| 1 | Admitted-Finance 8 1185 3B 352 3 PAVALI VILLAGE VIRUDHUNAGAR TK 626001 | VIRUDHUNAGAR | TAMIL NADU | 626001 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹46.1 L
EMD Value
₹47,000
Closing Date
27 May 2022, 3:00 pmClosed
Project Director
PD,DRDA Office Collectorate Perambalur
Perambalur District TN 11-01 Upgradation of the Road from Vilamuthur road NH 45 Via Saibaba Kovil Road KM 0/0-1/200 under TNRRIS 2021-2022 20 percent CGF Priority in Perambalur Block of Perambalur District
2022_RDTN_232358_1
DIPR/2184/TENDER/2022dated 07.05.2022
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA
Perambalur District TN 11-01 Upgradation of the Road from Vilamuthur road NH 45 Via Saibaba Kovil Road KM 0/0-1/200 under TNRRIS 2021-2022 20 percent CGF Priority in Perambalur Block of Perambalur District
4 documents required · 4 mandatory
₹0
₹47,000
PD,DRDA Perambalur
14 Jun 2022
16 May 2022
27 May 2022
16 May 2022
27 May 2022
20 May 2022
20 May 2022
Amount
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 .
Earth work excavation depositing on bank with initial lead of 0 metre and lift of 2 metre as per SS20A including breaking cods, sectioning ,ramming etc complete as directed by the departmental officers for formation (SI.No.60/P16)
Providing and Laying Gravel to the required Compacted thickness including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying PRIME COAT using slow setting emulsion bitumen Grade I at the rate of 7kg/10sqm over the WMM surface preparatory to another bituminous construction over it as per MORT& H Specifications No 502
Providing and laying TACK COAT using Rapid Setting bitumen grade Grade I at the rate of 2.5kg/10sqm over the Prime coat preparatory to another bituminous construction over it as per MORT& H Specifications No 503
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete in
Provision for HM Stone (0.75X0.23X0.10) Stones charges etc complete
Provision for KM Stone (1.65X0.45X015) Stones charges etc complete
Provision for Name Board
Provision for Sign board
RCC Slab Culvert 1.50m Span@ ch 0/150m Earth work excavation for foundation with all leads and lifts in all soils and to the required depth as may be directed except hard rock requiring blasting inclusive of shoring, struting and bailing out water whereever neccessary refilling the sides of foundation
P.C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to site and all labours charges etc., complete
Supplying and erecting, centering for side and soffits including necessary supports and structing for plain surfaces Such as RCC slab , Lintel Below sill level
Supplying and erecting, centering for side and soffits including necessary supports and structing for plain surfaces Such as RCC slab , Lintel Above sill level
Providing and laying concrete for plain cement concrete 1:3:6 for foundation complete as per drawing and MORD and techinical specification clause 802, 803, 1202 and 1203.
Plain cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance to site and all labours charges etc., complete
Supplying fitting and placing HYSD bar reinforcement (Fe415) in super structure complete as per drawing techinical specification clause 1002, 1010 and 1202
Providing reinforced cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance to site and all labours charges etc., complete
provision PVC pipes 110mm 4KG for weep holes etc complete
Provision for Tarpad Charges
RCC Slab Culvert 1.50m Span@ ch 540m Earth work excavation for foundation with all leads and lifts in all soils and to the required depth as may be directed except hard rock requiring blasting inclusive of shoring, struting and bailing out water whereever neccessary refilling the sides of foundation
P.C.C 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to site and all labours charges etc., complete
Supplying and erecting, centering for side and soffits including necessary supports and structing for plain surfaces Such as RCC slab , Lintel Below sill level
Supplying and erecting, centering for side and soffits including necessary supports and structing for plain surfaces Such as RCC slab , Lintel Above sill level
Providing and laying concrete for plain cement concrete 1:3:6 for foundation complete as per drawing and MORD and techinical specification clause 802, 803, 1202 and 1203.
Plain cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance to site and all labours charges etc., complete
Supplying fitting and placing HYSD bar reinforcement (Fe415) in super structure complete as per drawing techinical specification clause 1002, 1010 and 1202
Providing reinforced cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance to site and all labours charges etc., complete
provision PVC pipes 110mm 4KG for weep holes etc complete
Provision for Tarpad Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
ASHOK KUMAR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .