of central Air - conditioning system of T-2 Building complete with 3 X 300 TR chiller plant and associated accessories e.g. panels, pumps, cooling towers, AHUs, In line fan, control etc. job includes carrying out schedule maintenance as required or instructed from time to time. The scope of work includes operation round the clock 24 hrs a day and records & documentation ets as per detailed specification, terms and conditions covered under this contract on all days in three shifts of 8hrs each i/c Saturday, Sunday and Gazzetted holidays . The manpower required for operation of the AC Plant is as follows: a) Highly skilled Supervisor in General shift i.e. One No. per day (six days a week). b) Skilled AC Mechanic/Technician one each for three shifts i.e. 3 Nos. per day with reliever. c) Semi-skilled AC Plant operator one each for three shifts i.e. 3 Nos. per day with reliever. d) Unskilled Helper one each for three shifts i.e. 3 Nos. per day with reliever. e) Unskilled Helper 1 Nos. in General shift i.e. 1 Nos. per day (six days a week)
Day to day Operation & routine Maintenance of BMS system of T-2 Building installed inclusive of computer etc. the scope of work includes operation and routine maintenance maintaining records & documentation ets as per detailed specification, terms and conditions covered under this contract on all working days in three shifts i/c Sundays and holidays. The manpower required for operation of the AC Plant is as follows: a) Skilled BMS Operator one each for three shifts i.e. 3 Nos. per day with reliever.
Comprehensive Maintenance & repair of 3 nos. SCREW WATER CHILLING UNITS each of 300 TR capacity Central AC plant of T-2 Building & associated accessories comprising as per Annexure 'SOQ-A'.
Supply ,fixing & replacement of rigid honeycombed ,double edge folded,cross corrugated PVC Fills of size:600mmx300mmx150mm in the cooling towers of T-2 Building AC Plant complete as required
Supply & fixing of 90mm dia. Nozzle in the cooling tower of T-2 Building AC Plant complete as required for proper flow of water over the fills in solid cone,square pattern. .
Supply & mixing of the following chemicals in the cooling tower of T-2 Building AC Plant as per the attached schedule.
a) antiscalent chemical.
b) corrosion inhibitor
c) non oxydising biocide chemical
d) oxydising biocide chemical.
Supply,installation,testing,commissioning & retrofitting/replacement of 2400 mm dia. Aluminium alloy cooling tower fan assembly in the existing 300 TR cooling tower of T-2 Building AC Plant complete as required for proper functioning of all the parts of the cooling tower after replacement with proper alignment ,coupling of the motor , existing water sprinkler system as per OEM recommendation.
SITC & replacement of new fire damper only as existing suitable to be give the signal to motorised actuator for tripping of AHU of T-2 Building AC Plant as per the size of AHU duct complete as required during fire ,etc.
SITC of suitable motorised actuator as existing for operating on sensing the signal from the abovementioned fire damper for tripping the AHU of T-2 Building AC Plant during fire complete as required.(Make: Belimo,NM=10,240 V AC/24 VDC,50 /60 Hz ,6 W )
Supply & Replacement of 11KW VFD drive including setting of parameter and also making new programming according to for AHU of T-2 Building AC Plant operation complete as required as per site requirement.(Make: DANFOSS)
Operation & Maintenance i/c attending preventive and routine maintenance of 3nos X 120 TR Water cooled air-conditioning plants , heating plant complete with reciprocating compressor, chiller and condensor units with respective pumps, motors and FCU's/AHU's installed in different places of Terminal Building-1 and 105 KW hot water generator,Water Treatment Plant along with interconnected power and control panels, cooling towers, water softening plant and accessories etc. of T-1 Building AC Plant on all working days i/c Saturday Sunday and Gazzetted holidays by deploying required manpower in all three shift of 8 hours as per attached special condition of contract. The manpower required for Operation of the AC Plant is as follows: a) One skilled AC Mechanic/Technician in General shift per day (six days a week) b) One semiskilled AC Plant Operator in each shift A,B,C i.e. 3Nos. per day with reliever. c) One unskilled helper in each shift A,B,C i.e. 3Nos. per day with reliever. d) One unskilled helper in General shift per day.(six days a week)
Supply ,fixing & replacement of rigid honeycombed ,double edge folded,cross corrugated PVC Fills of size:600mmx300mmx150mm in the cooling towers of T-1 Building AC Plant complete as required
Supply & Laying of FRP coating on the cooling tower base of T-1 Building AC Plant as required so that it is complete water leak proof as per the recommendation of OEM. (Make: Mihir).
Supply,installation,testing,commissioning & retrofitting/replacement of 1800 mm dia. Aluminium alloy cooling tower fan assembly in the existing 120 TR cooling tower of T-1 Building AC Plant complete as required for proper functioning of all the parts of the cooling tower after replacement with proper alignment ,coupling with the motor , sprinkler system as per OEM recommendation.
Supply,installation,testing,commissioning & retrofitting/replacement of 5'' dia. Hub Sprinkler in the existing 120 TR cooling tower of T-1 Building AC Plant complete as required for proper functioning of all the parts of the cooling tower after replacement with proper alignment ,coupling with the fan assembly, motor , as per OEM recommendation.
Supply & recharging the media vessel of Water Treatment Plant of T-1 Building AC Plant following materials and testing & commssioning the vessel for proper functioning of the water treatment Plant complete as required.
a) 16-32 quartz sand
b) 4-8 Mesh Sylex.
c) 2-4 Mesh Sylex.
d) 1/2'' x 1'' pebbles.
Supply & recharging the water softening Plant of Water Treatment Plant of T-1 Building AC Plant by Resin 22 NA and testing & commssioning the vessel for proper functioning of the water treatment Plant complete as required. Resin 220 NA
Rewinding of Chiller/Condenser motor of 25HP of T-1 Building AC Plant with varnishing & greasing in bearing as and when required as per direction of Engg.-Incharge i/c less for dismantled copper.
Rewinding of Chiller /Condenser motor of 20HP of T-1 Building AC Plant with varnishing & greasing in bearing as and when required as per direction of Engg.-InCharge i/c less for dismantled copper.
Rewinding of AHU motor of 12.5 HP of T-1 Building AC Plant with varnishing & greasing in bearing as and when required as per direction of Engg.-Incharge i/c less for dismantled copper.
Rewinding of CT Fan motor of 10 HP of T-1 Building AC Plant with varnishing & greasing in bearing as and when required as per direction of Engg.-Incharge i/c less for dismantled copper.
Rewinding of AHU motor of 7.5 HP of T-1 Building AC Plant with varnishing & greasing in bearing as and when required as per direction of Engg.-Incharge i/c less for dismantled copper.
Supply and charging of Refrigerant (R-22) in T-1 Building AC Plant system as and when required basis as per direction of Engg.-Incharge.
Providing and replacement of liquid line drier core filter in refrigerant line in T-1 Building AC Plant as per requirement.(Make:DANFOSS)
Supply of SKF make Bearing for Pump motor 20/25HP in T-1 Building AC Plant of following size complete as required.
Supply and replacement of refrigerant compressor oil (Indian Oil : Servo 68/SUNNISO) of T-1 Building AC Plant in the system as and when required.
Supply and fixing of CI Coupling R.R.L 150/140 in T-1 Building AC Plant as required.
Supply ,installation ,testing and commisioning of condensor line relief valve of T-1 Building AC Plant as required
Supply ,installation ,testing and commisioning of angle valve of T-1 Building AC Plant as required.
Supply ,installation ,testing and commisioning of AHU shaft bearing NTN P207 of T-1 Building AC Plant as required
Supply of AHU V-belt of T-1 Building AC Plant as following.
a) V belt B-92
b) V belt B-94
c) V belt B-96
d) V belt B-112
Supply ,installation ,testing and commisioning of loader -unloader assembly for 120TR compressor (Make kirloskar) of T-1 Building AC Plant as required.
Supply,installation,testing & Commissioning of glycerine filled ,back connection refrigerant pressure gauges to measure oil/suction/discharge pressure of 120 TR compressor of T-1 Building AC Plant complete as required.
Overhauling,repairing,Servicing of 1 No. 120 TR Kirloskar make ,Model: AC 1670, Central AC Plant compressor of T-1 Building AC Plant ,replacement of the parts as follows:as per OEM recommendation and final testing & Commissioning,etc complete as required. a) SITC & replacement of complete 16 Nos. cylinders/cylinder sleeves,etc. including other accessories complete as required. b)SITC & replacement of complete 16 Nos. piston assembly/piston rings,springs,etc. including other accessories complete as required c)SITC & replacement of complete 16 Nos. connecting rods including other accessories complete as required & Grinding of the main shaft to make its surface perfectly smooth & its alignment with the seal end bearing & centre bearing,etc complete as required for its proper functioning after reinstallation. d)All the other accessories like replacement of solenoid valve , repairing of oil pump assembly, suction valve, discharge valve,, changing/cleaning the filters, etc. & overhauling charges are also included in the item to make the compressor completely functional satisfatorily as per OEM recommendation after overhauling etc. complete as required.
SITC of refrigerant gas line valves in the 120 TR of T-1 Building AC Plant Make: Castell ,K10 suitable for max. pressure 35nm complete as required.
SITC of expansion valve suitable for 120 TR Kirloskar make chiller of T-1 Building AC Plant Make: Sporlan ST. Louis-707 or equivalent approved make including its connection with the chiller complete as required as per recommendation of OEM.
SITC of new star delta starter suitable for 25 hp chiller line motor-pump set & replacement/retrofitting in the existing Main Supply Panel in the AC Plant Room which includes required contactors , control relays, timer, MCB, rewiring , cabling, termination,etc required as complete with all the safety features such as short-circuit tripping, overload tripping, undervoltage-overvoltage tripping, automatic change over from star to delta,etc in T-1 Building AC Plant.
SITC of new star delta starter suitable for 20 hp condensing line motor-pump set & replacement/retrofitting in the existing Main Supply Panel in the AC Plant Room which includes required contactors , control relays, timer, MCB, rewiring , cabling, termination,etc required as complete with all the safety features such as short-circuit tripping, overload tripping, undervoltage-overvoltage tripping, automatic change over from star to delta,etc. in T-1 Building AC Plant
SITC of new D.O.L starter suitable for 10 hp cooling tower motor set & replacement/retrofitting in the existing Main Supply Panel in the AC Plant Room which includes required contactors , control relays, timer, MCB, rewiring , cabling, termination,etc required as complete with all the safety features such as short-circuit tripping, overload tripping, undervoltage-overvoltage tripping, etc. in T-1 Building AC Plant.
Overhauling of Aircircuit breakers (Make: GEC ALSTOM) of T-1 Building AC Plant of following rating including replacement of all the defective parts like relays, terminals ,contacts,contactors,etc. ,rewiring ,control wiring & other repairs required to make it properly functional as per the recommendation of OEM.
Painting of all the parts of Central AC Plant of T-1 i.e. all the 3 Nos. compressors & discharge lines,suction lines,all the chilled water lines (incoming & outgoing), all the 3 Nos. Cooling towers , its condensing water lines (incoming & out going both) & motors ,all the electrical panels , all the 3 Nos.chilled water line motor pump sets,all the 3 Nos. condensing water line motor pump sets, all the 12 Nos. AHUs , its chilled water lines (incoming & outgoing both) & motors,2 Nos. vessels of Water Treatment plant, its pipelines & all the other parts of AC Plant by applying two coats of suitable paints along with red oxide primer wherever required of original colour as per standards complete as required after taking approval from E-I-C for colour, make,etc of the paint.
All inclusive Comprehensive maintenance and repair (except deputing regular manpower) including attending preventive & breakdown maintenance including replacement of faulty compressor, condenser, fan blade, evaparator blower, shaft, bush, running & starting capacitor, thermostate, relay, switch, copper piping, drain piping, insulations, PCB and refrigerant gas etc. of following window /split/ Tower/ Ductable/ Cassette Air-Conditioner alongwith their stablizers ( if any) at various locations of different make and capacities including interconnecting wiring etc except manpower required for repairing,replacement ,servicing & overhauling,etc complete as required. { Cost of above items including compressor to be replaced shall be included in the rates quoted}- For period of two year.
a) 1.5 TR Capacity Window Air-Conditioner
b) 1.0 / 1.5TR Capacity Split Air-Conditioner
c) 2.0 TR Capacity Split Air-Conditioner.
d) 2.00 TR Capacity Tower Type Air-Conditioner
e)2.00 TR Capacity Cassette Air-Conditioner
f) 3.00 TR Capacity Tower Type Air-Conditioner
g) 3.00 TR Capacity Cassette Air-Conditioner
h) 4.00 TR Capacity Cassette Air-Conditioner
All inclusive Comprehensive maintenance and repair (except deputing regular manpower) including attending preventive & breakdown maintenance including replacement of faulty condenser, fan blade, evaparator blower, shaft, bush, running & starting capacitor, thermostate, relay, switch, copper piping, drain piping, insulations, PCB and refrigerant gas etc. of water coolers at various locations of different make and capacities including interconnecting wiring required for repairing,replacement ,servicing & overhauling,etc complete as required. { Cost of above items excluding compressor to be replaced shall be included in the rates quoted}. For period of two years.
Comprehensive maintenance Contract (except deputing regular manpower) of water purifiers at various locations of different makes having flow rate 3 ltr. Per minute,comprising of replacement of U.V. lamps,controller,etc as required during breakdown & replacement of Carbon filter and pre-filter twice in two years,etc. required for repairing,replacement ,servicing & overhauling,etc complete as required for two years. (Non Reverse Osmosis types)
Comprehensive maintenance Contract (except deputing regular manpower) of water purifiers at various locations of different makes having flow rate 50 ltr. Per hour,comprising of replacement motor,controller ,etc during breakdown & replacement of Reverse Osmosis filter ,Carbon filter and pre-filter twice in two years, required for repairing,replacement ,servicing & overhauling,etc complete as required for two years. ( Reverse Osmosis types)
Comprehensive periodical maintenance (except deputing regular manpower) of 15 TR ductable package type air-conditioner (Make:Weston) units installed in CCR Hall including replacement of all necessary parts, spares,attending all the breakdowns/faults etc so that the system remains properly functioning uninterrupted complete as required as per OEM specifications,standards &recommendations.
Providing manpower for operation as required & comprehensive maintenance, repair, replacement,servicing ,overhauling,etc including attending preventive & breakdown maintenance as specified in tender documents for above items from 42 to 46. The manpower required for comprehensive maintenance of items 42 to 46. a) Semi-skilled AC mechanic-one each for three shifts i.e. 3 Nos. per day with reliever b) Unskilled Helper- one each for three shifts i.e. 3 Nos. per day with reliever
Operation & Maintenance of Water Supply System of T-2 Building including operation of all types of water pumps of different makes i.e. submersible borewell pump, monobloc pumps, pneumatic system pumps,valves, pipelines, starter panels,electrical panels & Water Treatment Plant vessels etc. complete as required. The scope of work includes operation round the clock 24 hrs. a day and records & documentation ets as per detailed specification, terms and conditions covered under this contract on all working days in three shifts of 8 hrs. i/c Sundays and holidays. The manpower required for for operation is as follows: One semi-skilled operator in three shifts i.e. 3 Nos. per day with reliever. One unskilled helper in General shift per day .(six days a week) All the maintenance works of submersible borewell pump, monobloc pumps, pneumatic system pumps,valves, pipelines, starter panels,electrical panels & Water Treatment Plant vessels etc. is to be carried out as per OEM recommendations & submitting the test certificates of water for all the characteristics like hardness, TDS, BOD,etc.
Supply,Installation,Testing & Commissioning & replacement of water treatment plant FRP vessel ,Make: IONEXCHANGE , Model : 4872 with top & bottom strainer complete as required as per OEM recommendation in T-2 Building Water Treatment Plant .The work is to carried out by OEM or its authorised dealer.
Supply,Installation,Testing & Commissioning & replacement of water treatment plant FRP vessel ,Make: IONEXCHANGE , Model : 3672 with top & bottom strainer complete as required as per OEM recommendation in T-2 Building Water Treatment Plant The work is to carried out by OEM or its authorised dealer & includes dismantling of old vessel and submitting to AAI store as per E-I-C directions..
Supply & recharging the media,carbon ,water softening vessel ,chlorine tank,etc of T-2 BuildingWater Treatment Plant of following materials and testing & commissioning the vessel for proper functioning of the water treatment Plant complete as required.
a) 16-32 quartz sand
b) 4-8 Mesh Sylex.
c) 2-4 Mesh Sylex.
d) 1/2'' x 1'' pebbles.
e) Activated Carbon 900 IV
f) Resin 220 NA
g) chlorine
h) Water sampling & submitting the test certificates of water for all the characteristics like hardness, TDS, BOD,etc from government authorised test laboratory.
Dismantling and rewinding of 4HP to 15 HP submersible/monobloc/pneumatic pump motor set of T-2 Building Water Treatment Plant. with original no of turns and same wire gauge insulated copper wire including replacement of all the internal worn out / defective parts i.e bushes, impellers, sleeves, upper and lower bush sets, thrust bearing, oil seals, rotor grinding and balancing, assembling, to & from transportation of motor, re-installation, termination of connecting lead, connection, testing & commissoing complete as required. (Dismantled copper wire need not to return.)
Lifting and lowering of bore well submersible pump motor set of T-2 Building Water Supply Plant of capacity 5HP to 15 HP.
Supply of 12.5 HP Stainless steel Submersible pump motor set suitable for 415V, 50 Hz power supply having following specifications. HP-12.5, No of Stages-10 , Outlet size - 65 mm, Head range- 70 mtr to 45 mtr. Discharge- 0-516 LPM. ( Make: KSB, Model BPD 242/10 A+UMAI 150 or approved equivalent.)
Supply of fully automatic Star/Delta type induction motor starter suitable for 12.5 hp submersible pumpset of T-2 Building Water Supply Plant along with all accessories .( Make L&T or equivalent.)
Comprehensive Maintenance of water treatment plant (Make: Enviro) of AAI Admin. Block including attending all the breakdowns/faults , replacement of all the defective parts like all three vessels,valves,water controller, chlorine dosing plant,etc . The item includes all the replacement of the defective parts for proper functioning of the plant as per OEM recommendations , Monthly visit by OEM technician & breakdown/faults, etc. & maintaining all the documents,records,etc. as required.
Supply & recharging the media,carbon ,water softening vessel ,chlorine tank,etc of AAI Admin. Block Water Treatment Plant (Make:Enviro) of following materials and testing & commissioning the vessel for proper functioning of the water treatment Plant complete as required.
a) Sand Media
b) Carbon Media
c) Softener Resin
d) Chlorine
e) Hardness Kit.
f) Water sampling & submitting the test certificates of water for all the characteristics like hardness, TDS, BOD,etc from government authorised test laboratory.
ANOOP REFRIGERATION
Skyline Airconditioning Engineers Pvt. Ltd.
Supertech Engineers
Voltas Limited
Bidder Name
Skyline Airconditioning Engineers Pvt. Ltd.
Supertech Engineers
ANOOP REFRIGERATION
Voltas Limited
KRISHNA REFRIGERATION
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .