| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-Finance | ₹2.0 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹2.0 CrAccepted-Finance | ₹2.0 Cr | L2 | Accepted-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-EMD and tender fee not submitted |
Tender Value
₹2.0 Cr
EMD Value
₹2.0 L
Closing Date
21 Sept 2023, 9:30 amClosed
Executive Engineer, Sangram division, PWD, A.P.
O/o Executive Engineer, Sangram division PWD, Kurung kumey District
Construction of Road from PMGSY road to Tabiang Village PhII SH Widening CC Drain RWall WBM BT Works
2023_PWDAP_1395_1
SGMD/Tender/SASCI/2023-24/01
Open Tender
Civil Works – Roads
Item Rate
365 days
Tabiang, Kurung Kumey District
As per eNIT
3 documents required · 3 mandatory
₹2,000
EE PWD Sangram division
₹2.0 L
Yes
21 Sept 2023
14 Sept 2023
21 Sept 2023
14 Sept 2023
21 Sept 2023
14 Sept 2023
14 Sept 2023 - 18 Sept 2023
Amount
FC(Re-alignment:0.18 km)
Excavation in Soil with Dozer with lead upto 100 metres ( Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.)
Excavation in Soil with Dozer with lead upto 100 metres ( Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.)
SH2: Pavement
WBM-I: (1.50 km) Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) (i) Grading- I (Using Screening Crushable type such as Moorum or Gravel) (b) Using Screening Type-A (13.2mm Agg.)
WBM-II: (1.50 km) Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) (ii) Grading- II (Using Screening Crushable type such as Moorum or Gravel) (c) Using Screening Type-B (11.2mm Agg.)
WBM-III: (1.50 km) Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) (iii) Grading- III (Using Screening Crushable type such as Moorum or Gravel)
Black topping:(1.50km): A. Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.)
B. Tack coat :Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom
C. Open - Graded Premix Surfacing (Providing, laying and rolling of open -graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.) (i) Case - I: Mechanical method using Penetration grade Bitumen and HMP of appropriate capacity not less than 75 tonnes/hour .
D. Seal Coat (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A and B seal coats) (i) Case - I : Type A
CC Drain: 1.50 km
Earth work in excavation in foundation and trenches etc in all kinds of soil(excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size saturated soil and rock) lift upto 1.50m and stacking the excavated soil not more than 3m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required into plinth sides of foundation etc. consolidating each diposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m.
providing and laying cement concrete 1:3:6(1 cement:3 course sand:6) graded stone aggregate 20mm nominal size)excluding the cost of centring and shuttering in a)foundations and plinth
centring and shuttering including strutting propping etc and removal of form work for:- b) walls including attached butress,pilasters etc.
12 mm cement plaster in CM 1:4(1 cement:4 sand)
A Neat cement punning
Retaining wall:80.00 Mtrs
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) I Ordinary soil A Manual Means (i) upto 3 m depth (without de-watering)
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and Technical Specification b) Random Rubble Masonry
Dry rubble flooring
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A Granular material
P.K Enterprises
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].