Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.1 LAccepted-AOC SHOP NO 5 WARD NO 12 132041 | KARNAL | KARNAL | HARYANA | 132041 | ₹17.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹21.0 L+₹3.9 L (22.9%)Rejected-Finance | ₹21.0 L+₹3.9 L (22.9%) | L2 | Rejected-Finance Reject |
| 3 | L3₹22.1 L+₹5.0 L (29.2%)Rejected-Finance 29 RAILWAY ROAD WARD NO 9 TARAORI 132116 | TARAORI | KARNAL | HARYANA | 132116 | ₹22.1 L+₹5.0 L (29.2%) | L3 | Rejected-Finance Reject |
| 4 | L4₹23.2 L+₹6.0 L (35.3%)Rejected-Finance S O PREM KUMAR SUNDER NAGAR 132117 | KARNAL | HARYANA | 132117 | ₹23.2 L+₹6.0 L (35.3%) | L4 | Rejected-Finance Reject |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹21.1 L
EMD Value
₹42,000
Closing Date
4 Jul 2026, 5:00 pmClosed
BHANWAR SINGH
Municipal Committee Taraori
Const and Repair of Street and drain in Durga colony ward no. 08. only for society
2026_HRY_531841_1
202639EDD873 33D5 4E06 B4D7 B5E2C5FF56B2310ULB
Open Tender
Civil Works
Works
150 days
Taraori
Const and Repair of Street and drain in Durga colony ward no. 08
2 documents required · 2 mandatory
₹2,000
₹42,000
Yes
1 Aug 2026
26 Jun 2026
6 Jul 2026
26 Jun 2026
4 Jul 2026
26 Jun 2026
26 Jun 2026 - 28 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 8.08 | cum | 1,863 | ₹15,053.04 |
| 2 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | 36 | Sqm | 113 | ₹4,068 |
| 3 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 100 | Kg. | 83 | ₹8,300 |
| 4 | [17.13]Granular Sub-Base (Mix in place) Construction of granular sub-base by providing Material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H technical specifications [Through Rate] | 309.38 | cum | 1,094 | ₹3,38,461.72 |
| 5 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] | 2,250 | Sqm | 655 | ₹14,73,750 |
| 6 | [17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate] | 22.5 | Sqm | 26 | ₹585 |
| 7 | [17.71]Relaying of available (removed and stacked) Interlocking Paver Block Pavement having thickness 100mm/80 mm/ 60 mm (average = 80mm) as per drawings and Technical Specification Clause 1504 [Labour Rate] | 22.5 | Sqm | 38 | ₹855 |
| 8 | [22.93.6]Providing and filling sand envelope of grading zone IV or coarser grade,100mm all-round the G.I. pipes in external work : 6. 50 mm diameter pipe [Through Rate] | 24 | Metre | 66 | ₹1,584 |
| 9 | [4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. [Through Rate] | 600 | cum | 46 | ₹27,600 |
| 10 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] | 19.84 | cum | 3,476 | ₹68,963.84 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_610900.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .