Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC | ₹2.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.1 CrRejected-Finance ADD EKAUNA BAIPAS DISTRICT SHRAWASTI | SHRAVASTI | UTTAR PRADESH | 271201 | ₹2.1 Cr | L2 | Rejected-Finance L2 |
Updated dates
Tender Value
₹2.1 Cr
EMD Value
₹12.4 L
Closing Date
30 Apr 2026, 12:00 pmClosed
SE GONDA CIRCLE PWD GONDA
SE GONDA CIRCLE PWD GONDA
Construction work for a 4 suite guest house within the Inspection House in Tulsipur Vidhansabha Distt Balrampur
2026_CEDPW_1135257_1
1224/2Com(B)/Gonda Circle/25-26 dt 13.3.26
Open Tender
Civil Works - Buildings
365 days
BALRAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,600
Yes
₹12.4 L
Yes
GONDA
8 Jun 2026
10 Apr 2026
30 Apr 2026
10 Apr 2026
30 Apr 2026
10 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
All kinds of soil | - | cum | - | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | - | cum | - | - |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | - | - |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | Cum | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | - | sqm | - | - |
| 8 | Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
| 9 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | sqm | - | - |
| 10 | Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.47 MB
BOQ_2119538.xls
BOQ • 0.63 MB
Download all tender documents and submit your bid