Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹99,834.56Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.0 L+₹200.07 (0.20%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1 L
EMD Value
₹3,000
Closing Date
2 Jul 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
Irrigation supply through pipes NLO Ali Mohd Baba, Yash shah and others Block Dpora
2026_RDPR_313822_10
ENIT33of2026-27
Open Tender
Civil Works
Percentage
30 days
office of the executive engineer rew ang
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹3,000
3 Jul 2026
27 Jun 2026
3 Jul 2026
27 Jun 2026
2 Jul 2026
27 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Site Clearance by way of engagement of labours,cutting of bushes, etc | 1 | No | - | - |
| 0.0 | Earth work in excavation by mechanical means (hydraulic excavator) in foundation trenches or drains (not exceeding 1.5M in width as well as 10Sqm on plan) including dressing of sides ramming of bottoms lift up to 1.5M including getting out the excavated soil and disposal of surplus excavated soil within a lead of 1 M from edge of cutting. | 18.79 | cum | - | - |
| 0.0 | P/L of Stone soling including tamping manually incl carriage lead complet/incl plums and nallah boulder (for filling) | 0.37 | cum | - | - |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 1.07 | cum | - | - |
| 0.0 | Supply/Laying of GI Pipes 125mm(NB)Light | 548 | kg | - | - |
| 0.0 | Placing and fixing of Steel work (angle iron ,flats and all other fitting items) of approved quality | 145.21 | kg | 1 | ₹145.06 |
| 0.0 | carriage of materials sand /bajri 20 Km by MT | 1.46 | cum | - | - |
| 0.0 | Cement/Pipes,ANGLE IRON BWO Trip | 1 | trip | - | - |
| 0.0 | Signboard,documentation and photographic charges. | 1 | job | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_1015859.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .