Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC 1 10 PURBACHAL DURGAPUR WEST BENGAL PIN 713201 | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713201 | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹3.5 L+₹27,000 (8.49%)Rejected-AOC SBSTC GARAGE MORE DURGAPUR WEST BENGAL PIN 713201 | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713201 | L2 | Rejected-AOC L2 bidder | |
| 3 | L3₹3.6 L+₹45,300 (14.2%)Rejected-AOC MAMC DVC MORE B 2 BATTALA V K NAGAR DURGAPUR WEST BENGAL PIN 713210 | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713210 | L3 | Rejected-AOC L3 bidder |
| Sl No | Description | Qty | Unit | ASHA ENGINEERING CO L1 | LALIN SINGH CONSTRUCTION L2 | M/S SINGH ELECTRICAL L3 |
|---|---|---|---|---|---|---|
| 1.00Shifting and erection | ||||||
| 1.01 | Dismantling of old AVR control panel cubicle of 300MW Unit 7 and shifting to store.
Shifting of new panel cubical from store to site.
Erection of new control cubicle with existing panels.
All cable from control cubicle disconnection and re-connection with cable tagging ferruling etc. | 1 | Lot | 1,53,700 ₹1,53,700 Lowest | 1,65,000 ₹1,65,000 | 1,73,250 ₹1,73,250 |
| 1.02 | During SIEMENS make new protection panel commissioning of 300MW Unit 7,
During OCC and SCC bidder has to carried out the necessary arrangement in 220KV switchyard.
Bidder has to arrange for REF and differential stability study.
Disconnection and re connection of Unit #7 metering panel cables with necessary tagging, ferruling etc. | 1 | Lot | 1,43,100 ₹1,43,100 Lowest | 1,55,000 ₹1,55,000 | 1,62,750 ₹1,62,750 |
| 1.03 | Enabling jpb of Unit#8 Overhauling including assistance towards commissioning of Auto-synchronizer in 250MW U nit 8, BB differential relay in 220KV switchyard , retrofitting of motor protection relay in Unit 8 | 1 | Lot | 21,200 ₹21,200 Lowest | 25,000 ₹25,000 | 27,300 ₹27,300 |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
3 May 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
the GM Power and Project
Office of the GM Power and Project
Shifting and erection of Unit 7 AVR and enabling job of Unit 8 and Unit 7 overhauling
2025_DPL_836084_1
WBDPL/PP/T/12028(18) /3/2025/CTMC/E/22
Open Tender
Miscellaneous Works
Item Rate
Office of the GM Power and Project
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6,000
Yes
13 Dec 2025
15 Apr 2025
7 May 2025
15 Apr 2025
3 May 2025
16 Apr 2025
Amount
Shifting and erection
Dismantling of old AVR control panel cubicle of 300MW Unit 7 and shifting to store. Shifting of new panel cubical from store to site. Erection of new control cubicle with existing panels. All cable from control cubicle disconnection and re-connection with cable tagging ferruling etc.
During SIEMENS make new protection panel commissioning of 300MW Unit 7, During OCC and SCC bidder has to carried out the necessary arrangement in 220KV switchyard. Bidder has to arrange for REF and differential stability study. Disconnection and re connection of Unit #7 metering panel cables with necessary tagging, ferruling etc.
Enabling jpb of Unit#8 Overhauling including assistance towards commissioning of Auto-synchronizer in 250MW U nit 8, BB differential relay in 220KV switchyard , retrofitting of motor protection relay in Unit 8
LALIN SINGH CONSTRUCTION (BID ID -6340721)
M/S SINGH ELECTRICAL (BID ID -6355278)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .