Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹96,517.74Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹98,071.34+₹1,553.60 (1.61%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹97,100
EMD Value
₹1,942
Closing Date
19 Aug 2026, 6:00 pmClosed
Executive Engineer REW Doda
Office of the Executive Engineer REW Doda
Dev of Spring at Chabcha aasoli nallah Ward 6 Pyt Saddar Block Bhaderwah (PRIs Grant)
2026_RDPR_320021_29
e-NIT No 64 of REW Doda 2026-27 Dated.07.08.2026
Open Tender
Civil Works
Percentage
30 days
Doda
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹1,942
29 Aug 2026
11 Aug 2026
20 Aug 2026
11 Aug 2026
19 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 3.57 | Cum | 479.3 | ₹1,711.1 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1.73 | Cum | 6,591.25 | ₹11,402.86 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 10.22 | Sqm | 286.35 | ₹2,926.5 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for:Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 3.35 | Sqm | 628.95 | ₹2,106.98 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for:Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 117.78 | Kgs | 115.35 | ₹13,585.92 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | 0.34 | Cum | 7,275.35 | ₹2,473.62 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 0.34 | Cum | 4,826.5 | ₹1,641.01 |
| 0.0 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.50 mm thick with 20mm nominal size stone aggregate. | 2.35 | Sqm | 562.15 | ₹1,321.05 |
| 0.0 | 20mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) | 9.29 | Sqm | 390.05 | ₹3,623.56 |
| 0.0 | Carriage of Sand & Bajri | 18.44 | Cum | 2,972.22 | ₹54,807.74 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1062661.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .