| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹53.1 LAccepted-AOC RANIPET 632403 | RANIPET | RANIPET | TAMIL NADU | 632403 | L-1 | Accepted-AOC L-1 Adambasha
Lowest Rate | |
| 2 | L-2₹54.2 L+₹1.1 L (1.99%)Rejected-AOC DHAMARAIPAKKAM BUILDING AT PUES IN DHAMARAIPAKKAM PANCHAYAT | L-2 | Rejected-AOC L-2 SSKT Enterprises
Highest Rate |
Tender Value
₹53.2 L
EMD Value
₹58,000
Closing Date
16 May 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
Project Director DRA-Ranipet
Strengthening the Road from Nagaleri Pallacollony to Arcot Thindivanam Road Km 0/0 - 1/720 in Thirmi Block at Ranipet District MGSMT 2025-26
2025_RDTN_552964_1
A3/7130/2024
Open Tender
Civil Works
Works
180 days
DRDA-Ranipet
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹58,000
9 Jun 2025
30 Apr 2025
16 May 2025
30 Apr 2025
16 May 2025
30 Apr 2025
Amount
Thimiri Block
Strengthening the road from Nagaleri Palla Colony to Arcot Thindivanam Road KM 0/0-1/720 ( R-63 ) Thimiri Block, Ranipet District.
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 Cm to 10 cm of existing wornout BT / WBM Surface sectioning in all labour charges etc complete (1/3)
Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A.
Collection and supply of Carted Earth from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC
Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance
Applying tack coat over WMM surface using 2.50 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site,
PRetro-Reflectorised Traffic Signs (with out definition board) Type - IV Providing and erecting of Retro - Reflector›sed Cautionary, Maridatory and Informatory signs {without definition board} made out of High Intensity Prismatic Grade Sh
60 cm equilateral triangle
Provision for Hectometer stone
Provision for Kilometer stone
Road Stud with lens reflector
Provision for New Culvert Ch @ 1/208
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Plain Cement Concrete 1:2:4 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc Complete,
RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc,
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Slab Centring
Provision for Weephole 75mm dia PVC pipe provision
Providing and fixing 20mm Bitumen felt for expansion joint between Dirt wall Deck slab.
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the department officer
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
SSKT ENTERPRISES (BID ID -1340374)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .