Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC AT KHUDGADDA NEW BASTI SAWANG BOKARO JHARKHAND 829128 | BOKARO | BOKARO | JHARKHAND | 829128 | L1 | Accepted-AOC All documents submitted and found O.K. Comparative lower rate. | |
| 2 | Rejected-Technical AT WASHERY ROAD KATHARA BOKARO JHARKHAND 829116 | KATHARA | BOKARO | JHARKHAND | 829116 | - | Rejected-Technical Technically verified and found not O.K. | |
| 3 | Rejected-Technical AT KATHARA P O KATHARA BOKARO JHARKHAND 829116 | BOKARO | BOKARO | JHARKHAND | 829116 | - | Rejected-Technical Technically verified and found not O.K. |
Tender Value
₹2.3 L
EMD Value
₹3,000
Closing Date
7 Nov 2024, 11:00 amClosed
Amit,Dy. Manager(CP), Sawang Washery, Kathara Area
Office of the Project Officer, Sawang Washery
Complete repairing / reconditioning of 3.3KV OCB switch, 400Amp, Make-Rerolled Burn, S/N-WNP installed at Main substation for controlling of plant 3.3KV grade capacitor bank and 11KV OCB switch, 400Amp, Make-GEC, S/N-SGW-1 both installed at Main Subs
2024_CCL_319974_1
SGW/KTA/ENM/E-Tender/24-25/67 Date 26.10.2024
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Office of the Project Officer, Sawang Washery
Please refer Tender documents.
9 documents required · 9 mandatory
₹3,000
6 Jan 2025
26 Oct 2024
9 Nov 2024
28 Oct 2024
7 Nov 2024
28 Oct 2024
28 Oct 2024 - 4 Nov 2024
Amount
A. Complete repairing / reconditioning of 3.3kKV OCB switch, 400Amp, Make-Rerolled Burn, S/N-WNP installed at Main Substation for controlling of plant 3.3KV grade capacitor bank and 11KV OCB switch, 400Amp, Make-GEC, S/N-SGW-1 installed at Main substation for primary control of 3MVA transformer of plant power supply of Sawang Washery. Repairing / rectification of control circuit wiring including some materials as ferrule, lugs, clip, socket etc.
Repairing and setting of operating mechanism including some materials as clair pin lock washer, shaft etc.
Supply of earth leakage relay (Make Prayog)
Supply and providing of main fixed contact
Supply and providing of main moving contact
Supply of glass separator
Supply and providing of complete gas kit, changing in oil tank, cover joints, insulator fixing point and other required
Supply of Digital Ampere Meter 4"
Supply of Digital Voltmeter 4"
Supply of Auxiliary switch
Complete circuit assembling, commissioning, testing
Supply of shunt trip coil 110V DC
Supply of mechanical catch
Supply of diode bridge rectifier unit 110V
B. Cable laying for capacitor bank output power supply i) Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 11KV grade of following size in the existing masonry open duct above 120 sq.mm. and upto 400 sq.mm.
Providing and fixing of copper lugs 185 sq.mm.
Commissioning and testing of capacitor bank
Total impact of GST for the purpose of CTC
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .