Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
17 Sept 2026, 3:00 pmClosed
E.E.-VI
1, HOGG STREET, KOLKATA-87
RESTORATION OF KERB AND CHANNEL IN VERIOUS LOCATIONS LIKE 61E M.I. LN,32A .G.C BOSE RD,156 AJC BOSE RD, 15 CANTOPHER LN ETC. IN WD-054.
2026_KMC_1041304_1
VI/054/005/2026-2027/D (2ND CALL)
Open Tender
CIVIL WORKS
Percentage
30 days
WARD 54
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,000
19 Sept 2026
9 Sept 2026
19 Sept 2026
9 Sept 2026
17 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. | 454 | MTR | 8.17 | ₹3,709.18 |
| 2 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone. | 454 | MTR | 8.17 | ₹3,709.18 |
| 3 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion. ( 3rd Corrigenda & addenda dated 04.06.2018) | 15.32 | M3 | 4,761 | ₹72,950.42 |
| 4 | Supplying and laying factory made vertical kerb stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated size 500mm X 350mm X 150mm tapered at top, making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-divider / footpath) | 52 | EA | 292.48 | ₹15,208.96 |
| 5 | Supplying and laying factory made flat channel stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated; size 500mm X 300mm X 100 mm; making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder) | 52 | EA | 211.19 | ₹10,981.88 |
| 6 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2).a) Vertical Kerb ( Ref :Rate based on PWD Current SOR. [PWD(B) 2017, p-303 & 3rd corri. Addea dtd-04.06.2018. P-52 ]) | 402 | MTR | 21.43 | ₹8,614.86 |
| 7 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). b) flat channel stone. | 402 | MTR | 18.24 | ₹7,332.48 |
| 8 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge | 5 | M3 | 166 | ₹830 |
| 111 | Estimated amount | - | - | - | - |
| 112 | Add: 9%SGST | 1 | LS | 13,091.41 | ₹13,091.41 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.74 MB
BOQ_2556828.xls
BOQ • 0.29 MB
F5405.pdf
Tender Documents • 0.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .