| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.7 LAccepted-AOC GRAM BAMNAULI DISTRICT BAGHPAT | BAGHPAT | UTTAR PRADESH | ₹33.7 L | L1 | Accepted-AOC L1 Lowest bid Accepted and L2 Highest bid Rejected |
| 2 | L2₹34.0 LRejected-Finance | ₹34.0 L | L2 | Rejected-Finance L2 |
| 3 | L3₹38.8 LRejected-Finance GRAM TAMELAGARHI DISTRICT BAGHPAT | BAGHPAT | UTTAR PRADESH | ₹38.8 L | L3 | Rejected-Finance L3 |
| 4 | L4₹52.4 LRejected-Finance | ₹52.4 L | L4 | Rejected-Finance L4 |
| 5 | L5₹54.7 LRejected-Finance D 80 JANAKPURI SAHIBABAD DIST SHAZABAD | SONBHADRA | UTTAR PRADESH | 231207 | ₹54.7 L | L5 | Rejected-Finance L5 |
Tender Value
₹47.3 L
EMD Value
₹4.4 L
Closing Date
30 Apr 2026, 2:00 pmClosed
SE MEERUT CIRCLE PWD MEERUT
SE MEERUT CIRCLE PWD MEERUT
In the financial year 2025-26, work of New Construction of the link road from village Asara to Bhandeda (Up to District Shamli border) in district Baghpat.
2026_CEMRT_1141073_2
954/11Cashier-MC PD Baghpat Dt 19-03-26
Open Tender
Civil Works
180 days
EE PD PWD BAGHPAT
CLASS A,B,C
3 documents required · 3 mandatory
₹2,714
₹4.4 L
SE MEERUT CIRCLE PWD MEERUT
13 May 2026
24 Apr 2026
30 Apr 2026
24 Apr 2026
30 Apr 2026
24 Apr 2026
25 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Construciton of embankment with apporved material obtained from borrow pis with a lift upto 1.5m, transporting to site, spreading, grading to required slope and compacting to meet reqirement of Tables 300.1 and 300.2 with a lead upto 100 as per Technical Specification clause 301.5 Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge | - | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Construciton of subgrade and earthen shouldres with approved material obtained from borrow pits with all lifts and leads, tranporting to site, spreading, grading to required slpoe and compacted meet requirement of table 300.2 with lead upto 100m as per Technical specification clause 303.1. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge | - | Cum | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface., mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, as per MORD specification 401 Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge | - | Cum | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | Providing,laying and spreading material on a prepared sub cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and form a layer of base. Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge | - | Cum | - | - | BI01010001010000000000000515BI0100001116 |
| 5 | Brick lining on both side of the road of M-150 bricks 7 cm. wide. 11 cm. deep, laid with mud mortar including labour & supply of bricks finished to the required template and in proper alignment and also including dressing and ramming the excavated earth as directed by the Engineer-in-charge. SOR No. 765 Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge | - | Km | - | - | BI01010001010000000000000515BI0100001117 |
| 6 | Providing and applying tack coat with bitumen VG-10 grade using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surface treated with primer & cleaned with hydraulic broom as per Technical Specification Clause 503 Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge | - | sqm | - | - | BI01010001010000000000000515BI0100001119 |
| 7 | Providing and laying and rolling of open graded premix carpet by Manual Means of 20 mm thickness composed of 13.2 mm to 5.6 mm agregates using V.G.-10 grade bitumen bitumen to required line grade and level to serve as wearing course on previously prepared base by manual MORD specific ations 508 (excluding cost of labour cess & GST) Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge | - | sqm | - | - | BI01010001010000000000000515BI0100001120 |
| 8 | Providing and laying seal coat by manual means with 80/100 grade bitumen sealing the voids in bitumens surface laid to the specified levels grade and cross fall using type C as per Technical Specification Clause 510 (excluding cost of labour cess & GST) Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge | - | sqm | - | - | BI01010001010000000000000515BI0100001121 |
| 9 | Construction of 350mm Dai NP-3 Hume pipe culvert Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge | - | No. | - | - | BI01010001010000000000000515BI0100001122 |
| 10 | Providing and Fixing of Km. Stone and Fixing of Hecto meter stone Including supply of all Material Labour, T&P etc also including labour cess, royalty and all other applicable Taxes (But excluding GST) required for proper completion of work as per direction of Engineer-in-charge | - | Job | - | - | BI01010001010000000000000515BI0100001123 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
Tendernotice_2.pdf
PDF • 13.40 MB
BOQ_2130736.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid