Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
17 Feb 2026, 4:00 pmClosed
Executive Engineer RNB Division Pulwama
Executive Engineer RNB Division Pulwama
Wahibugh Bridge
2026_PWDJK_302029_1
138 /EEP/RNB/of 2025-26/10796-806 dt.02.02.2026
Open Tender
Civil Works
Percentage
45 days
Pulwama
as per nit
3 documents required · 3 mandatory
₹2,600
Executive Engineer RNB Division Pulwama
₹2.2 L
18 Feb 2026
2 Feb 2026
18 Feb 2026
2 Feb 2026
17 Feb 2026
2 Feb 2026
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
Supply and hand packing stones into wire crates 100mmx100mm mesh (woven diagonally) of thickness3 mm including laying of crates in pproper position, binding top after filling of stones including carriageof crateswith loading , unloadinh complete including the cost of crate , royalty, haulages etc complete job (Nallah) all as per directions of EIC
Supply and filling of locally available RBM material including consolidation and carriage of material upto site of work
Dry stone pitching (any thickness) excluding cost of stones.On Slopes
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Engagement of JCB for debris removal as per the directions od engineer in charge
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. (and disposal of boulders as per the directions on engineer in charge)All kinds of soil :
Carriage of materials form source to site
Sand for an avg lead 7km
stonew Aggregate for an avg lead 7km
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_979936.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .