Loading
Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
7 Apr 2023, 3:00 pmClosed
PR & CC
This Public tender is floated for supply, laying and fabrication of pipeline jobs at Leh Depot. For further
22000279-HD-11100
22000279-HD-11100
Open Tender
Leh Ladakh, Ladakh
₹0
₹2 L
7 Apr 2023
16 Mar 2023
7 Apr 2023
7 Apr 2023
17 Mar 2023 - 30 Mar 2023
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | PIPE,CS,SMLS,100MM | PIPE,CS,SMLS,100MM — PIPE; MATERIAL:CARBON STEEL; MATERIAL SPEC:ASTM A333 GRADE 6; LINING SPEC:LOW TEMPERATURE; DIMENSIONAL SPEC:ANSI B36.10M/19M; MANUFACTURING PROCESS:SEAMLESS; SIZE (NB):100 MM; END PREPARATION:BEVELLED END; DIMENSION:114.3 MM; SCHEDULE NUMBER:STD; WALL THICKNESS:6.02 MM; CAPS CODE:PI24617Z51318ZZZZ | - | Meters |
| 2 | PIPE,CS,SMLS,150MM | PIPE,CS,SMLS,150MM — PIPE; MATERIAL:CARBON STEEL; MATERIAL SPEC:ASTM A333 GRADE 6; DIMENSIONAL SPEC:ANSI B36.10M; MANUFACTURING PROCESS:SEAMLESS; SIZE (NB):150 MM; END PREPARATION:BEVELLED END; SCHEDULE NUMBER:40; CAPS CODE:PI24617Z01504ZZZZ | - | Meters |
| 3 | PIPE,CS,SMLS,200MM | PIPE,CS,SMLS,200MM — PIPE; MATERIAL:CARBON STEEL; MATERIAL SPEC:ASTM A333 GRADE 6; LINING:42.55 KG/M; LINING SPEC:LOW TEMPERATURE; DIMENSIONAL SPEC:ANSI B36.10M/19M; MANUFACTURING PROCESS:SEAMLESS; SIZE (NB):200 MM; END PREPARATION:BEVELLED END; DIMENSION:219.1 MM; SCHEDULE NUMBER:STD; WALL THICKNESS:8.18 MM; CAPS CODE:PI24617Z51618ZZZZ | - | Meters |
| 4 | LAYING OF PIPE 100 mm | LAYING OF PIPE 100 mm — LAYING OF ABOVE GROUND PRODUCT 100 MM DIA PIPELINE, LAYING, INSTALLATION, FABRICATION, WELDING (WITH 10% RADIOGRAPHY WITH G RAYS) AND MAGNETIC PARTICLE TEST LIQUID PENETRATION TEST AS EIC INSTRUCTION, PIPELINES AND PLACING ON THE PEDESTALS, GANTRY STRUCTURES, STRUCTURAL BRIDGES/CATWALKS INCLUDING WELDING OF PIPES, BENDS, REDUCERS, PIPELINE FITTINGS ETC., RADIOGRAPHY TEST OF 10% JOINTS, CARRYING OUT REPAIRS IF ANY AND RE-RADIOGRAPHY, PRE-TESTING, HOOK-UP WITH THE PIPELINE ON EITHER END, HYDRO-TESTING OF ENTIRE SECTION OF PIPES, INCLUDING SUPPLY OF ALL TOOLS, TACKLES, MACHINERY, EQUIPMENTS, INSTRUMENTS, MANPOWER ETC. THE SCOPE THE JOB INCLUDES BUT NOT LIMITED TO THE FOLLOWING: RE HANDLING SUPPLIED MATERIALS, HAULING/LOADING, TRANSPORTATION TO WORK SITE, UNLOADING AND STRINGING.CUTTING, BEVELLING, GRINDING, EDGE PREPARATION (INCLUDING ANY ADDITIONAL CUTTING, BEVELLING, GRINDING REQUIRED FOR PERFECT FIT UP, BETWEEN THE EDGES OF THE PIPES, BENDS ETC), ALIGNING, FIT-UP, WELDING OF PIPES AS PER APPROVED TECHNICAL SPECIFICATIONS.ROOT RUN SHALL BE WITH E-6010 ELECTRODE AND INTERMEDIATE AND FINISHED WELDING SHALL BE WITH E-7018 ELECTRODES OF ESAB OR APPROVED EQUIVALENT.THE JOB ALSO INCLUDES FABRICATION OF ANY BENDS, TEES ECCENTRIC OR CONCENTRIC REDUCERS OTHER THAN THE ONES SUPPLIED BY HPCL OR IN THE SCOPE OF THE CONTRACTOR.NOTE:IF LEAKAGE THROUGH THE PIPE SEAM JOINT IS OBSERVED, CONTRACTOR SHALL REMOVE THE DEFECTIVE PORTION OF THE PIPELINE AND REPLACE WITH A NEW SUPPLIED PIPE AND RETEST IT. THE REPLACED PORTION OF THE PIPELINE WILL NOT BE PAID EXTRA.LENGTH OF ALL PIPELINES SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF THE FLANGE, VALVES SHALL NOT BE MEASURED. | - | Meters |
| 5 | LAYING OF PIPE 150 mm | LAYING OF PIPE 150 mm — LAYING OF ABOVE GROUND PRODUCT 150 MM DIA PIPELINE, LAYING, INSTALLATION, FABRICATION, WELDING (WITH 10% RADIOGRAPHY WITH G– RAYS) AND MAGNETIC PARTICLE TEST LIQUID PENETRATION TEST AS EIC INSTRUCTION, PIPELINES AND PLACING ON THE PEDESTALS, GANTRY STRUCTURES, STRUCTURAL BRIDGES/CATWALKS INCLUDING WELDING OF PIPES, BENDS, REDUCERS, PIPELINE FITTINGS ETC., RADIOGRAPHY TEST OF 10% JOINTS, CARRYING OUT REPAIRS IF ANY AND RE-RADIOGRAPHY, PRE-TESTING, HOOK-UP WITH THE PIPELINE ON EITHER END, HYDRO-TESTING OF ENTIRE SECTION OF PIPES, INCLUDING SUPPLY OF ALL TOOLS, TACKLES, MACHINERY, EQUIPMENTS, INSTRUMENTS, MANPOWER ETC. THE SCOPE THE JOB INCLUDES BUT NOT LIMITED TO THE FOLLOWING: RE HANDLING SUPPLIED MATERIALS, HAULING/LOADING, TRANSPORTATION TO WORK SITE, UNLOADING AND STRINGING.CUTTING, BEVELLING, GRINDING, EDGE PREPARATION (INCLUDING ANY ADDITIONAL CUTTING, BEVELLING, GRINDING REQUIRED FOR PERFECT FIT UP, BETWEEN THE EDGES OF THE PIPES, BENDS ETC), ALIGNING, FIT-UP, WELDING OF PIPES AS PER APPROVED TECHNICAL SPECIFICATIONS.ROOT RUN SHALL BE WITH E-6010 ELECTRODE AND INTERMEDIATE AND FINISHED WELDING SHALL BE WITH E-7018 ELECTRODES OF ESAB OR APPROVED EQUIVALENT.THE JOB ALSO INCLUDES FABRICATION OF ANY BENDS, TEES ECCENTRIC OR CONCENTRIC REDUCERS OTHER THAN THE ONES SUPPLIED BY HPCL OR IN THE SCOPE OF THE CONTRACTOR.NOTE:IF LEAKAGE THROUGH THE PIPE SEAM JOINT IS OBSERVED, CONTRACTOR SHALL REMOVE THE DEFECTIVE PORTION OF THE PIPELINE AND REPLACE WITH A NEW SUPPLIED PIPE AND RETEST IT. THE REPLACED PORTION OF THE PIPELINE WILL NOT BE PAID EXTRA.LENGTH OF ALL PIPELINES SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF THE FLANGE, VALVES SHALL NOT BE MEASURED. | - | Meters |
| 6 | LAYING OF PIPE 200 mm | LAYING OF PIPE 200 mm — LAYING OF ABOVE GROUND PRODUCT 200 MM DIA PIPELINE, LAYING, INSTALLATION, FABRICATION, WELDING (WITH 10% RADIOGRAPHY WITH G– RAYS) AND MAGNETIC PARTICLE TEST LIQUID PENETRATION TEST AS EIC INSTRUCTION, PIPELINES AND PLACING ON THE PEDESTALS, GANTRY STRUCTURES, STRUCTURAL BRIDGES/CATWALKS INCLUDING WELDING OF PIPES, BENDS, REDUCERS, PIPELINE FITTINGS ETC., RADIOGRAPHY TEST OF 10% JOINTS, CARRYING OUT REPAIRS IF ANY AND RE-RADIOGRAPHY, PRE-TESTING, HOOK-UP WITH THE PIPELINE ON EITHER END, HYDRO-TESTING OF ENTIRE SECTION OF PIPES, INCLUDING SUPPLY OF ALL TOOLS, TACKLES,MACHINERY, EQUIPMENTS, INSTRUMENTS, MANPOWER ETC. THE SCOPE THE JOB INCLUDES BUT NOT LIMITED TO THE FOLLOWING: RE HANDLING SUPPLIED MATERIALS, HAULING/LOADING, TRANSPORTATION TO WORK SITE, UNLOADING AND STRINGING.CUTTING, BEVELLING, GRINDING, EDGE PREPARATION (INCLUDING ANY ADDITIONAL CUTTING, BEVELLING, GRINDING REQUIRED FOR PERFECT FIT UP, BETWEEN THE EDGES OF THE PIPES, BENDS ETC), ALIGNING, FIT-UP, WELDING OF PIPES AS PER APPROVED TECHNICAL SPECIFICATIONS.ROOT RUN SHALL BE WITH E-6010 ELECTRODE AND INTERMEDIATE AND FINISHED WELDING SHALL BE WITH E-7018 ELECTRODES OF ESAB OR APPROVED EQUIVALENT.THE JOB ALSO INCLUDES FABRICATION OF ANY BENDS, TEES ECCENTRIC OR CONCENTRIC REDUCERS OTHER THAN THE ONES SUPPLIED BY HPCL OR IN THE SCOPE OF THE CONTRACTOR.NOTE:IF LEAKAGE THROUGH THE PIPE SEAM JOINT IS OBSERVED, CONTRACTOR SHALL REMOVE THE DEFECTIVE PORTION OF THE PIPELINE AND REPLACE WITH A NEW SUPPLIED PIPE AND RETEST IT. THE REPLACED PORTION OF THE PIPELINE WILL NOT BE PAID EXTRA.LENGTH OF ALL PIPELINES SHALL BE MEASURED UP TO THE NECK OF THE FLANGE ONLY. LENGTH OF THE FLANGE, VALVES SHALL NOT BE MEASURED. | - | Meters |
| 7 | BLASTING AND PAINTING 100 | BLASTING AND PAINTING 100 — DIA 100 MMSURFACE CLEANING AND PAINTING, COPPER SLAG BLASTING PU PAINTING, PREPARATION OF EXTERNAL SURFACES OF PIPELINES BY COPPER SLAG BLASTING THOROUGHLY TO SA 2.5 OF SWEDISH IVONSK STANDARD SIS:055900 LATEST EDITION TO BARE METAL TO ENSURE THOROUGH CLEANING OF THE SURFACES TO RECEIVE PAINTS AS PER SPECIFICATIONS. JOB INCLUDES RECEIPT FROM HPCL STORES, LOADING, HAULING, HANDLING, TRANSPORTATION OF THE PIPES. THE SURFACE PREPARATION TO SA. 2.5 SHALL BE DULY APPROVED BY ENGINEER IN CHARGE BEFORE COMMENCEMENT OF PAINTING. JOB INCLUDES APPLICATION OF PU PAINT TO ACHIEVE SPECIFIED MICRON PAINT THICKNESS .PAINT SHALL BE APPLIED WITHIN 4 HOURS OF SURFACE, THE DECISION OF ENGINEER IN CHARGE IN THIS REGARD IS FINAL. FOR PU PAINT REFER DETAIL ATTACHED.NOTE: CONTRACTOR TO ARRANGE AND KEEP AT SITE THE RELEVANT SWEDISH PHOTOGRAPHIC STANDARDS/CALIBRATED PROFILE GAUGE/CALIBRATED ELCOMETER/PROFILE SURFACES/SURFACE FILMS FOR INSPECTION BY HPCL SITE IN CHARGE FAILING WHICH PERMISSION TO PROCEED WITH THE WORK WILL NOT BE GRANTED. IF THE COATING IS DAMAGED WHILE HANDLING THE PIPES THE SAME NEED TO BE REDONE AS PER ABOVE AND MAKE GOOD OF THE SURFACE. EXECUTION OF THE JOB AS PER ATTACHED TECHNICAL SPECIFICATIONS AND AS DIRECTED BY HPCL EIC. | - | Meters |
| 8 | BLASTING AND PAINTING 150 | BLASTING AND PAINTING 150 — DIA 150 MMSURFACE CLEANING AND PAINTING, COPPER SLAG BLASTING PU PAINTING, PREPARATION OF EXTERNAL SURFACES OF PIPELINES BY COPPER SLAG BLASTING THOROUGHLY TO SA 2.5 OF SWEDISH IVONSK STANDARD SIS:055900 LATEST EDITION TO BARE METAL TO ENSURE THOROUGH CLEANING OF THE SURFACES TO RECEIVE PAINTS AS PER SPECIFICATIONS. JOB INCLUDES RECEIPT FROM HPCL STORES, LOADING, HAULING, HANDLING, TRANSPORTATION OF THE PIPES. THE SURFACE PREPARATION TO SA. 2.5 SHALL BE DULY APPROVED BY ENGINEER IN CHARGE BEFORE COMMENCEMENT OF PAINTING. JOB INCLUDES APPLICATION OF PU PAINT TO ACHIEVE SPECIFIED MICRON PAINT THICKNESS. PAINT SHALL BE APPLIED WITHIN 4 HOURS OF SURFACE, THE DECISION OF ENGINEER IN CHARGE IN THIS REGARD IS FINAL. FOR PU PAINT REFER DETAIL ATTACHED.NOTE: CONTRACTOR TO ARRANGE AND KEEP AT SITE THE RELEVANT SWEDISH PHOTOGRAPHIC STANDARDS/CALIBRATED PROFILE GAUGE/CALIBRATED ELCOMETER/PROFILE SURFACES/SURFACE FILMS FOR INSPECTION BY HPCL SITE IN CHARGE FAILING WHICH PERMISSION TO PROCEED WITH THE WORK WILL NOT BE GRANTED. IF THE COATING IS DAMAGED WHILE HANDLING THE PIPES THE SAME NEED TO BE REDONE AS PER ABOVE AND MAKE GOOD OF THE SURFACE. EXECUTION OF THE JOB AS PER ATTACHED TECHNICAL SPECIFICATIONS AND AS DIRECTED BY HPCL EIC. | - | Meters |
| 9 | BLASTING AND PAINTING 200 | BLASTING AND PAINTING 200 — DIA 200 MMSURFACE CLEANING AND PAINTING, COPPER SLAG BLASTING PU PAINTING, PREPARATION OF EXTERNAL SURFACES OF PIPELINES BY COPPER SLAG BLASTING THOROUGHLY TO SA 2.5 OF SWEDISH IVONSK STANDARD SIS:055900 LATEST EDITION TO BARE METAL TO ENSURE THOROUGH CLEANING OF THE SURFACES TO RECEIVE PAINTS AS PER SPECIFICATIONS. JOB INCLUDES RECEIPT FROM HPCL STORES, LOADING, HAULING, HANDLING, TRANSPORTATION OF THE PIPES. THE SURFACE PREPARATION TO SA. 2.5 SHALL BE DULY APPROVED BY ENGINEER IN CHARGE BEFORE COMMENCEMENT OF PAINTING. JOB INCLUDES APPLICATION OF PU PAINT TO ACHIEVE SPECIFIED MICRON PAINT THICKNESS .PAINT SHALL BE APPLIED WITHIN 4 HOURS OF SURFACE, THE DECISION OF ENGINEER IN CHARGE IN THIS REGARD IS FINAL. FOR PU PAINT REFER DETAIL ATTACHED.NOTE: CONTRACTOR TO ARRANGE AND KEEP AT SITE THE RELEVANT SWEDISH PHOTOGRAPHIC STANDARDS/CALIBRATED PROFILE GAUGE/CALIBRATED ELCOMETER/PROFILE SURFACES/SURFACE FILMS FOR INSPECTION BY HPCL SITE IN CHARGE FAILING WHICH PERMISSION TO PROCEED WITH THE WORK WILL NOT BE GRANTED. IF THE COATING IS DAMAGED WHILE HANDLING THE PIPES THE SAME NEED TO BE REDONE AS PER ABOVE AND MAKE GOOD OF THE SURFACE. EXECUTION OF THE JOB AS PER ATTACHED TECHNICAL SPECIFICATIONS AND AS DIRECTED BY HPCL EIC. | - | Meters |
| 10 | Blind 100MM | Blind 100MM — FLANGE,BLIND; MATERIAL SPEC:ASTM A350 GRADE LF2 CLASS 1; MATERIAL:CARBON STEEL; FACING,FLANGE:RAISED FACE; FINISH,FLANGE FACING:125 AARH; PRESSURE DESIGNATION:CLASS 150; SIZE:100 MM; DESIGN SPEC:ANSI B16.5; SERVICE:LOW TEMPERATURE; CAPS CODE:FBCD727Z513ZZZZZZ | - | Each |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
22000279-HD-11100.pdf
TENDER_DOCUMENT • 22.63 MB
Download all tender documents and submit your bid