Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.2 LAccepted-AOC | L1 | Accepted-AOC Lowest negotiated tender | |
| 2 | L2₹65.2 L+₹16.2 L (33.0%)Rejected-AOC | L2 | Rejected-AOC Second lowest tender |
Tender Value
₹43.3 L
EMD Value
₹32,000
Closing Date
29 Feb 2024, 3:00 pmClosed
Superintending Engineer, PWD
O/o. The Superintending Engineer, PWD., Building Maintenance Circle, Chepauk, Chennai-5
Provision of VRF type Air Conditioning facilities to the SEOC at Ground floor, Ezhilagam, Chepauk, Chennai-05.
2024_PWD_431354_1
PWD/30/BMC/2023-24
Open Tender
Electrical Works
Item Rate
60 days
Ezhilagam building, Chepauk
refer tender document
9 documents required · 9 mandatory
₹0
₹32,000
12 Jun 2024
28 Feb 2024
29 Feb 2024
28 Feb 2024
29 Feb 2024
28 Feb 2024
Amount
2.0 TR Hi Wall Split Indoor Unit Supply of VARIABLE REFRIGERANT FLOW SYSTEM of below mentioned capacities comprising of DC INVERTER & Scroll Compressor and complete.
16 HP OUTDOOR UNITS Supply of VARIABLE REFRIGERANT FLOW SYSTEM of below mentioned capacities comprising of DC INVERTER & Scroll Compressor and complete.
Refnet Joints Inoor units
Cordless Remote Controller
Installation of Indoor units
Supply and Installation of 1/4 Copper Pipe (18G) Copper Piping finished with polyshield coating with Necessary fittings.
Supply and Installation of 1/2 Copper Pipe (18 G) Copper Piping finished with polyshield coating with Necessary fittings.
Supply and Installation of 3/8Copper Pipe (18 G) Copper Piping finished with polyshield coating with Necessary fittings.
Supply and Installation of 5/8 Copper Pipe (18 G) Copper Piping finished with polyshield coating with Necessary fittings.
Supply and Installation of 7/8 Copper Pipe (18 G) Copper Piping finished with polyshield coating with Necessary fittings.
Supply and Installation of 11/8 Copper Pipe (18 G) Copper Piping finished with polyshield coating with Necessary fittings.
Supply and Installation of 3/4 Copper Pipe (18 G) Copper Piping finished with polyshield coating with Necessary fittings.
The copper pipe to be insulated with 19mm thick for suction 13mm thick for liquid
Supply and installation of PVC drain piping
Supply, laying of Control wiring between indoor units and outdoor units with PVC Conduits
Installation of VRF Outdoor Units
Supply and filling of R-407C Refrigerant gas.
Nitrogen Pressure Testing, Vaccumising & commissioning of the entier system
Labour work charges for Lifting VRF outdoor units to the specific locations.
Supply and Erection of Scaffolding work for laying of Copper piping drain piping etc..
Sankar Jaganathan
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_512611.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .