30 May 2020, 12:30 pmClosed
Puneet Khanna (Head-Supply Chain Management)
Worley India Private Limited, (formerly Jacobs Engineering India Private Limited) New Energy House, Ramakrishna Mandir Road, Kondivita, Andheri (East), Mumbai-400 059, India
Modification of Net Gas Compressor 49-K-02 A/B
2020_REFHQ_116757_1
44AC2700-ER-02-0015
Single
Mechanical - Pumps, Compressors, Steam Turbines and Other Equipment
Supply
120 days
IOCL GUWAHTI REFINERY
Not Applicable
3 documents required · 3 mandatory
Exempted
23 Sept 2020
9 May 2020
1 Jun 2020
9 May 2020
30 May 2020
23 May 2020
Scope :- Design, engineering, manufacturing, supply of components, assembly, painting, inspection and testing,packing, forwarding, supply of mandatory spares,commissioning spares and special tools and tackles,transportation, supervision of dismantling, installation,erection, testing and commissioning, mechanical and performance guarantees of the Net gas Compressors as per the requirements specified. Lot shall be for both compressors
Ring Piston, Ring Rider, Piston, Frame head, Outer head
Modification in Local Control Panel, calibration of transmitter, pneumatic tubing
Discharge Pressure Gauge
2.25-inch bore orifice for the Suction pulsation bottle cylinder flange
2.0-inch bore orifice for the Suction pulsation bottle inlet line flange
2.25-inch bore orifice for the Discharge pulsation bottle cylinder flange
1.75-inch bore orifice for the Discharge pulsation bottle outlet flange
Mandatory Spares
Piston ring
Rider ring
Gaskets, stud bolts, machine bolts etc replaced during modification.
Description of Work / Item(s)
RECOMMENDED SPARES FOR TWO YEARS O&M – Net Gas Compressor 49-K-02 A/B
Description of Work / Item(s)
CHARGES FOR SITE SUPERVISION OF MODIFICATION WORKS, ERECTION, TESTING AND COMMISSIONING OF ALL SUPPLIES. Refer Annexure-K of SPC & ITB for Terms & conditions for Site Supervision Services and Training for Indian bidders.
For Modification of Net Gas Compressors For all Tag No. 49-K-02A/B : Total 30 Mandays estimated for site supervision of Modification works, Testing & Commissioning
Per diem charges (per person) for 8 hours work on normal working days.
Overtime rate / hour beyond normal 8 hours work on normal working days.
Overtime rate / hour for work on weekly off days/ holidays (as applicable to Refinery site).
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .