Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 LAccepted-AOC | ₹13.4 L | L1 | Accepted-AOC AGG WITH L1 |
| 2 | L2₹14.0 LRejected-AOC | ₹14.0 L | L2 | Rejected-AOC AGG WITH L1 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S ANIL CEMENT AGENCY L1 | AASHTA CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in Excavation in foundation including lead upto 30 m and lift upto 1.50m also i/c backfilling into the trenches labour ,T&P etc.complete | 301.62 | Cum | 83.75 ₹25,260.54 | 90 ₹27,145.65 |
| 2.00 | Laying C.C. in (1:4:8) Cement,coarse sand, aggregate including all cost of material, labour ,T&P etc complete. | 79.37 | Cum | 3,946.96 ₹3.1 L | 4,200 ₹3.3 L |
| 3.00 | Brickwork(M-150) in (1:4 CM) cement, coarse sand including all cost of material, labour ,T&P etc complete. | 60.29 | Cum | 4,659.47 ₹2.8 L | 5,000 ₹3.0 L |
| 4.00 | Supplying & Laying ordinary sand including cost of all material, labour & T&P etc. required for proper complition. | 100.3 | Cum | 251.25 ₹25,200.80 | 150 ₹15,045.25 |
| 5.00 | Providing 12.5 MM thick cement plaster in 1:4 cement mortar with coarse sand including proper curing all material ,labour T&P etc. Complete in all respect | 1,003.02 | Sqm | 122.36 ₹1.2 L | 125 ₹1.3 L |
| 6.00 | Supplying & Laying 200 Micron Thick LDPE Film i/c cost of all Labour , material ,T&P etc . Required for proper completion of work. | 1,155 | Sqm | 64.49 ₹74,483.06 | 70 ₹80,850 |
| 7.00 | Providing , supplying, fixing & Removing of Centering & shutering work for C.C. Work i/c cost of all labour material , T&P etc complete of work | 180 | Sqm | 674.19 ₹1.2 L | 575 ₹1.0 L |
| 8.00 | Laying 75 mm thick lining in M-15(1:2:4) including cost of all material labour & T&P etc.required for proper complition of work compaction by pavar | 57.75 | Cum | 5,072.77 ₹2.9 L | 5,400 ₹3.1 L |
| 9.00 | Supplying/Fixing 10 mm thick thermocol sheet in expention joints i/c cost of all Labour , material T&P etc. required for proper completion of work. | 29.45 | Sqm | 82.08 ₹2,417.31 | 98 ₹2,886.35 |
| 10.00 | Supplying/Fixing 10mm wide expention joints with bituminious fillar after removel of thermocol sheet i/c cost of all Labour , material T&P etc.required for proper completion of work. | 29.45 | Sqm | 37.52 ₹1,105.06 | 44.8 ₹1,319.47 |
Tender Value
₹16.1 L
EMD Value
₹1.6 L
Closing Date
21 Jan 2026, 12:00 pmClosed
EE MDGC Muzaffarnagar
EE MDGC Muzaffarnagar
Sidholi Rajwaha Ke Km 1.600 par Purvnirmit Fall ki marmmat and Fall ke upstream and downstream me CC lining ka karya
2026_UPIDC_1106465_4
TN-10/EE/2025-26
Open Tender
Civil Works
15 days
as per tender notice
as per tender notice
2 documents required · 2 mandatory
₹854
₹1.6 L
8 May 2026
15 Jan 2026
21 Jan 2026
15 Jan 2026
21 Jan 2026
15 Jan 2026
Earthwork in Excavation in foundation including lead upto 30 m and lift upto 1.50m also i/c backfilling into the trenches labour ,T&P etc.complete
Laying C.C. in (1:4:8) Cement,coarse sand, aggregate including all cost of material, labour ,T&P etc complete.
Brickwork(M-150) in (1:4 CM) cement, coarse sand including all cost of material, labour ,T&P etc complete.
Supplying & Laying ordinary sand including cost of all material, labour & T&P etc. required for proper complition.
Providing 12.5 MM thick cement plaster in 1:4 cement mortar with coarse sand including proper curing all material ,labour T&P etc. Complete in all respect
Supplying & Laying 200 Micron Thick LDPE Film i/c cost of all Labour , material ,T&P etc . Required for proper completion of work.
Providing , supplying, fixing & Removing of Centering & shutering work for C.C. Work i/c cost of all labour material , T&P etc complete of work
Laying 75 mm thick lining in M-15(1:2:4) including cost of all material labour & T&P etc.required for proper complition of work compaction by pavar
Supplying/Fixing 10 mm thick thermocol sheet in expention joints i/c cost of all Labour , material T&P etc. required for proper completion of work.
Supplying/Fixing 10mm wide expention joints with bituminious fillar after removel of thermocol sheet i/c cost of all Labour , material T&P etc.required for proper completion of work.
Earthwork in back filling including lead upto 1.00 km and lift upto 1.50m also i/c lavelling, ramming,dressing labour ,T&P etc.complete
Note : The Quantities written above may increase or decrease as per requirement & site condition
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.55 MB
Tendernotice_2.pdf
PDF • 1.94 MB
BOQ_2041452.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid