| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.4 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹71.5 Cr+₹3.1 Cr (4.47%)Admitted-Finance BMS HOUSE MOTI TALAB PARA JAGDALPUR DIST BASTAR C G 494001 | JAGDALPUR | BASTAR | CHHATTISGARH | 494001 | L2 | Admitted-Finance | |
| 3 | L3₹71.8 Cr+₹3.4 Cr (4.93%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹73.0 Cr+₹4.6 Cr (6.65%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹75.0 Cr+₹6.6 Cr (9.65%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GANESH PRASAD KHETAN L1 | AmarInfrastructure Ltd L5 | BMS Projects L2 | M/s. B. B. VERMA L8 | PSAA CONSTRUCTIONS PRIVATE LIMITED L3 | JKA ASSOCIATES PVT LTD L6 | UTTAM KUMAR JAIN L4 | punia construction company L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | SITE CLEARANCE
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 17.61 | hect. | 45,795 ₹8,06,633 | 80,000 ₹14,09,120 | 47,200 ₹8,31,381 | 50,000 ₹8,80,700 | 90,984 ₹16,02,592 | 25,000 ₹4,40,350 | 20,000 ₹3,52,280 Lowest | 45,687 ₹8,04,731 |
| 2.00 | Compacting Original Ground Compacting original ground supporting embankment ( Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction.) as per clause 305.3.4. | 26,419.5 | Cum | 25 ₹6,60,488 Lowest | 50 ₹13,20,975 | 33 ₹8,71,844 | 25 ₹6,60,488 Lowest | 150 ₹39,62,925 | 60 ₹15,85,170 | 25 ₹6,60,488 Lowest | 76.67 ₹20,25,583 |
| 3.00 | EARTHWORK EXCAVATION
Excavation in Soil by Manual Means. (Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 meters as per relevant clauses of section 300). | 1,49,400 | cum. | 25 ₹37,35,000 Lowest | 180 ₹2,68,92,000 | 71 ₹1,06,07,400 | 155 ₹2,31,57,000 | 157 ₹2,34,55,800 | 120 ₹1,79,28,000 | 140 ₹2,09,16,000 | 205 ₹3,06,27,000 |
| 4.00 | Excavation in Ordinary Rock with Dozer with lead upto 1000 metres (Excavation for roadway in ordinary rock by deploying a dozer, including cutting and transporting the earth to site of embankment/dumping area with lead upto 1000 metres, trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections as per relevant clauses of section 300) | 1,98,000 | Cum | 35 ₹69,30,000 Lowest | 170 ₹3,36,60,000 | 425 ₹8,41,50,000 | 100 ₹1,98,00,000 | 250 ₹4,95,00,000 | 130 ₹2,57,40,000 | 85 ₹1,68,30,000 | 150 ₹2,97,00,000 |
| 5.00 | Material Deposited from Roadway Cutting
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material / selected soil having effective CBR > 5 ( unless specified otherwise in contract ) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2) as per clause 305. | 1,04,580 | cum. | 15 ₹15,68,700 Lowest | 80 ₹83,66,400 | 71 ₹74,25,180 | 50 ₹52,29,000 | 250 ₹2,61,45,000 | 80 ₹83,66,400 | 65 ₹67,97,700 | 69.7 ₹72,89,226 |
| 6.00 | EARTH FILLING
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material / selected soil having effective CBR > 5 ( unless specified otherwise in contract ) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2) as per clause 305. | 82,173.69 | cum. | 295 ₹2,42,41,239 | 326 ₹2,67,88,623 | 236 ₹1,93,92,991 | 175 ₹1,43,80,396 | 150 ₹1,23,26,054 Lowest | 200 ₹1,64,34,738 | 270 ₹2,21,86,897 | 200 ₹1,64,34,738 |
| 7.00 | SUB GRADE
Construction of Sub-grade with Material Obtained from Borrow Pits
(Construction of sub-grade with approved material / selected soil having effective CBR > 8 ( unless specified otherwise in contract ) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) as per clause 305. | 94,515.6 | cum | 295 ₹2,78,82,102 | 336 ₹3,17,57,242 | 295 ₹2,78,82,102 | 180 ₹1,70,12,808 Lowest | 250 ₹2,36,28,900 | 225 ₹2,12,66,010 | 270 ₹2,55,19,212 | 200 ₹1,89,03,120 |
| 8.00 | Granular Sub-base with Close Graded Material (Table:- 400-1)
Plant Mix Method with Mechanically crushed stone only(Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 )
iii GSB grading-III Material 1st layer | 14,737.85 | cum | 2,595 ₹3,82,44,721 | 2,196 ₹3,23,64,319 | 1,888 ₹2,78,25,061 | 2,950 ₹4,34,76,658 | 1,750 ₹2,57,91,238 | 1,900 ₹2,80,01,915 | 2,400 ₹3,53,70,840 | 1,512.09 ₹2,22,84,956 Lowest |
| 9.00 | vi GSB grading-VI Material 2 nd layer | 13,983.25 | cum | 2,595 ₹3,62,86,545 | 2,196 ₹3,07,07,226 | 1,829 ₹2,55,75,372 | 2,950 ₹4,12,50,600 | 1,750 ₹2,44,70,695 | 1,900 ₹2,65,68,183 | 2,400 ₹3,35,59,810 | 1,512.09 ₹2,11,43,939 Lowest |
| 10.00 | WMM Grade 250mm
Wet Mix Macadam / Interlocking layer laying using by Grader (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.) as per clause 406. | 32,380.33 | cum. | 2,795 ₹9,05,03,031 | 2,296 ₹7,43,45,245 | 2,006 ₹6,49,54,948 | 2,950 ₹9,55,21,983 | 1,860 ₹6,02,27,420 | 2,000 ₹6,47,60,666 | 2,450 ₹7,93,31,816 | 1,512.09 ₹4,89,61,978 Lowest |
Tender Value
₹90.0 Cr
EMD Value
₹90.0 L
Closing Date
21 Apr 2025, 5:30 pmClosed
Chief Engineer, PWD, NH Zone, Raipur
Office of the Chief Engineer, PWD, NH Zone, Pension Bada, Raipur (C.G.) 492001
Construction and Up gradation to Two-Four lane with paved shoulder In km 70.450 to 80.720 total 10.270 km Narayanpur - Kasturmeta - kutul Road of NH-130D (PART-I)
2025_MoRTH_853793_1
13/CE/NH/TC/ 44-43/2024 (2nd Call)
Open Tender
Civil Works - Highways
Item Rate
540 days
Kasturmeta
As per Tender Documents
9 documents required · 9 mandatory
₹11,800
Regional Pay and Account Officer, MoRTH, Raipur
₹90.0 L
Office of the Chief Engineer, PWD, NH Zone, Raipur
10 Jun 2025
20 Mar 2025
23 Apr 2025
20 Mar 2025
21 Apr 2025
20 Mar 2025
20 Mar 2025 - 1 Apr 2025
1 Apr 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SITE CLEARANCE
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 17.61 | hect. | 100 | ₹1,761.4 |
| 2 | Compacting Original Ground Compacting original ground supporting embankment ( Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction.) as per clause 305.3.4. | - | Cum | 100 | - |
| 3 | EARTHWORK EXCAVATION
Excavation in Soil by Manual Means. (Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 meters as per relevant clauses of section 300). | 1,49,400 | cum. | 100 | ₹1,49,40,000 |
| 4 | Excavation in Ordinary Rock with Dozer with lead upto 1000 metres (Excavation for roadway in ordinary rock by deploying a dozer, including cutting and transporting the earth to site of embankment/dumping area with lead upto 1000 metres, trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections as per relevant clauses of section 300) | 0.29 | Cum | 100 | ₹29 |
| 5 | Material Deposited from Roadway Cutting
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material / selected soil having effective CBR > 5 ( unless specified otherwise in contract ) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2) as per clause 305. | 1,04,580 | cum. | 100 | ₹1,04,58,000 |
| 6 | EARTH FILLING
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material / selected soil having effective CBR > 5 ( unless specified otherwise in contract ) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2) as per clause 305. | 82,173.69 | cum. | 100 | ₹82,17,369.1 |
| 7 | SUB GRADE
Construction of Sub-grade with Material Obtained from Borrow Pits
(Construction of sub-grade with approved material / selected soil having effective CBR > 8 ( unless specified otherwise in contract ) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) as per clause 305. | - | cum | 100 | - |
| 8 | Granular Sub-base with Close Graded Material (Table:- 400-1)
Plant Mix Method with Mechanically crushed stone only(Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 )
iii GSB grading-III Material 1st layer | - | cum | 100 | - |
| 9 | vi GSB grading-VI Material 2 nd layer | 13,983.25 | cum | 100 | ₹13,98,325.43 |
| 10 | WMM Grade 250mm
Wet Mix Macadam / Interlocking layer laying using by Grader (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.) as per clause 406. | - | cum. | 100 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.68 MB
Tenderdocument.rar
Tender Documents • 1.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .