Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.5 LAccepted-Finance KALLAKURICHI | TAMIL NADU | 605702 | L1 | Accepted-Finance Less Estimate Rate | |
| 2 | L2₹21.5 L+₹91,788.38 (4.47%)Rejected-Finance ARIYALUR | TAMIL NADU | 608703 | L2 | Rejected-Finance Above Estimate Rate |
Tender Value
₹20.8 L
EMD Value
₹21,000
Closing Date
8 Jun 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Village Panchayat President
Village Panchayat Office, Kanjirankulam Pt.
Strengthening of the road from Nallu-pappankulam to Jaripudukottai road ch 0/0-0/4 in Kanjirankulam Panchayat
2022_RDTN_234873_1
Kanjirankulam
Open Tender
Civil Works - Roads
Item Rate
120 days
Kanjirankulam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹21,000
9 Jun 2022
3 Jun 2022
8 Jun 2022
3 Jun 2022
8 Jun 2022
3 Jun 2022
90 days
Amount
Strengthening of the road from Nallu-pappankulam to Jaripudukottai road ch 0/0-0/4 in Kanjirankulam Panchayat
Clearing the scrub Jungle with out uprooting including all labour charges
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction
Picking the existing worn out B.T surface including all charges etc., complete
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Applying TACK COAT over BT surface at 4 Kg of RS-1 Bitumen Emulsion/ 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Construction of Granular Sub base by Providing well graded material as per standard specification etc., complete
Provision for KM and HM stones guard stone
Hecta metre stone
Pipe Culvert
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.B
Collection and filling of river sand including cost and conveyance etc., complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG Metal including etc. complete
Supply and erecting centering shuttering including etc., complete
Cement Concrete 1:3:6 mix using 40mm ISS HBG Metal including etc. complete
Supply and fixing of NP3 pipe 900mm Dia including etc., complete
Collection and Supplpy of gritty gravel from approved quarry including all charges etc.,complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M KAMALAKANNAN
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .