| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.1 LAccepted-AOC | L1 | Accepted-AOC Being L1 Bidder | |
| 2 | L2₹19.9 L+₹58,458.40 (3.03%)Rejected-Finance | L2 | Rejected-Finance OTHER THAN L1 | |
| 3 | L3₹20.5 L+₹1.2 L (6.31%)Rejected-Finance | L3 | Rejected-Finance OTHER THAN L1 | |
| 4 | L4₹20.9 L+₹1.6 L (8.08%)Rejected-Finance C O AKBAR FURNITURE HOUSE MALHAR MORH GARHI UDHAMPUR J K 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L4 | Rejected-Finance OTHER THAN L1 | |
| 5 | L5₹27.5 L+₹8.1 L (42.2%)Rejected-Finance | L5 | Rejected-Finance OTHER THAN L1 |
| Sl No | Description | Qty | Unit | VIRINDER SINGH L5 | sohtra and co L2 | M/S SHUBAM ENGINEERS L6 | VISHWANATH AND SONS L1 | M/S ASHOK KUMAR PACHIALA L4 | M/s AKHIL SHARMA L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Desludging/Dewatering of septic tanck/ soakage wells includibng inlet/outlet chambers removing out all scum, siltresiduals sludge (both) organic or inorganic nature) after plugging the incomming sewage lines through conbined high presure water jetting cum suction (vaccum) typer machine nmounted on LCV/HCV facility of high presure vaccum and removing the same in the tank to a place outside contoment meant for the purpose by local municipality all as directed by Engr-in-charge. | 6,500 | Cum | 20 ₹1,30,000 Lowest | 30 ₹1,95,000 | 90 ₹5,85,000 | 65 ₹4,22,500 | 70 ₹4,55,000 | 70 ₹4,55,000 |
| 2.00 | M&L for cleaning of gully traps of any size and removing waste material etc. to a distance n. exc 50m and burrying in pits and re-filling the same complete all as specified and directed by the Eng-in-Charge. Note:-The cost for excavation and earth work for pits is deemed to be included in the unit rate complete all as specified and as directed. | 1,950 | Each | 50 ₹97,500 | 15 ₹29,250 Lowest | 15 ₹29,250 Lowest | 20 ₹39,000 | 25 ₹48,750 | 20 ₹39,000 |
| 3.00 | M&L for cleaning of SGSW/NP-2 pipes of any dia /bore by rodding from manhole to manhole or manhole to septic tank or vice versa and well flushing with water after cleaning and removing waste material etc to a distance n. exc 50m and burrying in pits and re-filling the same complete all as specified and directed by the Eng-in-Charge. Note:-The cost for excavation and earth work for pits and taking off manhole cover and placing the same in position after cleaning, is deemed to be included in the unit rate. | 1,850 | RM | 30 ₹55,500 | 15 ₹27,750 | 12 ₹22,200 Lowest | 20 ₹37,000 | 20 ₹37,000 | 15 ₹27,750 |
| 4.00 | M&L for cleaning of man holes n.exc 1.5m deep and removing sludge/waste material etc to a distance n. exc 150m and burrying in pits and re-filling the same complete all as specified and directed by the Eng-in-Charge. Note:-The cost for excavation and earth work for pits is deemed to be included in the unit rate. | 1,550 | Each | 100 ₹1,55,000 | 15 ₹23,250 Lowest | 40 ₹62,000 | 20 ₹31,000 | 25 ₹38,750 | 25 ₹38,750 |
| 5.00 | All as per item No.4 above but exc 1.50m deep and n. exc 3.0m deep complete all as specified and directed by the Eng-in-Charge. | 400 | Each | 150 ₹60,000 | 50 ₹20,000 | 85 ₹34,000 | 25 ₹10,000 Lowest | 30 ₹12,000 | 40 ₹16,000 |
| 6.00 | M&L for cleaning cast iron pipes 100/75mm bore by rodding with jute bags and well flushing after cleaning complete all as specified and directed. | 2,700 | RM | 50 ₹1,35,000 | 15 ₹40,500 | 8 ₹21,600 Lowest | 15 ₹40,500 | 20 ₹54,000 | 10 ₹27,000 |
| 7.00 | M&L for cleaning of floor traps and removing waste material etc to a distance n. exc 50m and burrying in pits and re-filling the same complete all as specified and directed by the Eng-in-Charge. Note:-The cost for excavation and earth work for pits is deemed to be included in the unit rate. | 1,800 | Each | 35 ₹63,000 | 15 ₹27,000 | 6 ₹10,800 Lowest | 20 ₹36,000 | 40 ₹72,000 | 12 ₹21,600 |
| 8.00 | M&L for cleaning of 'P' traps in WC and removing waste material etc to a distance n. exc 50m and burrying in pits and re-filling the same complete all as specified and directed by the Eng-in-Charge. Note:-The cost for excavation and earth work for pits is deemed to be included in the unit rate.
Note for Srl item No. 1 to 8:-
Contractor will provide minimum 04 (Four) persons for cleaning the blockages. The persons shall report to complaint cell, AGE BR-I at 0800 hrs for attending the complaints. Recovery @ Rs. 450/- per person per day will be done from contractor if less than 02 (Two) persons are provided by the contractor. | 1,700 | Each | 40 ₹68,000 | 15 ₹25,500 | 200 ₹3,40,000 | 20 ₹34,000 | 40 ₹68,000 | 12 ₹20,400 Lowest |
| 9.00 | Demolition of cement concrete (unreinforced) in ground floor and in paving not exceeding 15 cm thickness (below or above ground level) complete all as specified and as directed. | 59.65 | Cum | 50 ₹2,982.5 Lowest | 50 ₹2,982.5 Lowest | 70 ₹4,175.5 | 80 ₹4,772 | 80 ₹4,772 | 50 ₹2,982.5 Lowest |
| 10.00 | M&L for 100 thick PCC 1:4:8 type D-2 (40 mm graded stone agg ) as in sub base complete all as specified and directed. | 331 | Sqm | 150 ₹49,650 | 100 ₹33,100 | 258 ₹85,398 | 55 ₹18,205 Lowest | 80 ₹26,480 | 70 ₹23,170 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
13 Aug 2025, 6:00 pmClosed
GARRISON ENGINEER SOUTH UDHAMPUR
GARRISON ENGINEER SOUTH UDHAMPUR
CLEANING AND REPAIR TO SEWAGE TANK SOAKAGE WELLS REPAIRS TO COMPOUND WALL RCC JALLI AND ALLIED WORKS TO OTM AND MD ACCN UNDER GE SOUTH UDHAMPUR
2025_MES_720850_1
GE/S(U)-67/2025-26
Open Tender
Civil Works
Works
270 days
GE SOUTH UDHAMPUR
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
Yes
GE SOUTH UDHAMPUR
₹80,000
22 Sept 2025
16 Jul 2025
15 Aug 2025
16 Jul 2025
13 Aug 2025
30 Jul 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .