Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance | -1.05% | ₹2.0 L | L1 | Admitted-Finance |
| 2 | L2₹2.0 L+₹2,114.86 (1.06%)Admitted-Finance | +0.00% | ₹2.0 L+₹2,114.86 (1.06%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 L+₹4,129.01 (2.07%)Admitted-Finance | +1.00% | ₹2.0 L+₹4,129.01 (2.07%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Shortage Credential |
Tender Value
₹2.0 L
EMD Value
₹4,028
Closing Date
21 Aug 2026, 1:00 pmClosed
Executive Engineer,Howrah Division, PWD
Howrah Division, PWD, Onkarmal Jetia Road, Howrah
Road side jungle cutting work at Narendrapur-Amta Road from 0.00 Km to 12.30 km under Howrah Division PWD during the year 2026-27.
2026_WBPWD_5018444_1
WBPWD/EE/HD/NIeT_29/2026_27
Open Tender
CIVIL WORKS
Percentage
7 days
Howrah Division, PWD, Onkarmal Jetia Road
Pl. refer Tender Documents
4 documents required · 4 mandatory
₹4,028
23 Sept 2026
12 Aug 2026
24 Aug 2026
13 Aug 2026
21 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land
Clearing and grubbing road land
including uprooting rank vegetation,
grass, bushes, shrubs, saplings and trees
girth up to 300 mm, removal of stumps
of trees cut earlier and disposal of
unserviceable materials and stacking of
serviceable material to be used or
auctioned, up to a lead of 1000 metres
including removal and disposal of top
organic soil not exceeding 150 mm in
thickness. (Reference to MoRT&H's
specification clause 201) 3(II) By Mechanical Means
3(II)(A) In area of light jungle | 2.95 | Hectare | 50,633.31 | ₹1,49,368.26 |
| 2 | Surface Drains in Soil
Construction of unlined surface drains
of average cross sectional area 0.40
sqm in soil to specified lines, grades,
levels and dimensions to the
requirement of clause 301 and 309.
Excavated material to be used in
embankment within a lead of 50
metres (average lead 25 metres)
(Reference to MoRT&H's specification
clause 309).
24A Mechanical means | 162.5 | Mtr | 66.36 | ₹10,783.5 |
| 3 | Cutting of Trees, including cutting of
Trunks, Branches and Removal
Cutting of trees, including cutting of
trunks, branches and removal of
stumps, roots, stacking of serviceable
material with all lifts and up to a lead
of 1000 metres and earth filling in the
depression/pit. (Reference to MORT&H's
specification clause 201)
i)Girth from 300 mm to 600 mm | - | Each | 301.12 | - |
| 4 | GST @18% Sl no 1 to 3 | - | INR | 0.18 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_5089550.xls
BOQ • 0.29 MB
2911.pdf
Tender Documents • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .