| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.5 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹13.6 Cr+₹4.5 L (0.33%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹13.7 Cr+₹11.2 L (0.83%)Admitted-Finance KUSHAL BAG RAJ RAJESHWARI COLONY BANSWARA 327001 RAJASTHAN | BANSWARA | BANSWARA | RAJASTHAN | 327001 | L3 | Admitted-Finance | ||
| 4 | L4₹13.8 Cr+₹24.3 L (1.79%)Admitted-Finance 04 3 | PRATAPGARH | RAJASTHAN | 312604 | L4 | Admitted-Finance | ||
| 5 | L5₹14.4 Cr+₹90.7 L (6.70%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹15.6 Cr
EMD Value
₹31.2 L
Closing Date
15 Sept 2025, 6:00 pmClosed
ACE PWD Zone I Udaipur
Office of The ACE PWD Zone I Udaipur
Construction of Bridge on Gambhiri River between Ghatiyawali to Khor road km 3 - Distt. Chittorgarh
2025_CEPWD_496675_1
NIT-11-2025-26 ACE PWD Zone I Udaipur
Open Tender
Civil Works - Bridges
Percentage
450 days
Chittorgarh
As per Bid Document
3 documents required · 3 mandatory
₹5,000
Egras Challan - EE PWD Dn Chittorgarh
₹31.2 L
Yes
Office of The ACE PWD Zone I Udaipur
10 Oct 2025
25 Aug 2025
17 Sept 2025
25 Aug 2025
15 Sept 2025
3 Sept 2025
25 Aug 2025 - 3 Sept 2025
3 Sept 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305. In hard soil mixed with kankar,boulders etc. upto 20% Depth upto 3 metre | 1,415.63 | Cum | 275 | ₹3,89,298.25 |
| - | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305. By chieseling/wedging out rock where blasting is prohibited in soft rock | 2,359.39 | Cum | 1,243 | ₹29,32,721.77 |
| - | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305. By chieseling/wedging out rock where blasting is prohibited in hard rock | 943.75 | Cum | 1,877 | ₹17,71,418.75 |
| - | Providing and laying Cement concrete for plain/reinforced concrete in open foundation as per drawing and technical specification as per MoRTH Specification : Section 1500, 1700 & 2100 including form work at any level.
P.C.C. grade M15 | 1,039.33 | Cum | 3,750 | ₹38,97,478.5 |
| - | Providing and laying Cement concrete for plain/reinforced concrete in open foundation as per drawing and technical specification as per MoRTH Specification : Section 1500, 1700 & 2100 including form work at any level.
R.C.C. grade M35 | 1,269 | Cum | 4,750 | ₹60,27,750 |
| - | Providing and laying steel reinforcement at any level in foundation/ pile/ pile cap complete as per drawing and clause 1600 of MoRT&H Specification including all material, labour and machinery.
'The structural steel to be used should be used ballot by Primary Steel manufactured and approved by Engineering in charged
'TMT Steel reinforcement | 296.97 | MT | 79,610 | ₹2,36,41,741.9 |
| - | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305.
In ordinary soil
Depth upto 3 metre | 4,812.26 | Cum | 190 | ₹9,14,329.1 |
| - | Providing and laying Cement concrete for plain/reinforced concrete in open foundation as per drawing and technical specification as per MoRTH Specification : Section 1500, 1700 & 2100 including form work at any level. R.C.C. grade M30 | 1,320 | Cum | 4,730 | ₹62,43,576.35 |
| - | Structural Cement concrete for plain concrete/ reinforced concrete for substructure at any level, complete as per drawing and technical specification. Using Batching Plant, Transit Mixture, and Concrete Pump. Design mix concrete - [MoRTH Specification : Clause 1500&1700] R.C.C including formwork R.C.C. grade M30 upto 10 metre height | 1,214.31 | Cum | 5,250 | ₹63,75,140.63 |
| - | Supplying, fitting and placing reinforcement in sub structure/ superstructure at all level complete as per drawing and clause 1600 & 2200 of MoRT&H Specification including all material, labour, machinary etc.
The structural steel to be used should be used ballot by Primary Steel manufactured and approved by Engineering in charged
'TMT Steel reinforcement | 416.21 | MT | 93,000 | ₹3,87,07,771.8 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.64 MB
BOQ_885426.xls
BOQ • 0.42 MB
Post-Qualification-Gambhiri-Bridge.pdf
Tender Documents • 10.65 MB
Financial-Gambhiri-Bridge.pdf
Tender Documents • 10.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .