Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC NEW RASULPUR BAG MOLA RAM DIST FIROZABAD | FIROZABAD | UTTAR PRADESH | 224172 | ₹4.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.8 L+₹86,195.82 (17.5%)Rejected-Finance | ₹5.8 L+₹86,195.82 (17.5%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical MUGALGARHI MAJRA FULRAI TEHSEEL SIKANDRARAO HATHRAS | - | - | Rejected-Technical IDT-3 NOT CORRECT |
| 4 | Rejected-Technical | - | - | Rejected-Technical EXPERIENCE CERTIFICATE NOT ATTACHED AND IDT-3 NOT CORRECT |
Tender Value
₹5.8 L
EMD Value
₹58,000
Closing Date
17 Feb 2024, 1:00 pmClosed
Executive Engineer
Irrigation Division, Firozabad
Reconstruction of damaged VRB at km 3.750 ( tail gul) of Pratappur minor.
2024_UPIDC_894852_8
07/EE/2023-24
Open Tender
Civil Works
Item Wise
30 days
EE, ID, Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹856
Executive Engineer
₹58,000
12 Mar 2024
12 Feb 2024
17 Feb 2024
12 Feb 2024
17 Feb 2024
12 Feb 2024
Amount
Eartwork in filling for making or removing bundha in all types of soil ,proper dressing & compaction including initial lift and lead i/c all cost of labour,T&P etc.
Dismentelling work of old structure including cost of all labour, T&P etc. and proper disposal of material with distance of 60m or as directed by Engineer-in-charge for proper completion of work.
Earth work in excavation of foundation in all types of soil with initial lead & lift i/c all cost of labour,T&P etc.
C.C. 1:3:6 in cement ,Coarse sand and stone grit for foundation footing including all cost of labour ,materials ,T&P etc.for proper completion of work.
C.C. 1:6:12 in cement ,Coarse sand and stone grit for foundation footing including all cost of labour ,materials ,T&P etc.for proper completion of work.
Ist class brick work in 1:4 in cement mortar including all cost of labour ,materials ,T&P etc.for proper completion of work.
CC.1:1½:3 with stone ballast in R.C.C. work including all costof labour ,materials ,T&P etc.for proper completion of work.
C.C. 1:2:4 in ordinary work including all costof labour ,materials ,T&P etc.for proper completion of work.
Centering & shuttering for R.C.C including all cost of labour ,T&P etc.for proper completion of work.
Reinforcement of R.C.C. work including all cost of labour ,materials & T&P etc.for proper completion of work.
stuck deep cement pointing with 1:2 cement mortar including all cost of labour ,materials & T&P etc.for proper completion of work.
12 mm thick cement plaster with 1:4 cement mortar including all costof labour ,materials ,T&P etc.for proper completion of work.
Finishing Walls with Acrylic Smooth exterior paint (Apex) of required shade :New work(Two or more coat applied @1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)
Earth work in strengthning of damage bank including proper ramming and dressing with lead up to 1km & lift upto 1.5m including all cost of labour ,T&P etc.
supplying & fixing Thermocoal in joints i/c all cost of labour ,materials and T&P etc.
Making & fixing M.S. sign board size (1250mm x 900mm) 2400 mm height with painting and writing letters i/c all cost of labour ,materials and T&P etc.
P/F of R.C.C. Wheel Guard(size of 150mmx200mmx750mm)
PADAM SINGH
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .