Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC | ₹8.5 L Quoted ₹9.4 L | L1 | Accepted-AOC Work Awarded |
| Sl No | Description | Qty | Unit | Axiom India L1 |
|---|---|---|---|---|
| 1.00 | Preparation of Detailed Project Report for the conservation and Adaptive reuse of Town Hall.
Scope of work: To prepare a Conservation and Adaptive Reuse DPR that comprehensively documents and outlines all aspects for the said project, serving as a roadmap for the stakeholders involved. It shall include project objectives, timelines, financial projections, resource allocations, and risk assessments. The DPR will essentially be used for securing financing and ensuring compliance with regulatory requirements, acting as a bridge between project conception and execution.
The DPR shall include the following:
1. Project Summary
A project summary giving an overview of the entire initiative, including its objectives, scope, and expected outcomes.
2. Technical Feasibility
Technical feasibility assessing available technology and resources. This section shall detail the technical requirements, such as tools, processes, and expertise needed to achieve the project's objectives.
3. Financial Projections
Financial projections detailing the project's anticipated costs and the cash flow forecast for the smooth and timely completion of the project.
4. Risk Assessment
Risk assessment identifying the potential obstacles like sanctions, environmental requirements, and developing strategies to mitigate them.
5. Guiding Execution
The DPR should provide a detailed roadmap for project execution, guiding the project team through each phase. The meticulous planning within a DPR should ensure that all aspects are considered, potential issues are identified early, and mitigation strategies are in place.
All studies and surveys of the existing premise to be borne by the consultant as part of the DPR”. | 1 | Job | 9,44,000 ₹9,44,000 Lowest |
Tender Value
₹9.8 L
EMD Value
₹19,600
Closing Date
9 Jun 2025, 3:00 pmClosed
Ex. Engineer (Pr.) CSPZ
Room No. 300, 3rd Floor, Old Hindu College Bldg. Kashmere Gate, Delhi-110006
Engagement of consultant for preparation of Detailed Project report (DPR) for the conservation and adaptive Re-use of Town Hall
2025_MCD_237160_1
EE(Pr.)CSPZ/TC/2025-26/04_01
Open Tender
Civil Works
Item Rate
90 days
Chandni Chowk
Please refer Tender documents.
5 documents required · 5 mandatory
₹590
₹19,600
29 Aug 2025
2 Jun 2025
9 Jun 2025
2 Jun 2025
9 Jun 2025
2 Jun 2025
Amount
Preparation of Detailed Project Report for the conservation and Adaptive reuse of Town Hall. Scope of work: To prepare a Conservation and Adaptive Reuse DPR that comprehensively documents and outlines all aspects for the said project, serving as a roadmap for the stakeholders involved. It shall include project objectives, timelines, financial projections, resource allocations, and risk assessments. The DPR will essentially be used for securing financing and ensuring compliance with regulatory requirements, acting as a bridge between project conception and execution. The DPR shall include the following: 1. Project Summary A project summary giving an overview of the entire initiative, including its objectives, scope, and expected outcomes. 2. Technical Feasibility Technical feasibility assessing available technology and resources. This section shall detail the technical requirements, such as tools, processes, and expertise needed to achieve the project's objectives. 3. Financial Projections Financial projections detailing the project's anticipated costs and the cash flow forecast for the smooth and timely completion of the project. 4. Risk Assessment Risk assessment identifying the potential obstacles like sanctions, environmental requirements, and developing strategies to mitigate them. 5. Guiding Execution The DPR should provide a detailed roadmap for project execution, guiding the project team through each phase. The meticulous planning within a DPR should ensure that all aspects are considered, potential issues are identified early, and mitigation strategies are in place. All studies and surveys of the existing premise to be borne by the consultant as part of the DPR”.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .