Tender Value
₹14.3 Cr
EMD Value
₹28.7 L
Closing Date
21 Jul 2023, 6:00 pmClosed
UIT SIKAR
UIT SIKAR
Construction of service lane road , foothpath, divider and other development worrks from ramu ka baas teeraha to riico teeraha krishi mandi teeraha at Sikar.
2023_UIKSK_347156_1
NIT-07
Open Tender
Civil Works
Percentage
365 days
SIKAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
RTGS/NEFT
₹28.7 L
Yes
UIT SIKAR
8 Aug 2023
29 Jun 2023
24 Jul 2023
29 Jun 2023
21 Jul 2023
29 Jun 2023
9 Jul 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part 'A' | - | - | - | - |
| - | Dismantling kerb stones by manual means and disposal of dismantled material with all lifts and upto a lead of 1000 m as per MoRTH Specification Clause 202 | 4,125 | Per Cum | 5 | ₹20,625 |
| - | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per MoRTH Specification Clause 202.By Mechanical Means.Cement Concret | 5,670 | Per Cum | 303 | ₹17,18,010 |
| - | Carriaage of materials i.e earth, sand , lime, morrum manure or sludge including loading and unloading and all lifts and leads . | 6,330 | Per Cum | 36 | ₹2,27,880 |
| - | Survey work of roads including ploting of L-section, X-Section @ 25m c/c interval showing existing Ground level line, proposed level line in different colour with clour back ground of graph sheet of 1 mm square size showing all the required details as per IRC : SP-20 and IRC-19 Pliting work shall include plan of the road showing required curve details width of existing road, if any and proposed road. toe line, width of revenue track. proposed location of borrow area width making of cattle crossing location, Lay bye and Bus locations, ramp locations, permanent structure / Electric pole / Telephone / Tree etc. (Print of L- Section sheet shall be for 1 Km. )On CD work location, survey work required on 0.5 Km. on either side of CD works and L-section ahall be proposed on separate A-4 size sheet for eatch CD works and same shall be superimposed on X-section showing proposed CD work in different colour line and details of slope of CD work etc.E/W calculation of road work shall including ploting of X-section Max 2 Nos on A-4 size sheet showing line of subgrade and embankment with E/W Calcution sheet showing quantum of E/W involyed in sub grade in embankment E/W in cutting and Qty of E/W cutting adjusted in filling within 100 m lead. | 4 | Per Km | 2,250 | ₹9,000 |
| - | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 27,000 | Per Cum | 32 | ₹8,64,000 |
| - | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 11,520 | Per Cum | 178 | ₹20,50,560 |
| - | Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300-1 and 300-2 as per MoRTH Specification Clause 305.3 | 3,960 | Per Cum | 34 | ₹1,34,640 |
| - | Carriaage of materials i.e earth, sand , lime, morrum manure or sludge including loading and unloading and all lifts and leads . | 38,520 | Per Cum | 36 | ₹13,86,720 |
| - | Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300-1 and 300-2 for subgrade construction as per MoRTH Specification Clause 305.3.4 | 13,440 | Per Cum | 33 | ₹4,43,520 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
technicalbid11.pdf
Tender Documents • 2.53 MB
BOQ_617463.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .