| 1 | L1₹35.5 LAccepted-AOC 13 P N DOGRA MARKET GOLE MARKET UDHAMPUR 182101 J K | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L1 | Accepted-AOC L1 | |
| 2 | L2₹35.9 L+₹37,650 (1.06%)Rejected-Finance P O GARNAI VILLAGE LADHYALA MALHAR TEHSIL DISTT UDHAMPUR J K 182121 | UDHAMPUR | JAMMU AND KASHMIR | 182121 | L2 | Rejected-Finance OTHER THAN L1 | |
| 3 | L3₹38.1 L+₹2.5 L (7.13%)Rejected-Finance | L3 | Rejected-Finance OTHER THAN L1 | |
| 4 | L4₹40.3 L+₹4.7 L (13.3%)Rejected-Finance NEW JAIL ROAD UDHAMPUR 182101 J K | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L4 | Rejected-Finance OTHER THAN L1 | |
| 5 | L5₹40.5 L+₹4.9 L (13.9%)Rejected-Finance | L5 | Rejected-Finance OTHER THAN L1 |
| Sl No | Description | Qty | Unit | VARDHMAN INTERNATIONAL L1 | SINGH CONST CO L4 | RAMAN CONSTRUCTION CO L3 | M/s Parshotam Lal Sharma L5 | ASHOK KUMAR GUPTA L8 | M/S VERINDER KUMAR GUPTA L7 | pargal builders L9 | m/s sushila devi L2 | RAJ MOHD L6 | r k builders L10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down cement plaster, any description, on brick or stone walls, etc. including raking out joints hacking for key, scrubbing down with water etc. complete all as specified and directed by Engineer-in-Charge. | 2,700 | Sqm | 10 ₹27,000 | 12 ₹32,400 | 7 ₹18,900 | 9 ₹24,300 | 22 ₹59,400 | 20 ₹54,000 | 25 ₹67,500 | 4 ₹10,800 Lowest | 18 ₹48,600 | 30 ₹81,000 |
| 2.00 | Demolition of brick work or stone /boulder masonry, built in cement mortar, including all quoins, arches, pillars etc but excluding ashlar facing, dressed stone work and precast concrete articles etc, complete all as specified and directed by Engineer-in-charge. | 15 | Cum | 150 ₹2,250 | 250 ₹3,750 | 100 ₹1,500 | 200 ₹3,000 | 220 ₹3,300 | 200 ₹3,000 | 230 ₹3,450 | 40 ₹600 Lowest | 220 ₹3,300 | 250 ₹3,750 |
| 3.00 | Brick work with sub class 'B' bricks straight or curved on plan, exceeding 6 m mean radius with old size bricks, built in cement mortar 1:6, complete all as specified and directed by Engineer-in-charge. | 15 | Cum | 6,500 ₹97,500 | 5,200 ₹78,000 | 4,000 ₹60,000 Lowest | 4,200 ₹63,000 | 5,100 ₹76,500 | 5,000 ₹75,000 | 5,200 ₹78,000 | 4,500 ₹67,500 | 4,800 ₹72,000 | 5,150 ₹77,250 |
| 4.00 | Rendering 15mm thick in cement mortar 1:4 on fair faces of bricks work/concrete surface finished the surface even and smooth (without using extra cement) as on walls complete all as specified and directed by Engineer-in-charge.
Notes :- Plaster shall be carried out upto any height in patches and contractor shall have no claim for height and scaffolding what so ever is required to complete the work. | 1,200 | Sqm | 200 ₹2,40,000 | 250 ₹3,00,000 | 200 ₹2,40,000 | 205 ₹2,46,000 | 310 ₹3,72,000 | 300 ₹3,60,000 | 312 ₹3,74,400 | 130 ₹1,56,000 Lowest | 290 ₹3,48,000 | 301 ₹3,61,200 |
| 5.00 | Rendering 15mm thick in cement mortar 1:6 on fair faces of bricks work/concrete surface finished the surface even and smooth(without using extra cement) as on walls complete all as specified and directed by Engineer-in-charge. | 1,000 | Sqm | 180 ₹1,80,000 | 200 ₹2,00,000 | 140 ₹1,40,000 | 150 ₹1,50,000 | 310 ₹3,10,000 | 300 ₹3,00,000 | 312 ₹3,12,000 | 130 ₹1,30,000 Lowest | 295 ₹2,95,000 | 315 ₹3,15,000 |
| 6.00 | Rendering 10mm thick in cement mortar 1:3 on fair faces of bricks work/concrete surface finished the surface even and smooth(without using extra cement) as on walls complete all as specified and directed by Engineer-in-charge.
Notes :- Plaster shall be carried out upto any height in patches and contractor shall have no claim for height and scaffolding what so ever is required to complete the work. | 500 | Sqm | 170 ₹85,000 | 160 ₹80,000 | 150 ₹75,000 | 180 ₹90,000 | 310 ₹1,55,000 | 300 ₹1,50,000 | 312 ₹1,56,000 | 130 ₹65,000 Lowest | 290 ₹1,45,000 | 300 ₹1,50,000 |
| 7.00 | Removing existing paint by scrapping with TruCare Wall Sander L-01/H-01 (having mechanical vacuum mechanism) or equivalent as recommended by the manufacturer and approved by the GE, having RPM not less than 1500, sanding pad of 80 Grit having dia of 7"/9" to make the surface free from dust, loose paint etc. by skilled labour complete all as specified and directed by Engineer-in-charge. | 3,300 | Sqm | 21 ₹69,300 | 7 ₹23,100 | 10 ₹33,000 | 11 ₹36,300 | 8 ₹26,400 | 5 ₹16,500 Lowest | 10 ₹33,000 | 5 ₹16,500 Lowest | 8 ₹26,400 | 20 ₹66,000 |
| 8.00 | Providing and applying 2mm thick waterproof cement based putty @ 1Kg (undiluted) per Sqm of Asian Paints or its equivalent over the plastered/ old painted wall after scrapping to prepare the surface even and smooth,complete all as specified and directed by Engineer-in-charge.
Step 1) Mix the putty powered by adding 40-50% water and mix it with Putty mixer (Trucare Putty mixer capacity of min 2.5 kg putty per minute).
Step 2) Applying wall putty using mechanized spray machine/ manually (Where mechanized spray application is not practicable or as directed), ensuring uniform thickness and smooth finish, including surface preparation, mixing, spraying, leveling,
Step 3) Allow 6-8 hrs time to dry the putty surface. | 3,300 | Sqm | 52 ₹1,71,600 Lowest | 85 ₹2,80,500 | 100 ₹3,30,000 | 90 ₹2,97,000 | 100 ₹3,30,000 | 95 ₹3,13,500 | 101 ₹3,33,300 | 60 ₹1,98,000 | 90 ₹2,97,000 | 112 ₹3,69,600 |
| 9.00 | Sanding of the putty surface with Asian Paints TruCare wall sander: L-01/H-01 or equivalent (having mechanical vacuum mechanism) or equivalent as reccmmended by the manufacturer and approved by the GE, having RPM not less than 1500, sanding pad of 240 Grit or above having dia of 7"/9" to make the surface free from dust etc. by skilled labour, complete all as specified and directed by Engineer-in-charge. | 3,300 | Sqm | 55 ₹1,81,500 | 7 ₹23,100 | 10 ₹33,000 | 11 ₹36,300 | 10 ₹33,000 | 5 ₹16,500 Lowest | 12 ₹39,600 | 5 ₹16,500 Lowest | 8 ₹26,400 | 15 ₹49,500 |
| 10.00 | Providing and applying, one coat of acrylic waterbased interior/exterior grade primer @ 0.8 itr (undiluted)/10Sqm diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine of paint application of Asian Paints Trucare Graco or equivalent as recommended by the manufacturer and approved by GE, having an electric motor of min 1 HP with a flow speed of min 1 itr per minute having a pressure of 3300 PSI Allow 6-8 hrs to dry the surface for painting of subsequent coats, complete all as specified and directed by Engineer-in-charge. | 3,300 | Sqm | 70 ₹2,31,000 | 18 ₹59,400 | 20 ₹66,000 | 21 ₹69,300 | 22 ₹72,600 | 15 ₹49,500 | 26 ₹85,800 | 30 ₹99,000 | 10 ₹33,000 Lowest | 26 ₹85,800 |
Tender Value
₹50.0 L
EMD Value
₹1 L
Closing Date
12 May 2026, 6:00 pmClosed
GE (Utilities) Udhampur
GE (Utilities) Udhampur PO-Garhi Pin-182121
Periodical services to Hospital Bldg and other than hospital bldg at CHNC and other areas under GE (Utilities) Udhampur
2026_MES_761319_1
GE/U-15/2026-27
Open Tender
Miscellaneous Works
Item Rate
180 days
GE (Utilities) Udhampur
AS PER NIT
8 documents required · 8 mandatory
₹500
GE (Utilities) Udhampur
₹1 L
25 May 2026
21 Apr 2026
14 May 2026
21 Apr 2026
12 May 2026
5 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Taking down cement plaster, any description, on brick or stone walls, etc. including raking out joints hacking for key, scrubbing down with water etc. complete all as specified and directed by Engineer-in-Charge. | - | Sqm | - | - |
| - | Demolition of brick work or stone /boulder masonry, built in cement mortar, including all quoins, arches, pillars etc but excluding ashlar facing, dressed stone work and precast concrete articles etc, complete all as specified and directed by Engineer-in-charge. | - | Cum | - | - |
| - | Brick work with sub class 'B' bricks straight or curved on plan, exceeding 6 m mean radius with old size bricks, built in cement mortar 1:6, complete all as specified and directed by Engineer-in-charge. | - | Cum | - | - |
| - | Rendering 15mm thick in cement mortar 1:4 on fair faces of bricks work/concrete surface finished the surface even and smooth (without using extra cement) as on walls complete all as specified and directed by Engineer-in-charge.
Notes :- Plaster shall be carried out upto any height in patches and contractor shall have no claim for height and scaffolding what so ever is required to complete the work. | - | Sqm | - | - |
| - | Rendering 15mm thick in cement mortar 1:6 on fair faces of bricks work/concrete surface finished the surface even and smooth(without using extra cement) as on walls complete all as specified and directed by Engineer-in-charge. | - | Sqm | - | - |
| - | Rendering 10mm thick in cement mortar 1:3 on fair faces of bricks work/concrete surface finished the surface even and smooth(without using extra cement) as on walls complete all as specified and directed by Engineer-in-charge.
Notes :- Plaster shall be carried out upto any height in patches and contractor shall have no claim for height and scaffolding what so ever is required to complete the work. | - | Sqm | - | - |
| - | Removing existing paint by scrapping with TruCare Wall Sander L-01/H-01 (having mechanical vacuum mechanism) or equivalent as recommended by the manufacturer and approved by the GE, having RPM not less than 1500, sanding pad of 80 Grit having dia of 7"/9" to make the surface free from dust, loose paint etc. by skilled labour complete all as specified and directed by Engineer-in-charge. | - | Sqm | - | - |
| - | Providing and applying 2mm thick waterproof cement based putty @ 1Kg (undiluted) per Sqm of Asian Paints or its equivalent over the plastered/ old painted wall after scrapping to prepare the surface even and smooth,complete all as specified and directed by Engineer-in-charge.
Step 1) Mix the putty powered by adding 40-50% water and mix it with Putty mixer (Trucare Putty mixer capacity of min 2.5 kg putty per minute).
Step 2) Applying wall putty using mechanized spray machine/ manually (Where mechanized spray application is not practicable or as directed), ensuring uniform thickness and smooth finish, including surface preparation, mixing, spraying, leveling,
Step 3) Allow 6-8 hrs time to dry the putty surface. | - | Sqm | - | - |
| - | Sanding of the putty surface with Asian Paints TruCare wall sander: L-01/H-01 or equivalent (having mechanical vacuum mechanism) or equivalent as reccmmended by the manufacturer and approved by the GE, having RPM not less than 1500, sanding pad of 240 Grit or above having dia of 7"/9" to make the surface free from dust etc. by skilled labour, complete all as specified and directed by Engineer-in-charge. | - | Sqm | - | - |
| - | Providing and applying, one coat of acrylic waterbased interior/exterior grade primer @ 0.8 itr (undiluted)/10Sqm diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine of paint application of Asian Paints Trucare Graco or equivalent as recommended by the manufacturer and approved by GE, having an electric motor of min 1 HP with a flow speed of min 1 itr per minute having a pressure of 3300 PSI Allow 6-8 hrs to dry the surface for painting of subsequent coats, complete all as specified and directed by Engineer-in-charge. | - | Sqm | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
TENDER15.pdf
Tender Documents • 1.04 MB
BOQ_852785.xls
BOQ • 11.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .