Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAdmitted-Finance BENARAS ROAD CHOWDHURY PARA KONA HOWRAH 711114 | HOWRAH | HOWRAH | WEST BENGAL | 711114 | ₹10.5 L | L1 | Admitted-Finance |
| 2 | L2₹10.6 L+₹2,550 (0.24%)Admitted-Finance 8A MAHIM HALDER STREET KOLKATA 700026 | KOLKATA | KOLKATA | WEST BENGAL | 700026 | ₹10.6 L+₹2,550 (0.24%) | L2 | Admitted-Finance |
| 3 | L3₹10.6 L+₹3,501 (0.33%)Admitted-Finance 7G CORNFIELD ROAD KOLKATA 700019 | KOLKATA | KOLKATA | WEST BENGAL | 700019 | ₹10.6 L+₹3,501 (0.33%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | CONCORD ENGINEERING L3 | PADMA ENGINEERING CO. L1 | SAIKAT ENTERPRISE L2 |
|---|---|---|---|---|---|---|
| 1.00Labour charges for 1 [one] No operating personnel for operation and guarding of Pump / Valve / Disinfection arrangement with all accessories. W.E.F 01.10.2026 to 30.09.2027 | ||||||
| 1.01 | Augmentation of Asuti - I/II & Chatta GP (Sakharipota) PH-1 | 365 | Days | 687 ₹2,50,755 | 684 ₹2,49,660 Lowest | 686 ₹2,50,390 |
| 1.02 | Augmentation of Asuti - I/II & Chatta GP (Beside Asuti-I GP) PH-2 | 365 | Days | 687 ₹2,50,755 | 684 ₹2,49,660 Lowest | 686 ₹2,50,390 |
| 1.03 | Augmentation of Asuti - I/II & Chatta GP (Beside Chatta GP) PH-3 | 365 | Days | 687 ₹2,50,755 | 684 ₹2,49,660 Lowest | 686 ₹2,50,390 |
| 2.00PART-B Supervision charges for whole electrical installation by licensed electrician as per IE Rules 1956 read with latest amendments overhead expenditures. | ||||||
| 2.01 | Augmentation of Asuti - I/II & Chatta GP (Sakharipota) PH-1 | 12 | Months | 8,436 ₹1,01,232 | 8,430 ₹1,01,160 Lowest | 8,440 ₹1,01,280 |
| 2.02 | Augmentation of Asuti - I/II & Chatta GP (Beside Asuti-I GP) PH-2 | 12 | Months | 8,436 ₹1,01,232 | 8,430 ₹1,01,160 Lowest | 8,440 ₹1,01,280 |
| 2.03 | Augmentation of Asuti - I/II & Chatta GP (Beside Chatta GP) PH-3 | 12 | Months | 8,436 ₹1,01,232 | 8,430 ₹1,01,160 Lowest | 8,440 ₹1,01,280 |
| 3.00N.B:- 1. Quoted rate should be inclusive of ESI, PF as per latest amendment and also comply with the Notification no.- 06/STAT/12RW/03/2023/LCS, dt. 02/04/2025 of the office the Labour Commissioner, Govt of W.B. & Reference Memo No- PHE/1095/O-5/16 (Pt) Dated- 22-05-2025 of the Deputy Secretary to the Govt. of West Bengal 2. GST exempted related to Article 243G/243W of the Constitution of India and CGST Rate Notification No. 12/2017-Central Tax (Rate) and corresponding WBGST Rate Notification No. 1136-FT, both dated 28.06.2017, as amended from time to time. 3. The rates are exclusive of Cess. | ||||||
Tender Value
Refer Docs
EMD Value
₹21,700
Closing Date
19 Aug 2026, 2:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla
Operation and guarding of the electric operated auto/ manual control pumping machinery at Augmentation of Asuti I/II and Chatta GP water supply scheme of Thakurpukur Maheshtala Block under South 24pgs Mechanical Division, PHE Dte.
2026_PHED_1035218_3
WBPHE/EE/SMD/NIeT-17 of 2026-27
Open Tender
Electrical Work/ Equipment
Item Rate
365 days
Canning-I Block
Please refer Tender documents.
6 documents required · 6 mandatory
₹21,700
2 Sept 2026
30 Jul 2026
21 Aug 2026
30 Jul 2026
19 Aug 2026
30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour charges for 1 [one] No operating personnel for operation and guarding of Pump / Valve / Disinfection arrangement with all accessories. W.E.F 01.10.2026 to 30.09.2027 | |||||
| 1.01 | Augmentation of Asuti - I/II & Chatta GP (Sakharipota) PH-1 | - | Days | - | - |
| 1.02 | Augmentation of Asuti - I/II & Chatta GP (Beside Asuti-I GP) PH-2 | - | Days | - | - |
| 1.03 | Augmentation of Asuti - I/II & Chatta GP (Beside Chatta GP) PH-3 | - | Days | - | - |
| 2PART-B Supervision charges for whole electrical installation by licensed electrician as per IE Rules 1956 read with latest amendments overhead expenditures. | |||||
| 2.01 | Augmentation of Asuti - I/II & Chatta GP (Sakharipota) PH-1 | - | Months | - | - |
| 2.02 | Augmentation of Asuti - I/II & Chatta GP (Beside Asuti-I GP) PH-2 | - | Months | - | - |
| 2.03 | Augmentation of Asuti - I/II & Chatta GP (Beside Chatta GP) PH-3 | - | Months | - | - |
| 3N.B:- 1. Quoted rate should be inclusive of ESI, PF as per latest amendment and also comply with the Notification no.- 06/STAT/12RW/03/2023/LCS, dt. 02/04/2025 of the office the Labour Commissioner, Govt of W.B. & Reference Memo No- PHE/1095/O-5/16 (Pt) Dated- 22-05-2025 of the Deputy Secretary to the Govt. of West Bengal 2. GST exempted related to Article 243G/243W of the Constitution of India and CGST Rate Notification No. 12/2017-Central Tax (Rate) and corresponding WBGST Rate Notification No. 1136-FT, both dated 28.06.2017, as amended from time to time. 3. The rates are exclusive of Cess. | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 0.23 MB
TCElec.pdf
Tender Documents • 0.21 MB
BOQ_2542890.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .