| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹53.6 LAccepted-AOC VILLAGE POST OFFICE KINOO TEHSIL RAMPUR DISTT SHIMLA H P | RAMPUR | SHIMLA | HIMACHAL PRADESH | 1 | Accepted-AOC 1st lowest | |
| 2 | 2₹54.6 L+₹52,029.60 (0.96%)Rejected-Finance V P O LABANA SADANA TEHSIL RAMPUR DISTT SHIMLA H P | LABANA SADANA | SHIMLA | HIMACHAL PRADESH | 2 | Rejected-Finance 2nd lowest |
Tender Value
₹52.0 L
EMD Value
₹1.0 L
Closing Date
7 Feb 2026, 9:00 amClosed
EE Rampur
EE B and R Division HPPWD Rampur
SH Formation cutting 5.7 mtr. Wide road, C.O R.wall at RD 0.000 to 0.020 and 0.000 to 0.012 of old HT road
2026_PWD_127036_1
PW/RMP/TA/2025-10739 dated 23.01.2026
Open Tender
Civil Works - Roads
Percentage
EE B and R Division HPPWD Rampur
Please refer Tender documents.
13 documents required · 13 mandatory
₹2,000
Yes
₹1.0 L
Yes
22 Mar 2026
1 Feb 2026
7 Feb 2026
1 Feb 2026
7 Feb 2026
1 Feb 2026
1 Feb 2026 - 7 Feb 2026
Excavation in earthwork in hilly area all heights and depths, in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hard rock. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution, etc. and to protect stability of hill side. Rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting/excavation, including rock excavation shall be carried out true to lines, grades, side slopes, width, camber, super-elevation and level as shown on the drawings or as directed by the Engineer-in-charge, in conformity with the requirement of technical specification clause 1603.1 & 1603.2 to achieve designed formation width including hauling and stacking of material useful for construction at suitable sites and safe disposal and dumping to be arranged by the contractor of unsuitable cut materials in specified manner , trimming, filling of unevenness, blindage and finishing of the road to specified dimensions or as directed by the Engineer-in charge for smooth riding. The recovery for useful stones, for 1968.94 cum. (One thousand nine hundred sixty eight point nine four) @ Rupees 300/= only (Rs. three hundred only) per cubic metre shall be effected on pro rata basis in all circumstances. Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases.
Excavation in Hill area by manual/mechanical means:- Excavation in soil in hill areas all heights and depth in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hardd rock all work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out rock( where blasting is prohibited) including cutting and trimming of side slopes and disposing of excavated earth with a lift upto all heights and all leads as directed by the Engineer-in-Charge, in conformately with the requirement of technical specification of rural roads clause 1603.1 all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Earth work in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all leads , dressing of sides and bottom and back filling in trenches with excavated suitable material in ordinary soil upto all depth. as directed by the Engineer-in-Charge.all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Providing and laying cement concrete 1:6:12 (1 cement:6 sand : 12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of centring and shuttering. . including all leads and lifts as per directions of Engineer in Charge.
P/L Cement concrete 1:4:8 ( one cement : four sand : eight graded stone aggregate twenty five millimeter nominal size)for plain/ reinforced concrete work in open foundation complete as per drawing and technical specification Clauses 802,803,1202& 1203.. including all leads and lifts as per directions of Engineer in Charge.
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 including all leads and lifts as per directions of Engineer in Charge. including all leads and lifts as per directions of Engineer in Charge.
Backfilling behind abutment, wing wall and return wall complete as per drawings and technical specification clause 1204.3.8 with granular material. including the cost of form work and hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge including hauling of material in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_187537.xls
BOQ • 2.10 MB
SBD.pdf
Tender Documents • 2.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .