| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 LAccepted-AOC | L1 | Accepted-AOC AGG WITH L1 | |
| 2 | L2₹14.0 L+₹59,234.30 (4.41%)Rejected-AOC | L2 | Rejected-AOC AGG WITH L1 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S ANIL CEMENT AGENCY L1 | AASHTA CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in Excavation in foundation including lead upto 30 m and lift upto 1.50m also i/c backfilling into the trenches labour ,T&P etc.complete | 301.62 | Cum | 83.75 ₹25,260.54 Lowest | 90 ₹27,145.65 |
| 2.00 | Laying C.C. in (1:4:8) Cement,coarse sand, aggregate including all cost of material, labour ,T&P etc complete. | 79.37 | Cum | 3,946.96 ₹3,13,283.17 Lowest | 4,200 ₹3,33,367.65 |
| 3.00 | Brickwork(M-150) in (1:4 CM) cement, coarse sand including all cost of material, labour ,T&P etc complete. | 60.29 | Cum | 4,659.47 ₹2,80,927.32 Lowest | 5,000 ₹3,01,458.25 |
| 4.00 | Supplying & Laying ordinary sand including cost of all material, labour & T&P etc. required for proper complition. | 100.3 | Cum | 251.25 ₹25,200.8 | 150 ₹15,045.25 Lowest |
| 5.00 | Providing 12.5 MM thick cement plaster in 1:4 cement mortar with coarse sand including proper curing all material ,labour T&P etc. Complete in all respect | 1,003.02 | Sqm | 122.36 ₹1,22,727.91 Lowest | 125 ₹1,25,377.12 |
| 6.00 | Supplying & Laying 200 Micron Thick LDPE Film i/c cost of all Labour , material ,T&P etc . Required for proper completion of work. | 1,155 | Sqm | 64.49 ₹74,483.06 Lowest | 70 ₹80,850 |
| 7.00 | Providing , supplying, fixing & Removing of Centering & shutering work for C.C. Work i/c cost of all labour material , T&P etc complete of work | 180 | Sqm | 674.19 ₹1,21,353.75 | 575 ₹1,03,500 Lowest |
| 8.00 | Laying 75 mm thick lining in M-15(1:2:4) including cost of all material labour & T&P etc.required for proper complition of work compaction by pavar | 57.75 | Cum | 5,072.77 ₹2,92,952.53 Lowest | 5,400 ₹3,11,850 |
| 9.00 | Supplying/Fixing 10 mm thick thermocol sheet in expention joints i/c cost of all Labour , material T&P etc. required for proper completion of work. | 29.45 | Sqm | 82.08 ₹2,417.31 Lowest | 98 ₹2,886.35 |
| 10.00 | Supplying/Fixing 10mm wide expention joints with bituminious fillar after removel of thermocol sheet i/c cost of all Labour , material T&P etc.required for proper completion of work. | 29.45 | Sqm | 37.52 ₹1,105.06 Lowest | 44.8 ₹1,319.47 |
Tender Value
₹16.1 L
EMD Value
₹1.6 L
Closing Date
21 Jan 2026, 12:00 pmClosed
EE MDGC Muzaffarnagar
EE MDGC Muzaffarnagar
Sidholi Rajwaha Ke Km 1.600 par Purvnirmit Fall ki marmmat and Fall ke upstream and downstream me CC lining ka karya
2026_UPIDC_1106465_4
TN-10/EE/2025-26
Open Tender
Civil Works
Item Wise
15 days
as per tender notice
as per tender notice
2 documents required · 2 mandatory
₹854
₹1.6 L
8 May 2026
15 Jan 2026
21 Jan 2026
15 Jan 2026
21 Jan 2026
15 Jan 2026
Earthwork in Excavation in foundation including lead upto 30 m and lift upto 1.50m also i/c backfilling into the trenches labour ,T&P etc.complete
Laying C.C. in (1:4:8) Cement,coarse sand, aggregate including all cost of material, labour ,T&P etc complete.
Brickwork(M-150) in (1:4 CM) cement, coarse sand including all cost of material, labour ,T&P etc complete.
Supplying & Laying ordinary sand including cost of all material, labour & T&P etc. required for proper complition.
Providing 12.5 MM thick cement plaster in 1:4 cement mortar with coarse sand including proper curing all material ,labour T&P etc. Complete in all respect
Supplying & Laying 200 Micron Thick LDPE Film i/c cost of all Labour , material ,T&P etc . Required for proper completion of work.
Providing , supplying, fixing & Removing of Centering & shutering work for C.C. Work i/c cost of all labour material , T&P etc complete of work
Laying 75 mm thick lining in M-15(1:2:4) including cost of all material labour & T&P etc.required for proper complition of work compaction by pavar
Supplying/Fixing 10 mm thick thermocol sheet in expention joints i/c cost of all Labour , material T&P etc. required for proper completion of work.
Supplying/Fixing 10mm wide expention joints with bituminious fillar after removel of thermocol sheet i/c cost of all Labour , material T&P etc.required for proper completion of work.
Earthwork in back filling including lead upto 1.00 km and lift upto 1.50m also i/c lavelling, ramming,dressing labour ,T&P etc.complete
Note : The Quantities written above may increase or decrease as per requirement & site condition
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.55 MB
Tendernotice_2.pdf
PDF • 1.94 MB
BOQ_2041452.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .