| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC ACCEPTED BEING LOWEST AS PER NIT |
| 2 | L2₹1.5 CrRejected-Finance BANPUR BATWARA SRINAGAR 190004 J K | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190004 | ₹1.5 Cr | L2 | Rejected-Finance Rejected being L2 bidder |
| 3 | L3₹1.5 CrRejected-Finance | ₹1.5 Cr | L3 | Rejected-Finance Rejected being L3 bidder |
| 4 | L4₹1.5 CrRejected-Finance | ₹1.5 Cr | L4 | Rejected-Finance Rejected being L4 bidder |
| 5 | Rejected-Technical | - | - | Rejected-Technical Firm is three class below and not enlisted for requisite class of wk as stipulated in NIT |
| Sl No | Description | Qty | Unit | M/S SMA and SONS CONSTRUCTIONS L3 | m/s mohd saleem and co L1 | M/S Tajamul Ah Buchh L4 | M/S SUHEEL CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out soft/loose soil etc complete all as specified and directed. | 129 | Sqm | 40 ₹5,160 | 20 ₹2,580 Lowest | 20 ₹2,580 Lowest | 30 ₹3,870 |
| 2.00 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in soft/loose soil etc complete all as specified and directed. | 73.66 | Cum | 100 ₹7,366 Lowest | 180 ₹13,258.8 | 120 ₹8,839.2 | 100 ₹7,366 Lowest |
| 3.00 | All as per ser item No. 2 here-in-before but additional 1.5m or part thereof in depth beyond the first 1.5 m and getting out in soft/loose soil etc complete all as specified and directed. | 3 | Cum | 100 ₹300 Lowest | 180 ₹540 | 150 ₹450 | 200 ₹600 |
| 4.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm loose/soft soil etc complete all as specified and directed. | 107.51 | Cum | 50 ₹5,375.5 Lowest | 50 ₹5,375.5 Lowest | 100 ₹10,751 | 100 ₹10,751 |
| 5.00 | Removing excavated material n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point etc complete all as specified and directed. | 64.84 | Cum | 110 ₹7,132.4 | 50 ₹3,242 Lowest | 110 ₹7,132.4 | 150 ₹9,726 |
| 6.00 | Rough excavation not exe 1.5 m deep and getting out in soft and loose soil complete all as specified and directed. | 450 | Cum | 110 ₹49,500 Lowest | 180 ₹81,000 | 110 ₹49,500 Lowest | 110 ₹49,500 Lowest |
| 7.00 | All as per ser item No 06 here-in-before but exe 1.5 m n.exe 3m deep and getting out in soft /loose soil complete all as specified and directed. | 30 | Cum | 130 ₹3,900 Lowest | 180 ₹5,400 | 150 ₹4,500 | 150 ₹4,500 |
| 8.00 | Removing excavated material to a distance exc 250m but not exc 500 and depositing where directed complete all as specified and directed. | 480 | Cum | 125 ₹60,000 | 50 ₹24,000 Lowest | 100 ₹48,000 | 110 ₹52,800 |
| 9.00 | Excavating over areas, n exc 1.5m deep for foundation and getting out in soft / loose soil complete all as specified and directed. | 193.5 | Cum | 100 ₹19,350 Lowest | 180 ₹34,830 | 120 ₹23,220 | 100 ₹19,350 Lowest |
| 10.00 | Excavating in over areas exc 1.5m and n exc. 3.0m depth for foundation etc. and getting out soft/loose soil complete all as specified and directed. | 112.4 | Cum | 125 ₹14,050 | 180 ₹20,232 | 130 ₹14,612 | 120 ₹13,488 Lowest |
Tender Value
₹1.4 Cr
EMD Value
₹2.1 L
Closing Date
5 Jun 2026, 6:00 pmClosed
CWE, HQ 133 WORKS ENGRS
HQ 133 WORKS ENGRS PIN-914133 C/O 56 APO
CWEK/TOKEN-144/874 EWS/2025-26 PROVN OF BOREWALL AND ALLIED INFRA IN THE AOR OF AGE B/R-II AND AGE E/M UNDER GE 874 EWS (JOB NO LXVII/01/AMWP/PANZGAM/2022-23)
2026_MES_753464_3
CWEK/TOKEN-144/874 EWS/2025-26
Open Tender
Civil Works
Item Rate
180 days
GE 874 EWS
Class B and above and category a (i) and (ii)
7 documents required · 7 mandatory
₹1,000
GE 874 EWS
₹2.1 L
8 Jul 2026
22 May 2026
13 Jun 2026
22 May 2026
5 Jun 2026
30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out soft/loose soil etc complete all as specified and directed. | 129 | Sqm | - | - |
| 2 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in soft/loose soil etc complete all as specified and directed. | 73.66 | Cum | - | - |
| 3 | All as per ser item No. 2 here-in-before but additional 1.5m or part thereof in depth beyond the first 1.5 m and getting out in soft/loose soil etc complete all as specified and directed. | 3 | Cum | - | - |
| 4 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm loose/soft soil etc complete all as specified and directed. | 107.51 | Cum | - | - |
| 5 | Removing excavated material n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point etc complete all as specified and directed. | 64.84 | Cum | - | - |
| 6 | Rough excavation not exe 1.5 m deep and getting out in soft and loose soil complete all as specified and directed. | 450 | Cum | - | - |
| 7 | All as per ser item No 06 here-in-before but exe 1.5 m n.exe 3m deep and getting out in soft /loose soil complete all as specified and directed. | 30 | Cum | - | - |
| 8 | Removing excavated material to a distance exc 250m but not exc 500 and depositing where directed complete all as specified and directed. | 480 | Cum | - | - |
| 9 | Excavating over areas, n exc 1.5m deep for foundation and getting out in soft / loose soil complete all as specified and directed. | 193.5 | Cum | - | - |
| 10 | Excavating in over areas exc 1.5m and n exc. 3.0m depth for foundation etc. and getting out soft/loose soil complete all as specified and directed. | 112.4 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
Tender144.pdf
Tender Documents • 1.67 MB
BOQ_859280.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].