Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Finance | Not Admitted-Finance Others-FDR/EMD not submitted by the firm |
| 4 | Not Admitted-Finance 1008 A PREMIER ENGINEERING COMPANY PURVI RITHANI MEERUT DELHI ROAD MEERUT UTTAR PRADESH 250103 INDIA | MEERUT | UTTAR PRADESH | 250103 | Not Admitted-Finance Others-FDR/EMD not submitted by the firm |
| 5 | Not Admitted-Finance | Not Admitted-Finance Others-FDR/EMD not submitted by the firm |
Tender Value
Refer Docs
EMD Value
₹15,700
Closing Date
12 Jul 2025, 11:15 amClosed
EE ENM M-III
DELHI JAL BOARD C BLOCK SECTOR-19 ROHINI DELHI-89
Replacement of tube well starter panels up to 10 HP at Suraj Park tube well No. 145 N 6 Pump house no. 145and 6 sector18 ward no 54 and Rohini D under Rohini constituency in Rohini AC 13
2025_DJB_274992_19
NIT NO. 08(2025-26) M-III
Open Tender
Miscellaneous Works
Item Rate
30 days
EE ENM M-III
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Account No 50448339804
₹15,700
Yes
25 Jul 2025
5 Jul 2025
12 Jul 2025
5 Jul 2025
12 Jul 2025
5 Jul 2025
S/o Submersible cable with copper conductor having 3 core sizes 6.0 SQ 200 mm working on 1100V Make:HAvells/gloster/djb approved make
S/o of PVC insulated copper conductor armored cable 16 sq mm having 4core Make: Make: Havells/gloster/djb approved make
Dismantling Old Panel, Disconnecting outgoing and incoming 08 connections and cables & marking them properly. Removing connections from earthling strip, Carefully unbolt and remove the old Panels using proper lifting arrangements
Installation of above panel at site as per direction of engineer-in-charge with the help of manual labor required tools, tackles and tackles, by placing new panel on the frame/foundation, leveling and align the panel by using spirit level/ plumb to ensure upright position, bolt panel securely to avoid vibrations.
Testing and commissioning by checking all connections are tight and properly insulated, performing insulation resistance test, checking of earthing continuity, test operation of individual components, energize the panel and check voltage each phase, Run the motor on no load to observe current, voltages, phase sequence, and run the motor on full load after all above checks.
Shakti Trading Co. (BID ID -1599211)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .