| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.1 LAccepted-AOC 83 158 4 VMS COMPLES RSP NAGAR ELLIS NAGAR POST DHARAPURAM TALUK TIRUPPUR DISTRICT | ERODE | TAMIL NADU | 638051 | ₹56.1 L | L1 | Accepted-AOC BID ACCEPED HENCE L1 BIDDER |
| 2 | L2₹57.0 LRejected-AOC | ₹57.0 L | L2 | Rejected-AOC BID REJECTED HENCE L2 BIDDER |
| Sl No | Description | Qty | Unit | shree construction L1 | S Kuppusamy L2 |
|---|---|---|---|---|---|
| 1.00 | 1.Upgaradation to the Road from Vanjiyamman Kovil Road to Pottikkampalayam Road Km 0/0 - 1/200 | 1 | No | - | - |
| 2.00 | Clearing the Scrub jungle including all labour charges for burying and burning etc., complete. | 12.96 | Sqm | 6.35 ₹8,229.60 | 7 ₹90.72 |
| 3.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS 20 A | 864 | Cum | 140.45 ₹1.2 L | 155 ₹1.3 L |
| 4.00 | Collection and supply of gritty gravel from approved quarry including all labour charges for spreading and compaction with power roller etc. complete, for Shoulders | 1 | No | - | - |
| 5.00 | Km 0/0 - 1/0 | 360 | Cum | 772.1 ₹2.8 L | 620 ₹2.2 L |
| 6.00 | Km 1/0 - 1/200 | 72 | Cum | 772.1 ₹55,591.20 | 630 ₹45,360 |
| 7.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 | 182.25 | Cum | 2,529.75 ₹4.6 L | 2,700 ₹4.9 L |
| 8.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 1 | Cum | - | - |
| 9.00 | Km 0/0 - 1/0 | 477.66 | Cum | 2,589 ₹12.4 L | 2,800 ₹13.4 L |
| 10.00 | Km 1/0 - 1/200 | 103.91 | Cum | 2,589 ₹2.7 L | 2,800 ₹2.9 L |
Tender Value
₹56.6 L
EMD Value
₹56,630
Closing Date
27 Feb 2026, 3:00 pmClosed
Block Development Officer BP Madathukulam
Block Development Officer BP Madathukulam
Upgaradation to the Road from Vanjiyamman Kovil Road to Pottikkampalayam Road Km 0/0 - 1/200 SFC (DP) 2025 2026
2026_RDTN_663749_1
SFC (2025-2026) Package 02 (ROC No.484/2025)
Open Tender
Civil Works - Roads
Dharapuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹56,630
Yes
6 Mar 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
1.Upgaradation to the Road from Vanjiyamman Kovil Road to Pottikkampalayam Road Km 0/0 - 1/200
Clearing the Scrub jungle including all labour charges for burying and burning etc., complete.
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS 20 A
Collection and supply of gritty gravel from approved quarry including all labour charges for spreading and compaction with power roller etc. complete, for Shoulders
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over BM surface using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision fot T JUCTION Board
STOP sign board 750mm
Major road ahead
Rumble strips ahead
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous surface
Provision for KM Stone
Provision for HM Stone
Provision for Sign Board
Provision for Reflective Studs
Provision for Hazard Board
Provision for Rumble Strips
Provision for Single Row Pipe Culvert Ch:- 890 m
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors
Supplying and fixing of RCC hume pipes with suitabe Collars Including cost of Pipes and Labour charges etc, complete.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading etc.complete,
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
02.pdf
Tender Documents • 0.87 MB
BOQ_796915.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid