Loading…
Loading…
Tender Value
₹2.0 L
EMD Value
₹3,960
Closing Date
4 Aug 2026, 3:00 pm
Executive Engineer
23B Netaji Subhas Road 3rd Floor Kolkata 700 001
Construction of Guardwall
2026_WBAIC_1033298_1
AIC/AED/NIeT-141/26-27
Open Tender
CIVIL WORKS
Percentage
60 days
Purba Medinipur
Please refer Tender documents.
4 documents required · 4 mandatory
₹885
₹3,960
Yes
West Bengal Agro Industries Corporation Limited
20 Jul 2026
20 Jul 2026
7 Aug 2026
20 Jul 2026
4 Aug 2026
21 Jul 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains in sorts of soil(including mixed soil but excluding laterite or sandstone) including removing spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary
trimming the sides of trenches,leveling, dressing and ramming the bottom, bailng out water as required complete.
a) depth of excavation not exceeding 1500 mm | 3.91 | Cum | 119.27 | ₹466.35 |
| 2 | Earth work in filling in foundation trenches or plinth with good earth. In layer not exceeding 150 mm. including watering and raming etc. layer by layer.
a) With earth obtained from excavation of foundation. | 1.3 | Cum | 77.54 | ₹100.8 |
| 3 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm. as directed and consolidating same by thorough saturation with water ramming complete, including the cost of supply of sand, | 15.63 | Cum | 543.51 | ₹8,495.06 |
| 4 | Cement concrete with graded stone ballast (40mm. Size) excluding shuttering In ground and foundation. (4:2:1) | 0.63 | Cum | 6,445.32 | ₹4,060.55 |
| 5 | Hire and labour charges for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works 25mm, to 30mm. thick wooden shuttering as per decision &ection of EIC without staging | 1.16 | Sqm | 205 | ₹237.8 |
| 6 | Brick work with 1st class bricks in cement mortar(6:1) a) In foundation and plinth Wall | 17.19 | Cum | 5,562 | ₹95,610.78 |
| 7 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as direcred and raking out joints or roughening of concrete surface, including throating, nosing and drip course where necessary
10mm. Th. Plaster (4:1) | 414.71 | Sqm | 137 | ₹56,815.27 |
| 8 | Sub Total | - | - | - | - |
| 9 | GST 18% | 1 | Nos | - | - |
| 10 | CESS 1% | 1 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
Tendernotice_2.pdf
PDF • 1.11 MB
BOQ_2537667.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].