| 1 | 1₹1.8 CrAccepted-AOC GUPTA AGROTECH 1ST FLOOR SAFIDON ROAD NEAR KUNDAN CINEMA JIND | JIND | JIND | HARYANA | ₹1.8 Cr | 1 | Accepted-AOC Reasonable rate |
| 2 | 2₹2.0 Cr+₹22.2 L (12.3%)Rejected-AOC VPO PATUWAS TEHSIL AND DISTT CHARKHI DADRI 127306 | CHARKI DADRI | HARYANA | 127306 | ₹2.0 Cr+₹22.2 L (12.3%) | 2 | Rejected-AOC Higher rates |
| 3 | 3₹2.1 Cr+₹26.8 L (14.8%)Rejected-AOC 2974 URBAN ESTATE JIND 126102 | JIND | JIND | HARYANA | 126102 | ₹2.1 Cr+₹26.8 L (14.8%) | 3 | Rejected-AOC Higher rates |
| 4 | 4₹2.2 Cr+₹34.8 L (19.2%)Rejected-AOC | ₹2.2 Cr+₹34.8 L (19.2%) | 4 | Rejected-AOC Higher rates |
| 5 | Not Admitted-Technical | - | - | Not Admitted-Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | RAMPHAL PHOGAT CONT L4 | AMARJEET SANWAL CONT L2 | PARAMJEET CONTRACTOR L3 | SAHYOG ENTERPRISES AND BUILDERS L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | COPPER CABLE: Supply, erection, testing and commissioning of IS marked 3 core Copper Cables, Solid Copper conductor up to 6sqmm and balance Stranded Copper, XLPE Insulated, cores laid up, PVC Inner sheathed, Armoured (Glavanised wire for cables up to 10x1.5sqmm, 8x2.5sqmm, 2x10sqmm, 3x10sqmm, 4x6sqmm and balance all galvanized steel strip), extruded PVC type ST2 Outer Sheathed, /1100 V grade as per IS 7098 (Part 1) 1988 with up to date amendments along with all accessories like thimble lugs etc for motors as per entire satisfaction of Engineer-in-charge complete in all respect. Make:Finolex / Havells / RR Cables. (16 Sqmm size) | 120 | Per Metre | 2,000 ₹2,40,000 | 1,500 ₹1,80,000 | 1,470 ₹1,76,400 | 500 ₹60,000 Lowest |
| 2.00 | Providing, fixing, lointing, testing of Mechanical joints complete with rubber gaskit, Galvanized nuts and bolts including labor, tranportaion ets up to the site
100 mm nominal diameter | 8 | NO. | 700 ₹5,600 | 500 ₹4,000 Lowest | 2,000 ₹16,000 | 500 ₹4,000 Lowest |
| 3.00 | `RAW WATER PUMP: Supplying, erection, testing and commissioning of Horizontal motor pumping set for Raw water having head as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked ` 500 LPM x 12 m head | 2 | Each | 1,50,000 ₹3,00,000 | 1,00,000 ₹2,00,000 | 60,000 ₹1,20,000 Lowest | 1,00,000 ₹2,00,000 |
| 4.00 | Operation and maintenance of all the proposed structure of both water works and completes cope of the work taken in DNIT(disinfection material supplied by the agency) and complete existing distribution system of the schemes (as per schedule–IV) for a period 5year after 12 Month defect liability period after 3 months trial run period (will be changed to the A/mtc estimate) Operation and maintenance during defect liability period after 3 month trial run period(operation only) | 1 | Job | 4,00,000 ₹4,00,000 | 3,00,000 ₹3,00,000 Lowest | 4,50,000 ₹4,50,000 | 4,00,000 ₹4,00,000 |
| 5.00 | 1st year Operation and maintenance after defect liability period | 1 | Job | 4,00,000 ₹4,00,000 | 3,00,000 ₹3,00,000 Lowest | 4,50,000 ₹4,50,000 | 4,00,000 ₹4,00,000 |
| 6.00 | 2nd year Operation and maintenance after defect liability period | 1 | Job | 4,00,000 ₹4,00,000 | 3,00,000 ₹3,00,000 Lowest | 4,50,000 ₹4,50,000 | 4,00,000 ₹4,00,000 |
| 7.00 | 3rd year Operation and maintenance after defect liability period | 1 | Job | 4,00,000 ₹4,00,000 | 3,00,000 ₹3,00,000 Lowest | 4,50,000 ₹4,50,000 | 4,00,000 ₹4,00,000 |
| 8.00 | 4th year Operation and maintenance after defect liability period | 1 | Job | 4,00,000 ₹4,00,000 | 3,00,000 ₹3,00,000 Lowest | 4,50,000 ₹4,50,000 | 4,00,000 ₹4,00,000 |
| 9.00 | 5th year Operation and maintenance after defect liability period | 1 | Job | 4,00,000 ₹4,00,000 | 3,00,000 ₹3,00,000 Lowest | 4,50,000 ₹4,50,000 | 4,50,000 ₹4,50,000 |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
19 May 2026, 3:00 pmClosed
BHANU PARKASH SHARMA
Jind PHED No. 1
JITGARH ESTIMATE FOR CONSTRUCTION OF INDEPENDENT CANAL BASED WATER WORKS AND LAYING THE DI PIPE LINES IN VILLAGE JITGARH DISTRICT JIND.
2026_HRY_520534_1
20267F53028A 1567 424E A331 FAD758A09CD3568PUH
Open Tender
Civil Works
Works
450 days
JITGARH
4 documents required · 4 mandatory
₹15,000
₹3.6 L
Yes
16 Sept 2026
8 May 2026
19 May 2026
8 May 2026
19 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | COPPER CABLE: Supply, erection, testing and commissioning of IS marked 3 core Copper Cables, Solid Copper conductor up to 6sqmm and balance Stranded Copper, XLPE Insulated, cores laid up, PVC Inner sheathed, Armoured (Glavanised wire for cables up to 10x1.5sqmm, 8x2.5sqmm, 2x10sqmm, 3x10sqmm, 4x6sqmm and balance all galvanized steel strip), extruded PVC type ST2 Outer Sheathed, /1100 V grade as per IS 7098 (Part 1) 1988 with up to date amendments along with all accessories like thimble lugs etc for motors as per entire satisfaction of Engineer-in-charge complete in all respect. Make:Finolex / Havells / RR Cables. (16 Sqmm size) | 120 | Per Metre | - | - |
| 2 | Providing, fixing, lointing, testing of Mechanical joints complete with rubber gaskit, Galvanized nuts and bolts including labor, tranportaion ets up to the site
100 mm nominal diameter | 8 | NO. | - | - |
| 3 | `RAW WATER PUMP: Supplying, erection, testing and commissioning of Horizontal motor pumping set for Raw water having head as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked ` 500 LPM x 12 m head | 2 | Each | - | - |
| 4 | Operation and maintenance of all the proposed structure of both water works and completes cope of the work taken in DNIT(disinfection material supplied by the agency) and complete existing distribution system of the schemes (as per schedule–IV) for a period 5year after 12 Month defect liability period after 3 months trial run period (will be changed to the A/mtc estimate) Operation and maintenance during defect liability period after 3 month trial run period(operation only) | 1 | Job | - | - |
| 5 | 1st year Operation and maintenance after defect liability period | 1 | Job | - | - |
| 6 | 2nd year Operation and maintenance after defect liability period | 1 | Job | - | - |
| 7 | 3rd year Operation and maintenance after defect liability period | 1 | Job | - | - |
| 8 | 4th year Operation and maintenance after defect liability period | 1 | Job | - | - |
| 9 | 5th year Operation and maintenance after defect liability period | 1 | Job | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_599431.xls
BOQ • 0.30 MB
1F4BOQZ154564.pdf
Additional Documents • 1.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .