Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Techno-commercially Qualified |
| 2 | Accepted-Technical 2ND FLOOR 45 A MAA SHARDA NAGAR KABIT KHEDI INDORE NEAR BHRAT PUBLIC SCHOOL MR 10 SQUARE INDORE MADHYA PRADESH 452010 | INDORE | MADHYA PRADESH | 452010 | Accepted-Technical Techno-Commercially qualified |
| 3 | Accepted-Technical | Accepted-Technical Techno-Commercially qualified |
| 4 | Accepted-Technical | Accepted-Technical Techno-commercially Qualified |
Tender Value
₹3.0 Cr
EMD Value
₹6.0 L
Closing Date
7 Apr 2026, 4:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy. Gen. Manager, Contract and Procurement
Admin Building, Indira Sagar Power Station, Narmada Nagar. Distt. Khandwa, Pin code - 450119
Construction of Club building at Indira Sagar Power Station, Narmada Nagar, Distt. Khandwa (M.P.)
2026_NHDC_901536_1
NIT No. 41/4267/2025-26 Dated 06.03.2026
Open Tender
Civil Works - Buildings
Percentage
330 days
Indira Sagar Power Station, Narmada Nagar
As per Tender Documents
3 documents required · 3 mandatory
₹1,770
NHDC Limited
₹6.0 L
Yes
8 May 2026
6 Mar 2026
10 Apr 2026
6 Mar 2026
7 Apr 2026
6 Mar 2026
6 Mar 2026 - 20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil works | 1 | cum | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottom disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed. (No extra lift is payable if work is done by mechanical means) All kinds of soil | 366.93 | Cum | 175.19 | ₹64,282.47 |
| 3 | Earth work in excavation/ by mechanical means (Hydraulic Excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottom disposal of excavated earth, Note:-Excavation of hard rock shall be the property of the contractor subject to recovery. excavated material has to shift from site within 15 days after instruction issued by Engineer-In Charge otherwise after this penalty will imposed on contractor at the rate of Rs 50 per cum per day. Ordinary rock | 550.41 | Cum | 342.05 | ₹1,88,267.74 |
| 4 | Excavating trenches of required width for pipes, cables, etc. including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m including getting out theexcavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : (No extra lift is payable if work is done by mechanical means) in all kinds of soil Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia. | 60 | Mtr | 185.92 | ₹11,155.2 |
| 5 | Filling available excavated earth (excluding hard rock/Ordinary rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 482.64 | Cum | 113.22 | ₹54,644.5 |
| 6 | Supplying and filling in plinth under floors including watering ramming consolidating in layers not exceeding 20cm in depth and dressing complete. With hard muram having CBR >12 % at under floors including watering, ramming and compacting (minimum compaction 95% of MDD) in layers not exceeding 20cm in thickness and dressing complete. (Note:- maximum thickness of this layer to be provided shall be 30cm). | 656.34 | Cum | 468.38 | ₹3,07,416.53 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level : With 40mm nominal size graded stone aggregate. M-10 Nominal (Mix -1 Cement : 3 sand : 6 graded stone aggregate) | 273.97 | Cum | 4,538.37 | ₹12,43,377.23 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete (with 20mm nominal size graded stone aggregate) excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : M-20 Grade Concrete | 551 | Cum | 7,333.15 | ₹40,40,565.65 |
| 9 | Centering and shuttering in cluding strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for concrete upto plinth level | 1,592.68 | Sqm | 227.16 | ₹3,61,793.19 |
| 10 | Brick work with fly ash lime bricks (FALG Bricks) conforming to IS:12894-2002, Having 50 kg cm2 average compressive strength Cement mortar 1:6 (1 cement : 6 sand) | 7.79 | Cum | 5,588.35 | ₹43,533.25 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
41Tender4267.pdf
Tender Documents • 8.78 MB
BOQ_947608.xls
BOQ • 0.37 MB
4267ext1.pdf
PDF • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .